(1. Department of Civil Engineering,Zhejiang University City College,Hangzhou,Zhejiang 310015,China;
2. College of Civil Engineering and Architecture,Zhejiang University,Hangzhou,Zhejiang 310058,China)
Abstract:The jacking force changes dynamically due to the continuous decreasing height of overburden soil in vertical tunneling method. To study the variation law of jacking force in vertical jacking construction,combined with the spherical cavity expansion theory and shear failure principle,two calculation models of jacking force,spherical cavity expansion-sliding friction model and shear failure-sliding friction model,are proposed,and a new and complete system of theory of jacking force is established. Based on the actual monitoring data of drainage engineering in Beihai and the test data,the correctness and suitability of theoretical calculation formula is verified. The results show that the theoretical calculation method in this paper is in good agreement with the measured results and test data.
陈 闽,黄永富. 垂直顶升技术应用探讨[J]. 绿色科技,2011,48(5):201-204.(CHEN Min,HUANG Yongfu. The application of vertical jacking technique[J]. Journal of Green Science and Technology,2011,48(5):201-204.(in Chinese))
[2]
沙俊强. 引水隧道垂直顶升技术的研究及施工控制要点[J]. 中国给水排水,2016,32(18):118-122.(SHA Junqiang. Research and construction control points of vertical jacking technology for water diversion tunnel[J]. China Water and Wastewater,2016,32(18):118-122.(in Chinese))
[4]
杨春山,何 娜,刘力英,等. 垂直顶升施工上覆土层破坏形态的颗粒流模拟[J]. 公路,2020,65(3):356-360.(YANG Chunshan,HE Na,LIU Liying,et al. Particle flow simulation of failure mode of overburden soil layer in vertical jacking construction[J]. Highway,2020,65(3):356-360.(in Chinese))
[5]
徐世杨,刘叔灼,陈俊生,等. 盾构竖井垂直顶升施工阶段隧道变形分析[J]. 河南科学,2021,39(1):76-83.(XU Shiyang,LIU Shuzhuo,CHEN Junsheng,et al. Tunnel deformation in vertical jacking construction stage of shield shaft[J]. Henan Science,2021,39(1):76-83.(in Chinese))
[7]
WANG L Z,WANG Z,LI L L,et al. Construction behavior simulation of a hydraulic tunnel during standpipe lifting[J]. Tunnelling and Underground Space Technology,2011,26(6):674-685.
[8]
魏立新,杨春山,莫海鸿,等. 盾构竖井垂直顶管顶升力模型试验及离散元分析[J]. 中南大学学报:自然科学版,2021,52(10): 3 595-3 604.(WEI Lixin,YANG Chunshan,MO Haihong,et al. Model tests and discrete element analysis on jacking force of shield shaft vertical pipe jacking[J]. Journal of Central South University:Science and Technology,2021,52(10):3 595-3 604.(in Chinese))
[6]
王寿生,葛春辉. 垂直顶管计算方法的探讨[J]. 特种结构,2009,26(5):18-21.(WANG Shousheng,GE Chunhui. Study of vertical pipe jacking calculation method[J]. Special Structures,2009,26(5):18-21.(in Chinese))
[16]
中华人民共和国行业标准编写组. DG/TJ 08-2049—2016顶管工程施工规程[S]. 上海:同济大学出版社,2017.(The Professional Standards Compilation Group of People?s Republic of China. DG/TJ 08-2049—2016 Pipe jacking engineering construction specification[S]. Shanghai:Tongji University Press,2017.(in Chinese))
[3]
WANG L,SUN L,WANG Z,et al. Field monitoring of a subsea shield tunnel during standpipe lifting[J]. Tunnelling and Underground Space Technology,2015,45:52-62.
[13]
CARTER J P,BOOKER J R,YEUNG S K. Cavity expansion in cohesive frictional soils[J]. Geotechnique,1986,36(3):349-358.
[10]
史培新,俞蔡城,潘建立,等. 拱北隧道大直径曲线管幕顶管顶力研究[J]. 岩石力学与工程学报,2017,36(9):2 251-2 259.(SHI Peixin,YU Caicheng,PAN Jianli,et al. Analysis on the jacking load of the curved pipe roof supporting the large diameter Gongbei tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(9):2 251-2 259.(in Chinese))
[14]
刘俊伟. 静压开口混凝土管桩施工效应试验及理论研究[博士学位论文][D]. 杭州:浙江大学,2012.(LIU Junwei. Experimental and theoretical studies on the construction effects for jacked open-ended concrete pipe piles[Ph. D. Thesis][D]. Hangzhou:Zhejiang University,2012.(in Chinese))
[15]
ANAGNOSTOU G,KOVARI K. Face stability conditions with earth-pressure-balanced shields[J]. Tunnelling and Underground Space Technology,1996,11(2):165-173.
[18]
刘桂荣. 大型核、火电厂取水结构施工技术研究[硕士学位论文][D]. 上海:上海交通大学,2014.(LIU Guirong. Research on the construction techniques of the water intake structure of large-scale nuclear power and thermal power plants[M. S. Thesis][D]. Shanghai:Shanghai Jiaotong University,2014.(in Chinese))
[1]
闫自海,周烽淼,魏新江,等. 盾构隧道内垂直顶升法研究现状及展望[J]. 现代隧道技术,2018,55(增2):108-120.(YAN Zihai,ZHOU Fengmiao,WEI Xinjiang,et al. Review and prospects on standpipe lifting method in shield tunnels[J]. Modern Tunnelling Technology,2018,55(Supp.2):108-120.(in Chinese))
[11]
张明义,邓安福. 静压桩贯入地基的球孔扩张-滑动摩擦计算模式[J]. 岩土力学,2003,24(5):701-704.(ZHANG Mingyi,DENG Anfu. A spherical cavity expansion-sliding friction calculation model on penetration of pressed-in piles[J]. Rock and Soil Mechanics,2003,24(5):701-704.(in Chinese))
[9]
WEI X,WANG X,WEI G,et al. Prediction of Jacking force in vertical tunneling projects based on Neuro-Genetic models[J]. Journal of Marine Science and Engineering,2021,9(71):1-18.
[17]
董胜宪,罗树青. 垂直顶升法在电厂取排水隧道工程中的应用[J]. 电力勘测设计,2012,(6):47-51.(DONG Shengxian,LUO Shuqing. Application of vertical lifting method to water supply and drainage tunnel engineering in power plant[J]. Electric Power Survey and Design,2012,(6):47-51.(in Chinese))