[1] |
刘招伟,王明胜,方俊波.高地应力大变形隧道支护系统的试验研究[J].土木工程学报,2010,43(5):111-116.(LIU Zhaowei,WANGMingsheng,FANGJunbo. In-situ study of reinforcement systems for tunnels under high geo-stress and large deformation[J].ChinaCivilEngineeringJournal,2010,43(5):111-116.(in Chinese))
|
[2] |
郭啟良,伍法权,钱卫平,等.乌鞘岭长大深埋隧道围岩变形与地应力关系的研究[J].岩石力学与工程学报,2006,25(11):2 194-2199. (GUO Qiliang,WU Faquan,QIAN Weiping,et al.Study on relationship between deformation of surrounding rock and in-situ stress in Wushaoling deep-buried railway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2 194-2199.(in Chinese))
|
[3] |
雷 军,张金柱,林传年.乌鞘岭特长隧道复杂地质条件下断层带应力及变形现场监测分析[J].岩土力学,2008,29(5):1367-1371. (LEIJun,ZHANG Jinzhu,LIN Chuannian.Analysis of stress and deformation site-monitoring in fault zone of Wushaoling tunnel under complex geological conditions[J]. Rock and Mechanics,2008,29(5):1367-1371.(in Chinese))
|
[4] |
万飞,谭忠盛,马 栋.关角隧道F2-1断层破碎带支护结构优化设计[J].岩石力学与工程学报,2014,33(3):531-537.(WANFei,TAN Zhongsheng,MA Dong. Optimizing design of support structure for guanjiao tunnel in fault-rupture zone F2-1[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):531-537.(in Chinese))
|
[5] |
张志强,关宝树. 软弱围岩隧道在高地应力条件下的变形规律研究[J]. 岩土工程学报,2000,22(6):696-700.(ZHANGZhiqiang,GUANBaoshu. Research on the deformation rule of weak rock mass tunnel under high initial geostress[J]. Chinese Journal of GeotechnicalEngineering,2000,22(6):696-700.(in Chinese))
|
[6] |
叶圣教.辛普伦铁路隧道的施工和回顾[C] //铁路工程建设科技动态报告文集——铁路隧道及地下工程.成都:西南交通大学出版社,1995:120-134.(YE Shengjiao.Review of Simplon Railway Tunnel Construction[C]// Scientific and Technological Dynamic Report on Railway Engineering Construction. Chengdu:Southwest Jiaotong University Press,1995:120-134.(in Chinese))
|
[7] |
GOEL R K,JETHWA J L,PAITHANKAR A G.Tunnelling through the young himalayas-a case history of the maneri-uttarkashi power tunnel[J].Engineering Geology,1995,39(5):31-34.
|
[8] |
MICHELSON A A.The laws of elastico-viscous flow[J].The Journal of Geology,1917,25(5):319-323.
|
[9] |
GRIGGS D.Creep of rocks[J].The Journal of Geology,1939,47(3):225-251.
|
[10] |
熊谷直一,笹嶋貞雄,伊藤英文.岩石の長年クリープ実験(巨大試片約20年間?小試片約3年間の結果)[J].材料,1978,27(293):155-161.
|
[11] |
陈宗基.地下巷道长期稳定性的力学问题[J].岩石力学与工程学报,1982,1(1):1-20.(TAN Tjongkie.The mechanical problems for the long-term stability of underground galleries[J]. Chinese Journal of Rock Mechanics and Engineering,1982,1(1):1-20.(in Chinese))
|
[12] |
郭 志.临界等速流变剪应力的确定方法[J].勘察科学技术,1994,12(4):24-26.(GUO Zhi.Method of determination of the critical uniform rheological shear stress[J].Site Investigation Science and Technology,1994,12(4):24-26.(in Chinese))
|
[13] |
陈有亮,孙 钧. 岩石的流变断裂特性[J]. 岩石力学与工程学报,1996,15(4):323-327.(CHEN Youliang,SUN Jun. Creep fracture of rock[J]. Chinese Journal of Rock Mechanics and Engineering,1996,15(4):323-327.(in Chinese))
|
[14] |
陈有亮,孙 钧. 岩石的蠕变断裂特性分析[J].同济大学学报,1996,24(5):504-508.(CHEN Youliang,SUN Jun. Characters of Rheological Fracture of Rock[J]. Journal of Tongji University,1996,24(5):504-508.(in Chinese))
|
[15] |
丁秀丽,刘 建,刘雄贞. 三峡船闸区硬性结构面蠕变特性试验研究[J]. 长江科学院院报,2000,17(4):30-33.(DING Xiuli,LIU Jian,LIU Xiongzhen. Experimental Study on creep behaviors of hard structural plane in TGP¢s permanent lock regions[J]. Journal of Yangtze River Scientific Research Institute,2000,17(4):30-33.(in Chinese))
|
[16] |
郑颖人,朱合华,方正昌,等.地下工程围岩稳定分析与设计理论[M].北京:人民交通出版社,2012:367-372.(ZHENG Yingren,ZHU Hehua,FANG Zhengchang,et al.The stability analysis and design theory of surrounding rock of underground engineering[M].Beijing:China Communications Press,2012:367-372.(in Chinese))
|
[17] |
谷兆祺,彭守拙,李仲奎.地下洞室工程[M].北京:清华大学出版社,1994:16-18.(GU Zhaoqi,PENG Shouzhuo,LI Zhongkui.Underground excavation engineering[M].Beijing:Tsinghua UniversityPress,1994:16-18.(in Chinese))
|
[18] |
M. 鲍莱茨基,M.胡戴克.矿山岩体力学[M]. 于振海,刘天泉,译.北京:煤炭工业出版社,1985:29-38.(BORECKI M,CHUDEK M.Mechanika Gorotworu[M].Translated by YU Zhenhai,LIU Tianquan. Beijing:China Coal Industry Publishing House,1985:29-38.(in Chinese))
|
[19] |
中华人民共和国行业标准编写组. JTG/TD70—2010公路隧道设计细则[S]. 北京:人民交通出版社,2010.(The Professional Standards compilation of the people¢s republic of china. jtg/t d70—2010 guidelines for design of highway tunnel[S].Beijing:China Communications Press,2010.(in Chinese))
|
[20] |
中华人民共和国行业标准编写组. TB 10003—2005 铁路隧道设计规范[S]. 北京:中国铁道出版社,2005.(The Professional Standards Compilationof the People′s Republic of China.TB 10003—2005 Code for design on tunnel of railway[M].Beijing:China Railway Publishing House,2005.(in Chinese))
|
[21] |
张传庆,冯夏庭,周 辉,等.隧洞围岩收敛损失位移的求取方法及应用[J].岩土力学,2009,30(4):997-1 012.(ZHANGChuanqing,FENG Xiating,ZHOU Hui,et al.Method of obtaining loss convergence displacement and its application to tunnel engineering[J]. Rock andSoil Mechanics,2009,30(4):997-1 012.(in Chinese))
|
[22] |
张 研,苏国韶,燕柳斌.隧洞围岩损失位移估计的智能优化反分析[J].岩土力学,2013,34(5):1384-1 390.(ZHANG Yan,SU Guoshao,YAN Liubin.An intelligent optimization method of back analysis for loss displacement of surrounding rocks of tunnel[J]. Rock andSoil Mechanics,2013,34(5):1384-1 390.(in Chinese))
|
[23] |
HOEK E. Big tunnels in bad rock[J]. Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2001,129(9):726-740.
|
[24] |
AYDANÖ,AKAGI T,KAWAMOTO T. The squeezing potential of rock around tunnels:theory and prediction with examples taken from Japan[J]. Rock Mechanics and Rock Engineering,1996,29(3):125-143.
|