Abstract The lock chamber was made of permanent steel plate pile and the prestressed anchor cable was adopted in structure. The structure was firstly applied to the shiplock engineering in China. Because the site soil is inhomogenous and the geologic conditions are complicated and highly changeable,the dispersed and compressed earth anchor cable was accepted in this project to meet the requirement of design load and construction quality. The measurement was made during the proceed of construction,and some successful experiences were obtained.