[6] |
FIP. Corrosion and corrosion protection of prestressed ground anchorages[R]. London:Fédération Internationale de la Précontrainte,1986.
|
[16] |
WANG Y J,SUN X S,REN A W. Investigations of rock anchor corrosion and its influence factors by exhumations in four typical field sites[J]. Engineering Failure Analysis,2019,101:357-382.
|
[3] |
于 杰,黄朝军,杨宏伟,等. 丹江口大坝加高工程闸墩预应力加固[C]// 高坝建设与运行管理的技术进展——中国大坝协会2014学术年会论文集. 贵阳:中国大坝协会,2014:111-116.(YU Jie,HUANG Chaojun,YANG Hongwei,et al. Prestressed reinforcement of pier in Danjiangkou dam heightening project[C]// Technical Progress in Construction and Operation Management of High Dams— Proceedings of 2014 Academic Annual Meeting of China Dam Association. Guiyang:Chinese National Committee on Large Dams,2014:111-116.(in Chinese))
|
[5] |
CHEN F F,WU Y X. Application of non-adhesive pre-stressed anchor cables in the treatment of the crack of dam[J]. Advanced Materials Research,2013,(726/731):3 372-3 375.
|
[7] |
PINCHARD T,FARGES J L,BOUTET J M,et al. Spillway capacity upgrade at Malarce dam:construction of an additional piano key weir spillway[C]// Labyrinth and piano key weirs—PKW 2013. London:CRC Press,2014:243-252.
|
[10] |
曾宪明,陈肇元,王靖涛,等. 锚固类结构安全性与耐久性问题探讨[J]. 岩石力学与工程学报,2004,23(13):2 235-2 242.(ZENG Xianming,CHEN Zhaoyuan,WANG Jingtao,et al. Research on safety and durability of bolt and cable-supported structures[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(13):2 235-2 242. (in Chinese))
|
[15] |
WANG Y J,REN A W,WANG Y S,et al. Investigations on corrosion and mechanical properties of a 20 year old ground anchor exhumed at a power station site[J]. Canadian Geotechnical Journal,2015,53(4):589-602.
|
[17] |
中华人民共和国国家标准编写组. GB/T 699—1988优质碳素结构钢技术条件[S]. 北京:中国标准出版社,1988.(The National Standards Compilation Group of the People′s Republic of China. GB/T 699—1998 Quality carbon structure steel--technical requirements[S]. Beijing:Standards Press of China,1988.(in Chinese))
|
[8] |
FEDDERSEN I. Improvement of the overall stability of a gravity dam with 4500 kN anchors[C]// Ground Anchorages and Anchored Structures International Conference. London:Institution of Civil Engineers and Held,1997:318-325.
|
[18] |
中华人民共和国国家标准编写组. GB/T 699—2015优质碳素结构钢[S]. 北京:中国标准出版社,2015.(The National Standards Compilation Group of the People′s Republic of China. GB/T 699—2015 Quality carbon structural steels[S]. Beijing:Standards Press of China,2015.(in Chinese))
|
[20] |
中华人民共和国国家标准编写组. GB/T 5224—2014预应力混凝土用钢绞线[S].北京:中国计划出版社,2014.(The National Standards Compilation Group of the People′s Republic of China. GB/T 5224—2014 Strand for prestressed concrete[S]. Beijing:China Planning Press,2014.(in Chinese))
|
[4] |
赵恩灵. 潘家口大坝41#坝段加固预应力锚索施工[J]. 海河水利,1998,(4):3-5.(ZHAO Enling. Construction of the prestressed anchorage cables for strengthening #41 section of Panjiakou dam[J]. Haihe Water Resources,1998,(4):3-5.( in Chinese))
|
[14] |
任爱武,汪彦枢,王玉杰,等. 拉力集中全长黏结型锚索长期耐久性研究[J]. 岩石力学与工程学报,2011,30(3):493-499.(REN Aiwu,WANG Yanshu,WANG Yujie,et al. Research on durability of concentrated tension and full-bonded anchor cables[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(3):493-499.(in Chinese))
|
[1] |
刘志国,王立帮,孙云天. 预应力锚固技术在丰满大坝加固工程中的应用[J]. 水利水电技术,2000,(10):36-38.(LIU Zhiguo,WANG Libang,SUN Yuntian. Application of prestressed anchorage technology in Fengman dam reinforcement project[J]. Water Resources and Hydropower Engineering,2000,(10):36-38.( in Chinese))
|
[11] |
赵 健,冀文政,肖 玲,等. 锚杆耐久性现场试验研究[J]. 岩石力学与工程学报,2006,25(7):1 377-1 385.(ZHAO Jian,JI Wenzheng,XIAO Ling,et al. In-situ experimental study on anchor durability[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(7):1 377-1 385.(in Chinese))
|
[21] |
黎慧珊,王玉杰,孙兴松,等. 无黏结预应力锚索运行健康状况分析与评价[J]. 岩石力学与工程学报,2019,38(增1):2 913-2 924. (LI Huishan,WANG Yujie,SUN Xingsong,et al. Analysis and assessment of health status of unbonded prestressed anchors[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(Supp.1):2 913-2 924.( in Chinese))
|
[2] |
田裕甲,黄善和,郑影升. 大坝混凝土裂缝预应力锚索加固[C]// 中国锚固与注浆工程实录选. 北京:中国岩石力学与工程学会,1995:32-44.(TIAN Yujia,HUANG Shanhe,ZHENG Yingsheng. To reinforce concrete dam with cracks using prestressed anchor rope[C]// Selection of anchorage and grouting engineering in China. Beijing:Chinese Society for Rock Mechanics and Engineering,1995:32-44.(in Chinese))
|
[12] |
LITTLEJOHN S. Assessment of cement grout cover as sole protection of permanent tensioned steel tendons[C]// Ground Anchorages and Anchored Structures International Conference. London:Institution of Civil Engineers and Held,2007:357-367.
|
[22] |
谢学军,王 浩,邹品果,等. 铁-水体系电位-pH图与氧化性水工况的腐蚀控制[J]. 华北电力技术,2011,(5):23-25.(XIE Xuejun,WANG Hao,ZOU Pinguo,et al. Corrosion control of oxidative water condition and potential-pH chart of ferrum-water system[J]. North China Electric Power,2011,(5):23-25.(in Chinese))
|
[13] |
PAGE C L,TREADAWAY K W J. Aspects of the electrochemistry of steel in concrete[J]. Nature,1982,297(5862):109-115.
|
[9] |
XU H X,BENMOKRANE B. Strengthening of existing concrete dams using post-tensioned anchors:a state-of-the-art review[J]. Canadian Journal of Civil Engineering,1996,23(6):1 151-1 171.
|
[19] |
中华人民共和国国家标准编写组. GB/T 5224—1985预应力混凝土用钢绞线[S]. 北京:中国计划出版社,1985.(The National Standards Compilation Group of the People′s Republic of China. GB/T 5224—1985 Strand for prestressed concrete[S]. Beijing:China Planning Press,1985.(in Chinese))
|