[1] |
程良奎. 岩土锚固研究与新进展[J]. 岩石力学与工程学报,2005,24(21):3 803–3 811.(CHENG Liangkui. Research and new progress in ground anchorage[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3 803–3 811.(in Chinese))
|
[3] |
LITTLEJOHN G S. Corrosion protection of steel tendons for ground anchorages[J]. Ground Engineering,1990,23(9):34–39.
|
[5] |
TERZI N U,DALDAL G I,YILDIRIM S. Motoring a grouted anchor in a reinforced structure[J]. Experimental Techniques,2009,12(3):47–54.
|
[13] |
刘贞国. 预应力锚索结构的腐蚀行为[硕士学位论文][D]. 徐州:中国矿业大学,2014.(LIU Zhenguo. Corrosion behavior of prestressed anchor cable structures[M. S. Thesis][D]. Xuzhou:China University of Mining and Technology,2014.(in Chinese))
|
[15] |
任爱武,汪彦枢,王玉杰,等. 拉力集中全长黏结型锚索长期耐久性研究[J]. 岩石力学与工程学报,2011,30(3):493–499.(REN Aiwu,WANG Yanshu,WANG Yujie,et al. Research on durability of concentrated tension and full-bonded anchor cables[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(3):493–499.(in Chinese))
|
[10] |
杨启贵,高大水,吴海斌. 对我国岩土预应力锚索防腐措施和标准的探讨[J]. 岩土工程学报,2007,29(10):1 558–1 562.(YANG Qigui,GAO Dashui,Wu Haibing. Discussion on antiseptic measures and standards of geotechnical prestressed anchorage cables in China[J]. Chinese Journal of Geotechnical Engineering,2007,29(10):1 558–1 562.(in Chinese))
|
[17] |
夏 宁. 锈蚀锚固体的力学性能研究及耐久性评估初探[博士学位论文][D]. 南京:河海大学,2005.(XIA Ning. Study on the mechanical property of corroded anchorage structure and its durability evaluation[Ph. D. Thesis][D]. Nanjing:Hohai University,2005.(in Chinese))
|
[19] |
李久青,杜翠薇. 腐蚀试验方法及监测技术[M]. 北京:中国石化出版社,2007:10–12.(LI Jiuqing,DU Cuiwei. Corrosion test method and monitoring technology[M]. Beijing:China Petrochemical Press,2007:10–12.(in Chinese))
|
[20] |
张志亮. 预应力锚索耐腐蚀性及失效研究[硕士学位论文][D]. 北京:中国地质大学,2008.(ZHANG Zhiliang. The research of prestressed anchorage cable corrosion resistance and inactivation[M. S. Theis][D]. Beijing:China University of Geosciences,2008.(in Chinese))
|
[23] |
魏宝明. 金属腐蚀理论及应用[M]. 北京:化学工业出版社,1984:10–31.(WEI Baoming. Theory and application of metal corrosion[M]. Beijing:Chemical Industry Press,1984:10–31.(in Chinese))
|
[25] |
左景伊,左 禹. 腐蚀数据与选材手册[M]. 北京:化学工业出版社,1995:63–64.(ZUO Jingyi,ZUO Yu. Corrosion data and material selection manual[M]. Beijing:Chemical Industry Publishing House,1995:63–64.(in Chinese))
|
[27] |
中华人民共和国国家标准编写组. GB/T 5224—2003预应力混凝土用钢绞线[S]. 北京:中国计划出版社,2003.(The National Standards Compilation Group of People′s Republic of China. GB/T 5224—2003 Strand for prestressed concrete[S]. Beijing:China Planning Press,2003.(in Chinese))
|
[29] |
张继祥,朱 明,高 波,等. 高温受热后82B预应力钢绞线力学性能退化规律研究[J]. 上海金属,2013,35(3):12–15.(ZHANG Jixiang,ZHU Ming,GAO Bo,et al. Research on mechanical property deterioration of 82B prestressed steel strand post high temperature[J]. Shanghai Metals,2013,35(3):12–15.(in Chinese))
|
[30] |
宗钟凌,张 晋,蒋德稳,等. 高温后1860级钢绞线力学性能试验研究[J]. 消防科学与技术,2015,34(3):311–314.(ZONG Zhongling,ZHANG Jing,JIANG Dewen,et al. Experimental research on the mechanical properties of steel strand(fptk = 1 860 n/mm2) at elevated temperature[J]. Fire Science and Technology,2015,34(3):311–314.(in Chinese))
|
[33] |
MORESTIN F,BOIVIN M,SILVA C. Elasto plastic formulation using a kinematic hardening model for springback analysis in sheet metal forming[J]. Journal of Materials Processing Technology,1996,56(1):619–630.
|
[2] |
程良奎,韩 军,张培文. 岩土锚固工程的长期性能与安全评价[J]. 岩石力学与工程学报,2008,27(5):865–872.(CHENG Liangkui,HAN Jun,ZHANG Peiwen. Long-term performance and safety assessment of anchorage in geotechnical engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(5):865–872.(in Chinese))
|
[6] |
郑 静,曾辉辉,朱本珍. 腐蚀对锚索力学性能影响的试验研究[J]. 岩石力学与工程学报,2010,29(12):2 469–2 474.(ZHENG Jing,ZENG Huihui,ZHU Benzhen. Test study of influence of erosion on mechanical behavior of anchor[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(12):2 469–2 474.(in Chinese))
|
[8] |
FEDDERSEN I. Improvement of the overall stability of a gravity dam with 4500 kN-anchors[C]// Symp. on Ground Anchorages and Anchored Structures. London:Themas Telford,1997:318–325.
|
[12] |
高大水,吴海斌,王 莉. 三峡船闸高边坡预应力锚索耐久性研究[J]. 岩土力学,2005,26(增2):126–130.(GAO Dashui,WU Haibing,WANG Li. Research on endurance of prestressed anchorage cables in TGP shiplock′s high slop[J]. Rock and Soil Mechanics,2005,26(Supp.2):126–130.(in Chinese))
|
[16] |
中华人民共和国国家标准编写组. GB 50287—2006水力发电工程地质勘察规范[S]. 北京:中国计划出版社,2008.(The National Standards Compilation Group of the People′s Republic of China. GB 50287—2006 Strand for prestressed concrete[S]. Beijing:China Planning Press,2008.(in Chinese))
|
[18] |
王晓哲,亢景付,随春娥. 基于锚索监测数据的环锚无黏结预应力混凝土衬砌结构可靠性分析[J]. 水力发电学报,2015,34(2):144–148.(WANG Xiaozhe,KANG Jingfu,SUI Chune. Reliability analysis of the tunnel liner pre-stressed with circumferential un-bonded tendons based on the monitoring data[J]. Journal of Hydroelectric Engineering,2015,34(2):144–148.(in Chinese))
|
[22] |
李 剑. 预应力锚索失效因素的试验和数值研究[硕士学位论文][D]. 重庆:重庆大学,2007.(LI Jian. Experimental research and numerical simulation on failure factor of prestressed cable[M. S. Theis][D]. Chongqing:Chongqing University,2007.(in Chinese))
|
[26] |
李富民,袁迎曙,杜健民,等. 氯盐腐蚀钢绞线的受拉性能退化特征[J]. 东南大学学报:自然科学版,2009,39(2):340–344.(LI Fumin,YUAN Yingshu,DU Jianmin,et al. Deterioration of tensile behavior of steel stands corroded by chloride[J]. Journal of Southeast University:Natural Science,2009,39(2):340–344.(in Chinese))
|
[28] |
范 进. 高温后预应力钢绞线性能的试验研究[J]. 南京理工大学学报:自然科学版,2004,28(2):186–189.(FAN Jin. Experimental study on material properties of prestressed steel strand post high temperatures[J]. Journal of Nanjing University of Science and Technology:Natural Science,2004,28(2):186–189.(in Chinese))
|
[32] |
蔡连重,刘恩清. 核电用508–III钢气割热影响区组织及对性能影响的试验研究[J]. 一重技术,1998,(3):66–69.(CAI Lianchong,LIU Enqing. Experimental research on the microstructure and performance of 508–III steel for nuclear power in heat-affected zone[J]. Cfhi Technology,1998,(3):66–69.(in Chinese))
|
[36] |
郭 成,董 伟,臧顺来,等. 弹性模量与塑性变形变化规律试验研究[J]. 锻压技术,2008,33(2):116–119.(GUO Cheng,DONG Wei,ZANG Shunlai,et al. Experimental study on variation law of Young’s modulus and plastic deformation[J]. Forging and Stamping Technology,2008,33(2):116–119.(in Chinese))
|
[38] |
中华人民共和国行业标准编写组. CECS 22—2005岩土锚杆(索)技术规程[S]. 北京:中国标准出版社,2005.(The Professional Standards Compilation Group of the People?s Republic of China. CECS 22—2005 Technical specification for geotechnical anchor (cable)[S]. Beijing:Standards Press of China,2005.(in Chinese))
|
[4] |
曾宪明,雷志梁,张文巾,等. 关于锚杆“定时炸弹”问题的讨 论——答郭映忠教授[J]. 岩石力学与工程学报,2002,21(1):143–147.(ZENG Xianming,LEI Zhiliang,ZHANG Wenjin,et al. Discussion about “Time Bomb” question for bolt—an answer to professor GUO Yingzhong[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(1):143–147.(in Chinese))
|
[7] |
李英勇,张顶立,张宏博,等. 边坡加固中预应力锚索失效机制与失效效应研究[J]. 岩土力学,2010,31(1):144–150.(LI Yingyong,ZHANG Dingli,ZHANG Hongbo,et al. Research on failure mechanism and effects of prestressed anchor cables for reinforcing slopes[J]. Rock and Soil Mechanics,2010,31(1):144–150.(in Chinese))
|
[9] |
范卫琴. 锚索预应力损失规律的数值模拟[硕士学位论文][D]. 武汉:武汉理工大学,2007.(FAN Weiqin. Numerical simulation study on prestress loss of cable-bolt[M. S. Thesis][D]. Wuhan:Wuhan University of Technology,2007.(in Chinese))
|
[11] |
李英勇,张思峰,王松根,等. 预应力锚固结构腐蚀介质作用下的耐久性试验研究[J]. 岩石力学与工程学报,2008,27(8):1 626– 1 633.(LI Yingyong,ZHANG Sifeng,WANG Songgen,et al. Experimental research on durability of prestressed anchorage structure subjected to corrosion medium[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(8):1 626–1 633.(in Chinese))
|
[14] |
WANG Y,REN A,WANG Y,et al. Investigations on corrosion and mechanical properties of a 20 year old ground anchor exhumed at a power station site[J]. Canadian Geotechnical Journal,2015,53(4):589–602.
|
[21] |
曾宪明,陈肇元,王靖涛,等. 锚固类结构安全性与耐久性问题探讨[J]. 岩石力学与工程学报,2004,23(13):2 235–2 242.(ZENG Xianming,CHEN Zhaoyuan,WANG Jingtao,et al. Research on safety and durability of bolt and cable-supported structures[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(13):2 235–2 242.(in Chinese))
|
[24] |
中华人民共和国国家标准编写组. GB/T 699—1999优质碳素结构钢[S]. 北京:中国标准出版社,1999.(The National Standards Compilation Group of People′s Republic of China. GB/T699—1999 Quality carbon structural steels[S]. Beijing:Standards Press of China,1999.(in Chinese))
|
[31] |
刘水成. 焊接试板采用气割法取样对试验结果的影响分析[J]. 科技视界,2014,(23):116–117.(LIU Shuicheng. Impact analysis of sampling on welding test plate by gas cutting method[J]. Science and Technology Vision,2014,(23):116–117.(in Chinese))
|
[34] |
YOSHIDA F,UEMORI T,FUJIWARA K. Elastic-plastic behavior of steel sheets under in-plane cyclic tension-compression at large strain[J]. International Journal of Plasticity,2002,18(5/6):633–659.
|
[35] |
李雪春,杨玉英,包 军,等. 弹性模量与塑性变形关系的探讨[J]. 哈尔滨工业大学学报,2000,32(5):54–56.(LI Xuechun,YANG Yuying,BAO Jun,et al. Relationship between elastic modulus and plastic deformation[J]. Journal of Harbin Institute of Technology,2000,32(5):54–56.(in Chinese))
|
[37] |
于浩楠. 预应力锚索伸长量计算方法研究[硕士学位论文][D]. 重庆:重庆交通大学,2014.(Yu Haonan. Research on calculation method of elongation for pre-stress anchor[M. S. Thesis][D]. Chongqing:Chongqing Jiaotong University,2014.(in Chinese))
|