[1] 钟冬望,吴 亮,陈 浩. 爆炸荷载下岩质边坡动力特性试验及数值分析研究[J]. 岩石力学与工程学报,2010,29(增 1):2 964–2 971. (ZHONG Dongwang,WU Liang,CHEN Hao. Model test and numerical simulation study of dynamic characteristics of rock slope under blasting load[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(Supp.1):2 964–2 971.(in Chinese))
[2] 陈 明,卢文波,吴 亮,等. 小湾水电站岩石高边坡爆破振动速度安全阈值研究[J]. 岩石力学与工程学报,2007,26(1):51–56. (CHEN Ming,LU Wenbo,WU Liang,et al. Safety threshold of blasting vibration velocity to high rock slope of Xiaowan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(1):51–56.(in Chinese))
[3] 祁生文,伍法权. 边坡动力响应规律研究[J]. 中国科学:E辑,2003,33(增):28–40.(QI Shengwen,WU Faquan. Research of rock slope dynamic response[J]. Science in China:Technological Science,2003,33(Supp.):28–40.(in Chinese))
[4] 董金玉,杨国香,伍法权,等. 地震作用下顺层岩质边坡动力响应和破坏模式大型振动台模型试验研究[J]. 岩土力学,2011,32(10):2 977–2 983.(DONG Jinyu,YANG Guoxiang,WU Faquan,et al. The large-scale shaking table test study of dynamic response and failure mode of bedding rock slope under earthquake[J]. Rock and Soil Mechanics,2011,32(10):2 977–2 983.(in Chinese))
[5] 刘亚群,李海波,李俊如,等. 爆破荷载作用下黄麦岭磷矿岩质边坡动态响应的UDEC模拟研究[J]. 岩石力学与工程学报,2004,23(11):42–45.(LIU Yaqun,LI Haibo,LI Junru,et al. UDEC simulation on dynamic response of rock slope of Huangmailing Phosphorite Mine under explosion[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(11):42–45.(in Chinese))
[6] LING H I,CHENG A H D. Rock sliding induced by seismic force[J]. International Journal of Rock Mechanics and Mining Sciences,1997,34(6):1 021–1 029.
[7] 胡益华,李 宁,韩 信. 小湾饮水沟堆积体边坡爆破动力稳定分析[J]. 岩石力学与工程学报,2005,24(增2):5 932–5 937.(HU Yihua,LI Ning,HAN Xin. Dynamic stability analysis of accumulation body slope of Xiaowan hydropower station under blasting condition[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp.2):5 932–5 937.(in Chinese))
[8] 胡英国,卢文波,陈 明. 不同开挖方式下岩石高边坡损伤演化过程比较[J]. 岩石力学与工程学报,2013,32(6):1 176–1 184.(HU Yingguo,LU Wenbo,CHEN Ming. Comparison of damage evolution process of high rock slope excavated by different methods[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(6):1 176– 1 184.(in Chinese))
[9] 闫长斌. 爆破作用下岩体累积损伤效应及其稳定性研究[博士学位论文][D].长沙:中南大学,2006.(YAN Changbin. Study on cumulative damage effects and stability of rock mass under blasting loading[Ph. D. Thesis][D]. Changsha:Central South University,2006.(in Chinese))
[10] 闫长斌,徐国元,杨 飞. 爆破动荷载作用下围岩累积损伤效应声波测试研究[J]. 岩土工程学报,2007,29(1):88–93.(YAN Changbin,XU Guoyuan,YANG Fei. Measurement of sound waves to study cumulative damage effect on surrounding rock under blasting load[J]. Chinese Journal of Geotechnical Engineering,2007,29(1):88–93.(in Chinese))
[11] MEGLIS I L,CHOW T M,MARTIN C D. Assessing in situ micro- crack damage using ultrasonic velocity tomography[J]. International Journal of Rock Mechanics and Mining Sciences,2005,42(1):25–34.
[12] 胡英国,卢文波,金旭浩,等. 岩石高边坡开挖爆破动力损伤的数值仿真[J]. 岩石力学与工程学报,2012,31(11):2 204–2 213.(HU Yingguo,LU Wenbo,JIN Xuhao,et al. Numerical simulation for excavation blasting dynamic damage of rock high slope[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(11):2 204–2 213.(in Chinese))
[13] Kuszmaul J S. A new constitutive model for fragmentation of rock under dynamic loading[C]// Proceedings of Second International Symposium on Rock Fragmentation by Blasting. Colorado:[s.n.],1987:412–423.
[14] TAYLOR L M,CHEN E P,KUSZMAUL J S. Micro-crack induced damage accumulation in brittle rock under dynamic loading[J]. Computer Methods in Applied Mechanics and Engineering,1986,55:301–320.
[15] 中华人民共和国行业标准编写组. SL47—94水工建筑物岩石基础开挖工程施工技术规范[S]. 北京:中华人民共和国水利部,1994.(The Professional Standards Compilation Group of People¢s Republic of China. SL47—94 Construction technical specification on rock foundation excavation engineering of hydraulic structures[S]. Beijing:The Ministry of Water Resources of the People¢s Republic of China,1994.(in Chinese))
[16] 张培文,陈祖煜. 弹性模量和泊松比对边坡稳定安全系数的影响[J].岩土力学,2006,27(2):299–303.(ZHANG Peiwen,CHEN Zuyu. Influences of soil elastic modulus and Poisson¢s ratio on slope stability[J]. Rock and Soil Mechanics,2006,27(2):299–303.(in Chinese))
[17] 何思明,王全才. 人工高切坡的长期强度指标研究[J]. 四川大学学报:工程科学版,2005,37(6):26–37.(HE Siming,WANG Quancai. Study on long term strength index of high cut slop[J]. Journal of Sichuan University:Engineering Science Edition,2005,37(6):26–37.(in Chinese))
[18] 赵尚毅,郑颖人,时卫民,等. 用有限元强度折减法求边坡稳定安全系数[J]. 岩土工程学报,2002,24(3):343–346.(ZHAO Shangyi,ZHENG Yingren,SHI Weimin,et al. Analysis of safety factor of slope by strength reduction FEM[J]. Chinese Journal of Geotechnical Engineering,2002,24(3):343–346.(in Chinese))
[19] 刘金龙,栾茂田,赵少飞,等. 关于强度折减有限元方法中边坡失稳判据的讨论[J].岩土力学,2005,26(8):1 345–1 348.(LIU Jinlong,LUAN Maotian,ZHAO Shaofei,et al. Discussion on criteria for evaluating stability of slope in elastoplastic FEM based on shear strength reduction technique[J]. Rock and Soil Mechanics,2005,26(8):1 345–1 348.(in Chinese))
[20] 郑颖人,赵尚毅. 有限元强度折减法在土坡与岩坡中的应用[J]. 岩石力学与工程学报,2004,23(19):3 381–3 388.(ZHENG Yingren,ZHAO Shangyi. Application of strength reduction FEM to soil and rock slope[J]. Chinese Journal of Rock Mechanics and Engineering, 2004,23(19):3 381–3 388.(in Chinese))
[21] 许名标,彭德红. 某水电站边坡开挖爆破震动动力响应有限元分析[J]. 岩土工程学报,2006,28(6):770–775.(XU Mingbiao,PENG Dehong. Finite element analysis of dynamic response on blasting vibration in slope excavation of a hydroelectric power station[J]. Chinese Journal of Geotechnical Engineering,2006,28(6):770–775. (in Chinese))