[1] 刘庭金. 基坑施工对盾构隧道变形影响的实测研究[J]. 岩石力学与工程学报,2008,27(增2):3 393–3 340.(LIU Tingjin. Study on shield tunnel deformation due to foundation pit construction[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27 (Supp.2):3 393–3 340.(in Chinese))
[2] 陈锦剑,王建华,杜 毅,等. 两侧深基坑开挖影响下浅埋运营隧道的位移特性[J]. 地下空间与工程学报,2011,7(6):1 163–1 167. (CHEN Jinjian,WANG Jianhua,DU Yi,et al. Movement of the shallow operating tunnel due to adjacent deep excavation on both sides[J]. Chinese Journal of Underground Space and Engineering,2011,7(6):1 163–1 167.(in Chinese))
[3] 高广运,高 盟,杨成斌,等. 基坑施工对运营地铁隧道的变形影响及控制研究[J]. 岩土工程学报,2010,32(3):453–458.(GAO Guangyun,GAO Meng,YANG Chengbin,et al. Influence of deep excavation on deformation of operating metro tunnels and counter- measures[J]. Chinese Journal of Geotechnical Engineering,2010,32(3):453–458.(in Chinese))
[4] 高广运,吴 勇,张先林,等. 深基坑开挖与邻近隧道相互影响的分析[J]. 土木工程学报,2011,44(增):114–117.(GAO Guangyun,WU Yong,ZHANG Xianlin,et al. Analysis of the interaction between deep excavation and adjacent existing tunnel[J]. China Civil Engineering Journal,2011,44(Supp.):114–117.(in Chinese))
[5] 谢兆耕,傅先华. 紧贴运营地铁隧道的深基坑施工技术[J]. 施工技术,2010,37(9):1–5.(XIE Zhaogeng,FU Xianhua. Construction technology of deep foundation pit adjacent to metro tunnel[J]. Construction Technology,2010,37(9):1–5.(in Chinese))
[6] 褚 峰,李永盛,梁发云,等. 土体小应变条件下紧邻地铁枢纽的超深基坑变形特性数值分析[J]. 岩石力学与工程学报,2010,29(增1):3 184–3 192.(CHU Feng,LI Yongsheng,LIANG Fayun,et al. Numerical analysis of deformation of deep excavation adjacent to metro considering small-strain stiffness of soil[J]. Chinese Journal
of Rock Mechanics and Engineering,2010,29(Supp.1):3 184–3 192.
[7] 刘国彬,黄院雄,侯学渊. 基坑工程下已运行地铁区间隧道上抬变形的控制研究与实践[J]. 岩石力学与工程学报,2001,20(3):202–207.(LIU Guobin,HUANG Yuanxiong,HOU Xueyuan. The prediction and control of rebound deformation of the existed tunnels right under excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2001,20(3):202–207.(in Chinese))
[8] 程 斌,刘国彬. 基坑工程施工对邻近建筑物及隧道的相互影响[J].工程力学,2000,(增):486–491.(CHENG Bin,LIU Guobin. The affection to the adjacent building and tunnel due to excavation[J]. Engineering Mechanics,2000,(Supp.):486–491.(in Chinese))
[9] 戚科骏,王旭东,蒋 刚,等. 临近地铁隧道的深基坑开挖分析[J]. 岩石力学与工程学报,2005,24(增2):5 485–5 488.(QI Kejun,WANG Xudong,JIANG Gang,et al. Analysis of deep pit excavation adjacent to tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(Suup.2):5 485–5 488.(in Chinese))
[10] 王卫东,吴江斌,翁其平. 基坑开挖卸载对地铁区间隧道影响的数值模拟[J]. 岩土力学 2004,25(增2):251–255.(WANG Weidong,WU Jiangbin,WENG Qiping.Numerical modeling of affection of foundation pit excavation unloading on metro tunnel[J]. Rock and Soil Mechanics,2004,25(Supp.2):251–255.(in Chinese))
[11] 丁铁华,丁海港,何国建,等. 双侧均邻地铁隧道的建筑深基坑工程施工技术[J]. 建筑施工,2008,30(7):511–514.(DING Tiehua,DING Haigang,HE Guojian,et al. Construction technology for building deep foundation pit adjacent to subway tunnel on both sides[J]. Building Construction,2008,30(7):511–514.(in Chinese))
|