|
[1] 王梦恕. 北京地铁浅埋暗挖法施工[J]. 岩石力学与工程学报,1989,8(1):52–61.(WANG Mengshu. Shallow covered undercutting construction for metros in Beijing[J]. Chinese Journal of Rock. Mechanics and Engineering,1989,8(1):52–61.(in Chinese))
[2] 周 诚,周少东,林 涛,等. 城市地铁隧道区间浅埋暗挖施工地表沉降控制研究[J]. 施工技术,2011,40(19):70–74.(ZHOU Cheng,ZHOU Shaodong,LIN Tao,et al. Ground subsidence control techniques for subway tunnels[J]. Construction Technology,2011,40(19):70–74.(in Chinese))
[3] 孔 恒. 城市地铁隧道浅埋暗挖法地层预加固机理及其应用研究[博士学位论文][D],北京:北京交通大学,2003.(KONG Heng,Mechanism and application of reinforcement and pre-support for shallow covered undercutting of subway tunnels[Ph. D. Thesis][D]. Beijing:Beijing Jiaotong University,2003.(in Chinese))
[4] 吉小明,石明霞. 浅埋暗挖隧道围岩预加固机理及稳定性分析[J]. 现代隧道技术,2008,(增1):238–243.(JI Xiaoming,SHI Mingxia. Mechanism and stability of reinforcement and pre-support for shallow covered undercutting of tunnels[J]. Modern Tunnelling Technology,2008,(Supp.1):238–243.(in Chinese))
[5] SAGASETA C. Analysis of undrained soil deformation due to ground loss[J]. Geotechnique,1987,37(3):301–320.
[6] LEE K M.,ROWE R K,LO K Y. Subsidence owing to tunneling. I. estimating the gap parameter[J]. Canadian Geotechnical Journal,1992,29(6):929–940.
[7] LOGANATHAN N,POULOS H G. Analytical prediction for tunneling induced ground movement in clays[J]. Journal of Geotechnical and Geoenvironmental Engineering,1998,124(9):846–856.
[8] ADDENBROOK T I,POTTS D M. Twin tunnel interaction:surface and subsurface effects[J]. International Journal of Geomechanics,2001,1(2):249–271.
[9] NG C W W,LEE K M,TANG D K W. Three-dimensional numerical investigations of new Austrian tunneling method(NATM) twin tunnel interactions[J]. Canadian Geotechnical Journal,2004,41(3):523–539.
[10] YAMAMOTO K,LYAMIN A V,WILSON D V,et al. Stability of dual circular tunnels in cohesive-frictional soil subjected to surcharge loading[J]. Computers and Geotechnics,2004,38(4):41–54.
[11] 黄宏伟,张冬梅. 盾构施工引起的地表沉降及现场监控[J]. 岩石力学与工程学报,2001,20(增1):1 814–1 820.(HUANG Hongwei, ZHANG Dongmei. Ground subsidence caused by shield tunneling and monitoring[J]. Chinese Journal of Rock. Mechanics and Engineering,2001,20(Supp.1):1 814–1 820.(in Chinese))
[12] 张 云,尹宗泽,徐永福. 盾构法隧道引起的地表变形分析[J]. 岩石力学与工程学报,2002,21(3):388–392.(ZHANG Yun,YIN Zongze,XU Yongfu. Analysis of ground subsidence induced by shield tunneling[J]. Chinese Journal of Rock. Mechanics and Engineering,2002,21(3):388–392.(in Chinese))
[13] 黄润秋,戚国庆. 地铁隧道盾构工对环境的影响研究[J]. 岩石力学与工程学报,2003,22(增1):2 464–2 486.(HUANG Runqiu,QI Guoqing. Influences on environment of shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(Supp.1):2 464–2 486.(in Chinese))
[14] 魏 刚,张世民,齐静静,等. 盾构隧道施工引起的地面变形计算方法研究[J]. 岩石力学与工程学报,2006,25(增1):3 317–3 323. (WEI Gang,ZHANG Shimin,QI Jingjing,et al. Study of calculation method of ground deformation induced by shield tunnel construction[J]. Chinese Journal of Rock. Mechanics and Engineering,2006,25(Supp.1):3 317–3 323.(in Chinese))
[15] 乔世范,殷建华,刘宝琛. 圆形断面隧道开挖引起的地表及岩土体的位移和变形计算研究[J]. 岩石力学与工程学报,2008,27(增2):3 611–3 616.(QIAO Shifan,YIN Jianhua,LIU Baochen. Deformation computations and analysis of ground subsidence by exaction of circular cross-sectional tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.2):3 611–3 616.(in Chinese))
[16] 王 霆,刘维宁,张成满,等. 地铁车站浅埋暗挖法施工引起地表沉降规律研究[J]. 岩石力学与工程学报,2007,26(9),1 855–1 861. (WANG Ting,LIU Weining,ZHANG Chengman et al. Study on ground settlement induced by shallow metro station constructions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(9):1 855–1 861.(in Chinese))
[17] 晏启祥,何 川,姚 勇,等. 小净距隧道施工小导管注浆效果的数值模拟分析[J]. 岩土力学,2004,25(增2):239–242.(YAN Qixiang,HE Chuan,YAO Yong,et al. Numerical analysis for grouting effects used in tunnels with small pillar width[J]. Rock and Soil Mechanics,2004,25(Supp.2):239–242.(in Chinese))
[18] 何 川,苏宗贤,曾东洋. 地铁盾构隧道重叠下穿施工对上方已建隧道的影响[J]. 土木工程学报,2008,41(3):91–98.(HE Chuan,SU Zongxian,ZENG Dongyang. Influence of metro shield tunneling on existing tunnel directly above[J]. China Civil Engineering Journal,41(3):91–98.(in Chinese))
[19] 姚继安. 浅埋偏压隧道与邻近隧道开挖顺序分析[J]. 铁道勘测与设计,2006,(4):9–12.(YAO Ji¢an. Construction sequence analysis for shallow buried tunnel with biased pressure and twin tunnels[J]. Railway Survey and Design,2006,(4):9–12.(in Chinese))
[20] 王国波,徐海清,王艳丽. “群洞效应”对紧邻交叠盾构隧道场地土地震响应的初步分析[J]. 岩土工程学报,2013,35(5):968–973. (WANG Guobo,XU Haiqing,WANG Yanli. Effects of grouped tunnels and their influences on site seismic analysis with twin tunnels[J]. Chinese Journal of Geotechnical Engineering,2013,35(5):968–973.(in Chinese))
[21] 杨小礼,眭志荣. 浅埋小净距偏压隧道施工工序的数值分析[J]. 中南大学学报:自然科学版,2007,38(4):764–770.(YANG Xiaoli,GUI Zhirong. Construction sequence analysis for shallow buried biased-pressure twin tunnels[J]. Journal of Central South University:Science and Technology,2007,38(4):764–770.(in Chinese))
[22] LECA E,NEW B. Settlement induced by tunneling in soft ground[J]. Tunnelling and Underground Space Technology,2007,22(1):119–149.
[23] LECA E,LEBLAIS Y,KUHNHENN K. Underground works in soils and soft rock tunneling[C]// Proceedings of International Conference on Geotechnology of Geology Engineering. Melbourne,Australia. 2000:220–268.
[24] MUNFAKH G A. The ground improvement engineering- the state of the US practice:Part 1. methods,ground improvement[J]. Ground Engineering,1997,1(4):193–214.
[25] MUNFAKH G A. The ground improvement engineering- the state of the US practice:Part 2. applications,ground improvement [J]. Ground Engineering,1997,1(4):215–222.
[26] 龚晓南. 地基处理手册[M]. 3版. 北京:中国建筑工业出版社,2008:365–410.(GONG Xiaonan. Handbook for ground improvement[M]. 3rd ed. Beijing:China Building Press,2008:365–410.(in Chinese))
[27] BYLE M J,BORDEN R H. Verification of geotechnical grouting[M]. Reston:Geotechnical Special Publication,1995:1–77.
[28] WANG D Y,GAO Z R,LEE J L,et al. Assessment and optimization of soil mixing and umbrella vault applied to a cross-passage excavation in soft soils[J]. International Journal of Geomechanics,2013,DOI:0.1061/(ASCE)GM.1943–5622.0000374.
[29] American Concrete Institute. Building code requirements for structural concrete and commentary[S]. [S.l.]:American Concrete Institute,2003.
[30] BIENIAWSKI Z T. Design methodology in rock engineering[M]. London:CRC Press,1992:205.
[31] ZHANG L,EINSTEIN H H. Using RQD to estimate the deformation modulus of rock masses[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41:337–341.
[32] MITCHELL J K. The properties of cement-stabilized soils[C]// Proceedings of Residential Workshop on Materials and Methods For Low Cost Road,Rail,and Reclamation Works. Leura,Australia:Unisearch Ltd.,1976:365–404.
[33] BALMER G G. Shear strength and elastic properties of soil-cement mixtures under triaxial loading[C]// Proceedings of American Society for Testing Materials by Portland Cement Association,Research and Development Laboratories. [S. l.]:[s. n.],1958:1 187–1 204.
[34] YOO C. Finite-element analysis of tunnel face reinforced by longitudinal pipes[J]. Computers and Geotechnics,2002,29:73–94.
|