Settlement behavior and inverse prediction of post-construction settlement of high filled loess embankment
GE Miaomiao1,LI Ning1,2,ZHANG Wei3,ZHENG Jianguo3,ZHU Caihui1
(Institute of Geotechnical Engineering,Xi?an University of Technology,Xi?an,Shaanxi 710048,China;2. School of Civil Engineering,Lanzhou Jiaotong University,Lanzhou,Gansu 730070,China;3. China Jikan Research Institute of Engineering
Investigation and Design Co.,Ltd.,Xi?an,Shaanxi 710043,China)
Abstract:In order to reveal the settlement behaviors of high filled embankment and to predict the post-construction settlement,the long-term in-situ monitoring data of a certain high filled loess embankment were analyzed with the FEM computation and the method of layered iteration to inversely predict the post-construction settlement. The results show that the settlement of the embankment itself is the main part of the total settlement and accounts for 63% of the total settlement,while the original ground settlement accounts for 37%. The construction settlement is mainly caused by the compression of the pore air and exhaust consolidation. The uneven foundation and different heights are the main reasons of differential surface settlement.
[1] 何兆益,周虎鑫. 高填方路堤填筑体沉降的三维有限元分析[J]. 重庆交通学院学报,2000,19(3):58–62.(HE Zhaoyi,ZHOU Huxin. 3D finite element analysis of subsidence on high embankment[J]. Journal of Chongqing Jiaotong Institute,2000,19(3):58–62.(in Chinese))
[2] 朱才辉,李 宁. 基于修正 FDA 方法的黄土高填方地基工后沉降分析[J]. 岩石力学与工程学报,2015,34(增1):3 408–3 416.(ZHU Caihui,LI Ning. Post-construction settlement analysis of loess-high filled foundation based on modified FDA approach[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(Supp.1):3 408–3 416. (in Chinese))
[3] 陈 磊,刘汉龙,陈永辉. 高速公路拓宽工程地基处理效果的数值分析[J]. 岩土力学,2006,27(11):2 066–2 070.(CHEN Lei,LIU Hanlong,CHEN Yonghui. Numerical analysis of foundation improvement effect for expressway widening engineering[J]. Rock and Soil Mechanics,2006,27(11):2 066–2 070.(in Chinese))
[4] 唐朝生,刘义怀,施 斌,等. 新老路基拼接中差异沉降的数值模拟[J]. 中国公路学报,2007,20(2):13–17.(TANG Chaosheng,LIU Yihuai,SHI Bin,et al. Numerical simulation on differential settlement of jointing of new and old roadbed[J]. China Journal of Highway and Transport,2007,20(2):13–17.(in Chinese))
[5] 徐 明,宋二祥. 高填方长期工后沉降研究的综述[J]. 清华大学学报:自然科学版,2009,49(6):770–773.(XU Ming,SONG Erxiang. Review of long-term settling of high fills[J]. Journal Tsinghua University:Science and Technology,2009,49(6):770–773.(in Chinese))
[6] 崔晓如. 高填方路基沉降变形分析与预测及其控制标准研究[硕士学位论文][D]. 长沙:长沙理工大学,2010.(CUI Xiaoru. Analysis of settlement deformation and prediction and its research on the control standards of high-fill embankment[M. S. Thesis][D]. Changsha:Changsha University of Science and Technology,2010.(in Chinese))
[7] 刘萌成,黄晓明,陶向华. 桥台后高填方路堤工后沉降影响因素分析[J]. 交通运输工程学报,2005,5(3):36–40.(LIU Mengcheng,HUANG Xiaoming,TAO Xianghua. Influence factors on post-construction settlement of high backfills adjacent to abutment[J]. Journal of Traffic and Transportation Engineering,2005,5(3):36–40.(in Chinese))
[8] 王丽琴,靳宝成,杨有海. 黄土路堤工后沉降预测新模型与方法[J]. 岩石力学与工程学报,2007,26(11):2 370–2 375.(WANG Liqin,JIN Baocheng,YANG Youhai. New model and method for forecasting post- construction settlement of loess-fill embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2 370–2 375.(in Chinese))
[9] 潘林有,谢新宇. 用曲线拟合的方法预测软土地基沉降[J]. 岩土力学,2004,25(7):1 053–1 058.(PAN Linyou,XIE Xinyu. Observational settlement prediction by curve fitting methods[J]. Rock and Soil Mechanics,2004,25(7):1 053–1 058.(in Chinese))
[10] 刘 宏,李攀峰,张倬元. 九寨黄龙机场高填方地基工后沉降预测[J]. 岩土工程学报,2005,27(1):90–93.(LIU Hong,LI Panfeng,ZHANG Zhuoyuan. Prediction of the post-construction settlement of the high embankment of Jiuzhai—Huanglong airport[J]. Chinese Journal of Geotechnical Engineering,2005,27(1):90–93.(in Chinese))
[11] 吕 庆,尚岳全,陈允法,等. 高填方路堤黏弹性参数反演与工后沉降预测分析[J]. 岩石力学与工程学报,2005,24(7):1 231–1 235. (LU Qing,SHANG Yuequan,CHEN Yunfa,et al. Back-analysis of visco-elastic parameters of filling materials and settlement prediction for high filled embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(7):1 231–1 235.(in Chinese))
[12] 朱才辉,李 宁,袁继国. 黄土冲沟中高填方土压力量测及分布规律探讨[J]. 岩土力学,2015,36(3):828–835.(ZHU Caihui,LI Ning,YUAN Jiguo. Measurement and distribution of earth pressure of high fill in loess gully[J]. Rock and Soil Mechanics,2015,36(3):828–835.(in Chinese))
[13] 方 焘,刁心宏. 填方路堤沉降计算方法探讨[J]. 铁道建筑,2009,(6):77–79.(FANG Tao,DIAO Xinhong. Embankment settlement calculation method discussed[J]. Railway Engineering,2009,(6):77–79.(in Chinese))
[14] 谭昌明,周 建,黄广龙. 多层软土地基沉降的分层迭代反演综合预测法[J]. 中国公路学报,2001,14(4):28–32.(TAN Changming,ZHOU Jian,HUANG Guanglong. Terative back-analysis layer by layer method to predict settlement of several layers soft clay ground[J]. China Journal of Highway and Transport,2001,14(4):28–32.(in Chinese))
[15] 朱才辉. 深厚黄土地基上机场高填方沉降规律研究[博士学位论文][D]. 西安:西安理工大学,2011.(ZHU Caihui. Settlement regularity study of loess-high filled airport foundation with large thickness[Ph. D. Thesis][D]. Xi?an:Xi?an University of Technology,2011.(in Chinese))