Abstract:The total length of Jinping II deep buried tunnel cross different geological units is more than 16 km. In the process of excavation,rockburst was controlled by the geological structure conditions and the local stress field. The tectonic rockburst is directly affected by the geological tectonics. Based on the systematic analysis of the forefront research results about rockburst in deep engineering home and abroad,and combined with the rockburst revealed by a large number of cases in Jinping II deep buried tunnel engineering,the tectonic rockbursts were further subdivided into end tectonic,slip tectonic and strain tectonic. The inverse analysis of the rockburst was carried out with the discrete element program and related risk evaluation index of rockburst. The mechanism of different kinds of tectonic rockburst in deep buried tunnel engineering was revealed,and the key controlling factors of rockburst and control mechanisms of various factors were analyzed. Finally,the corresponding control schemes were put forward according to the different types of tectonic rockburst.
张春生1,刘 宁1,2,褚卫江1,倪绍虎1. 锦屏二级深埋隧洞构造型岩爆诱发机制与案例解析[J]. 岩石力学与工程学报, 2015, 34(11): 2242-2250.
ZHANG Chunsheng1,LIU Ning1,2,CHU Weijiang1,NI Shaohu1. INDUCEMENT MECHANISM AND CASE ANALYSIS OF TECTONIC ROCKBURST IN JINPING II DEEP BURIED TUNNEL. , 2015, 34(11): 2242-2250.
COOK N G W. The failure of rock[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1965,2(4):389-395.
Your browse does not support frame!