[2] |
王家鼎,黄海国,阮爱国. 滑坡体滑动轨迹的研究[J]. 中国地质灾害与防治学报,1991,2(2):1-10.(WANG Jiading,HUANG Haiguo,RUAN Aiguo. The study on sliding locus for landslide mass[J]. The Chinese Journal of Geological Hazard and Control,1991,2(2):1-10.(in Chinese))
|
[5] |
程谦恭,彭建兵. 高速岩质滑坡动力学[M]. 成都:西南交通大学出版社,1999:133-138.(CHENG Qiangong,PENG Jianbing. Dynamics for high-speed rocky landslide[M]. Chengdu:Southwest Jiaotong University Press,1999:133-138.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[6] |
SCOTT M,OLDRICH H. A model for the analysis of rapid landslide motion across three-dimensional terrain[J]. Canadian Geotechnical Journal,2004,41(6):1 084-1 097.
Your browse does not support frame! " target="_blank">
|
[10] |
巫锡勇,王效宁. 岩质顺层滑坡运动特征的研究[J]. 西安交通大学学报,1990,(3):89-98.(WU Xiyong,WANG Xiaoning. Research on the motion characteristics of along-bedding landslip[J]. Journal of Xi?an Jiaotong University,1990,(3):89-98.(in Chinese))
|
[13] |
CROSTA G B. Forecasting hazard scenarios and implications for the evaluation of countermeasure efficiency for large debris avalanches[J]. Engineering Geology,2006,83(1/3):236-253.
Your browse does not support frame! " target="_blank">
|
[14] |
黄润秋,许 强,陶连金,等. 地质灾害过程模拟和过程控制研究[M]. 北京:科学出版社,2002:78-92.(HUANG Runqiu,XU Qiang,TAO Lianjin,et al. Simulation and control of geohazards process[M]. Beijing:Science Press,2002:78-92.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[16] |
胡明鉴,汪 稔,陈中学,等. 泥石流启动过程PFC数值模拟[J].岩土力学,2010,31(增1):394-398.(HU Mingjian,WANG Ren,CHEN Zhongxue,et al. Initiation process simulation of debris deposit based on particle flow code[J]. Rock and Soil Mechanics,2010,31(Supp.1):394-398.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[18] |
陈胜宏,万 娜. 边坡稳定分析的三维剩余推力法[J]. 武汉大学学报:工学版,2005,38(3):70-73.(CHEN Shenghong,WAN Na. Study of three-dimensional residual thrust method for slope stability analysis[J]. Engineering Journal of Wuhan University,2005,38(3):70-73.(in Chinese))
|
[21] |
中国科学院力学研究所. 重庆武隆鸡尾山滑坡失稳机制研究初步结果[R]. 北京:中国科学院力学研究所,2010.(Institute of Mechanics,China Academy of Sciences. The research of instability mechanism of Jiweishan landslide in Wulong Chongqing[R]. Beijing:Institute of Mechanics,China Academy of Sciences,2010.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[3] |
刘忠玉,马崇武,苗天德,等. 高速滑坡远程预测的块体运动模型[J]. 岩石力学与工程学报,2000,19(6):742-746.(LIU Zhongyu,MA Chongwu,MIAO Tiande,et al. Kinematic block model of long run-out prediction for high-speed landslides[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(6):742-746.(in Chinese))
|
[8] |
吴 越,刘东升,李明军. 滑体下滑及冲击受灾体过程中的能耗规律模型试验[J]. 岩石力学与工程学报,2011,30(4):693-702.(WU Yue,LIU Dongsheng,LI Mingjun. Landslide model experiment for energy dissipation law in sliding and impact process[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(4):693-702.(in Chinese))
|
[1] |
潘家铮. 建筑物的抗滑稳定和滑坡分析[M]. 北京:水利出版社,1980:120-132.(PAN Jiazheng. Analysis of building?s stability against sliding and landslide[M]. Beijing:China Water Conservancy Press,1980:120-132.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[17] |
SPENCER E. A Method of analysis of the stability of embankments assuming parallel inter-slice forces[J]. Geotechnique,1967,17(1):11-26.
Your browse does not support frame! " target="_blank">
|
[22] |
刘 君,王丽丽. 鸡尾山滑坡全过程数值模拟[C]// 2012颗粒材料计算力学会议. [S.l.]:[s.n.],2012:239-246.(LIU Jun,WANG Lili. Numerical simulation of Jiweishan landslide[C]// National Conference on Computational Mechanics of Granular Materials. [S.l.]:[s.n.],2012:239-246.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[4] |
汪 洋,刘 波,汪 为. 滑坡速度计算的改进条分法[J]. 安全与环境工程,2004,11(3):68-70.(WANG Yang,LIU Bo,WANG Wei. Improved slice method for landslide speed calculation[J]. Safety and Environmental Engineering,2004,11(3):68-70.(in Chinese))
|
[7] |
OLDRICH H. A model for the run out analysis of rapid flow slides,debris flows and avalanches[J]. Canadian Geotechnical Journal,1995,32(4):610-623.
Your browse does not support frame! " target="_blank">
|
[9] |
吴 越,刘东升,李硕洋. 基于滑体与受灾体共同作用的冲击能计算模型[J]. 岩石力学与工程学报,2012,31(增1):2 636-2 643.(WU Yue,LIU Dongsheng,LI Shuoyang. Calculation model of impact energy based on interaction of landslide mass and disaster-affected bodies[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.1):2 636-2 643.(in Chinese))
|
[11] |
CHEN H,LEE C F. A dynamic model for rainfall-induced landslides on natural slopes[J]. Geomorphology,2003,51(4):269-288.
|
[12] |
殷坤龙,姜清辉,汪 洋. 新滩滑坡运动全过程的非连续变形分析与仿真模拟[J]. 岩石力学与工程学报,2002,21(7):959-962.(YIN Kunlong,JIANG Qinghui,WANG Yang. Numerical simulation on the movement process of Xintan landslide by DDA method[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(7):959-962.(in Chinese))
|
[15] |
张 龙,唐辉明,熊承仁,等. 鸡尾山高速远程滑坡运动过程PFC3D模拟[J]. 岩石力学与工程学报,2012,31(增1):2 601-2 611.(ZHANG Long,TANG Huiming,XIONG Chengren,et al. Movement process simulation of high-speed long-distance Jiweishan landslide with PFC3D[J]. Chinese Journal of Rock Mechanics and Engineering, 2012,31(Supp.1):2 601-2 611.(in Chinese))
Your browse does not support frame! " target="_blank">
|
[19] |
张均锋,丁 桦. 边坡稳定性分析的三维极限平衡法及应用[J]. 岩石力学与工程学报,2005,24(3):365-370.(ZHANG Junfeng,DING Hua. Generalized 3D limit-equilibrium method for slope stability analysis and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(3):365-370.(in Chinese))
|
[20] |
许 强,黄润秋,殷跃平,等. 2009年6•5重庆武隆鸡尾山崩滑灾害基本特征与成因机制初步研究[J]. 工程地质学报,2009,17(4):433-444.(XU Qiang,HUANG Runqiu,YIN Yueping,et al. The Jiweishan landslide of June 5,2009 in Wulong,Chongqing:characteristics and failure mechanism[J]. Journal of Engineering Geology,2009,17(4):433-444.(in Chinese))
|