| DESIGN AND CONSTRUCTION OF MOUNTAIN TUNNEL WITH TURNKEY CONTRACT |
| Chang C S,Wang W T,Chen F S |
| (Department of Geotechnical Engineering,China Engineering Consultant Co., Taipei) |
|
|
|
|
Abstract In order to control construction period,budgets and quality and reduce interface problems,many projects have adopted the turnkey contact to distribute the construction work in Taiwan. In general,the responsibility of the project under the turnkey system falls on the construction companies. But the construction companies in Taiwan do not have sufficient design capabilities to perform the relevant tasks and thus they usually cooperate with design consultant firms. So the design consultant firms play important roles in coordinating with the construction parties. The case of turnkey system used in a tunnel in the mountainous region of central Taiwan is discussed.
|
|
|
|
|
|
|
1 李得璋. 公共工程實施統包制度之檢討與展望[J]. 土木水利,2002,29(3):99~101
2 張欽森,林仁壽,蕭俊志等. 由觀塘工業區開發計畫工業港、造地工程及液化天然氣接收站之統包探討工程介面問題[R]. 台北:台灣科技大學,2002
3
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|