[1] |
中华人民共和国国家标准编写组. GB 50025—2004湿陷性黄土地区建筑规范[S]. 北京:中国建筑工业出版社,2004.(The National Standards Compilation Group of People¢s Republic of China. GB 50025—2004 code for building construction in collapsible loess regions[S]. Beijing:China Architecture and Building Press,2004.(in Chinese))
|
[2] |
LEEC F,ZHANG JM,ZHANG YX.Evolution and origin of the ground fissures in Xi¢an,China[J]. Engineering Geology,1996,43(1):45-55.
|
[3] |
PENGJ B,CHEN L W,HUANG Q B,etal.Physical simulation of ground fissures triggered by underground fault activity[J]. Engineering Geology,2013,155(14):19-30.
|
[4] |
彭建兵. 西安地裂缝灾害[M]. 北京:科学出版社,2012:313-407.(PENG Jianbing. Disaster of ground fissure in Xi¢an[M]. Beijing:Science Press,2012:313-407.(in Chinese))
|
[5] |
李凯玲,门玉明,严静平,等.地铁隧道正交穿越地裂缝的相互作用机制试验研究[J]. 岩石力学与工程学报,2011,30(3):556-563. (LI Kailing,MEN Yuming,YAN Jingping,et al.Test study of interaction mechanism under metro tunnelorthogonally crossing ground fissure[J]. Chinese Journal ofRock Mechanics and Engineering,2011,30(3):556-563.(in Chinese))
|
[6] |
黄强兵,彭建兵,王启耀,等.地铁隧道穿越地裂缝带的结构抗裂预留位移量[J]. 岩石力学与工程学报,2010,29(增1):2 669-2 675.(HUANG Qiangbing,PENG Jianbing,WANG Qiyao,et al. Reserved displacements for anti-crack design ofmetro tunnel passing through active groundfissure zones[J].Chinese Journal ofRock Mechanics and Engineering,2010,29(Supp.1):2 669-2 675.(in Chinese))
|
[7] |
赵东平,喻 渝,王明年,等. 大断面黄土隧道变形规律及预留变形量研究[J]. 现代隧道技术,2009,46(6):64-69.(ZHAO Dongping,YU Yu,WANG Mingnian,et al. Study on the deformation regularity and preset deformations for large section tunnels in loess[J]. Modern Tunneling Technology,2009,46(6):64-69.(in Chinese))
|
[8] |
王启耀,彭建兵,黄强兵. 西安地铁二号线地裂缝段防水设计探讨[J]. 现代隧道技术,2009,46(1):71-75.(WANG Qiyao,PENG Jianbing,HUANG Qiangbing. Study on waterproofing of Xi¢an metro line 2 on the section with ground fissures[J]. Modern Tunneling Technology,2009,46(1):71-75.(in Chinese))
|
[9] |
黄强兵,彭建兵,范 文,等. 西安地铁二号线沿线地裂缝未来位错量估算及工程分级[J]. 工程地质学报,2007,15(4):469-474. (HUANG Qiangbing,PENG Jianbing,FAN Wen,etal. Estimation of the maximum displacement ofground fissures along Xi¢an metro line 2 and its engineering classification[J]. Journal of Engineering Geology,2007,15(4):469-474.(in Chinese))
|
[10] |
范 文,熊 炜,彭建兵,等. 分段式地铁隧道穿越地裂缝带的模型试验研究[J]. 岩土工程学报,2010,32(1):138-143.(FAN Wen,XIONG Wei,PENG Jianbing,et al.Model tests on segmental subway tunnel crossing ground fissure belt[J]. Chinese Journal ofGeotechnical Engineering,2010,32(1):138-143.(in Chinese))
|
[11] |
熊田芳,邵生俊,王天明,等. 西安地铁正交地裂缝隧道的模型试验研究[J]. 岩土力学,2010,31(1):179-186.(XIONG Tianfang,SHAO Shengjun,WANG Tianming,et al. Research on physicalmodel experiment of Xi¢an metro tunnel orthogonally crossing groundfissure[J]. Rock and Soil Mechanics,2010,31(1):179-186.(in Chinese))
|
[12] |
胡志平,彭建兵,王启耀,等. 盾构隧道60°斜穿地裂缝的变形破坏机制试验研究[J]. 岩石力学与工程学报,2010,29(1):176-183.(HU Zhiping,PENG Jianbing,WANG Qiyao,et al.Modeling test research on failure mechanism of shield tunnel crossing ground fissure with 60°[J]. Chinese Journal ofRock Mechanics and Engineering, 2010,29(1):176-183.(in Chinese))
|
[13] |
李建军,邵生俊,熊田芳. 隧道斜交穿越地裂缝的模型试验研究[J]. 岩土力学,2010,31(增1):115-120,126.(LI Jianjun,SHAO Shengjun,XIONG Tianfang. Research on physical model experiment of tunnel obliquelycrossing a ground fissure[J].Rock and Soil Mechanics,2010,31(Supp.1):115-120,126.(in Chinese))
|
[14] |
黄强兵,彭建兵,高虎艳,等. 地铁隧道斜交穿越地裂缝带的纵向设防长度[J]. 铁道学报,2010,32(1):73-78.(HUANG Qiangbing,PENG Jianbing,GAO Huyan,et al.The longitudinal fortified length of metro tunnel obliquely crossing the active ground fissure zones[J]. Journal of the China Railway Society,2010,32(1):73-78.(in Chinese))
|
[15] |
李新生,王朋朋,李亚圣,等. 西安地铁穿越地裂缝的抽水试验研究[J]. 地球科学与环境学报,2010,(4):378-385.(LI Xinsheng,WANG Pengpeng,LI Yasheng,et al. Study on pumping test for Xi¢an metro crossing ground fracture[J]. Chinese Journalof Earth Sciences and Environment,2010,(4):378-385.(in Chinese))
|
[16] |
长安大学. 地铁隧道近距离平行和小角度穿越活动地裂缝带的性状及防治措施研究报告[R]. 西安:长安大学,2011:17-24. (Chang¢an University. Research report of the interaction between metro tunnel and ground fissure under the condition of tunnel crossing with small angle and paralleling with short distance to ground fissure control measures[R]. Xi¢an:Chang¢an University,2011:17-24.(in Chinese))
|
[17] |
蒋臻蔚,彭建兵,王启耀. 西安市地铁3号线不良地质问题及对策研究[J]. 岩土力学,2010,31(增2):317-321.(JIANG Zhengwei,PENG Jianbing,WANG Qiyao.Adverse geological problems and countermeasure of Xi¢an metro line 3[J]. Rock and Soil Mechanics,2010,31(Supp.2):317-321.(in Chinese))
|
[18] |
BUCKINGHAME.On physically similar systems:Illustrations of the use of dimensional equations[J]. Physical Review,1914,4(4):345-376.
|
[19] |
中华人民共和国行业标准编写组. 城市桥梁、隧道安全保护区域技术标准[S].上海:[s. n.],2010.(The Professional Standards Compilation Group of People¢s Republic of China.Technical code for protection region of urban bridge and tunnels[S]. Shanghai:[s. n.],2010.(in Chinese))
|
[20] |
中华人民共和国行业标准编写组. DBJ61-6—2006西安地裂缝场地勘察与工程设计规程[S]. 西安:陕西省建筑标准设计办公室,2006.(The Professional Standards Compilation Group of People¢s Republic of China. DBJ61-6—2006Specification for site investigation and engineering on Xi¢an ground fractures[S]. Xi¢an:The Office of Building Standard and Design of Shaanxi Province,2006.(in Chinese))
|