(1. Beijing Urban Construction Exploration and Surveying Design Research Institute Co.,Ltd.,Beijing 100101,China;2. Beijing Urban Construction Group Co.,Ltd.,Beijing 100088,China;3. School of Civil and Environmental Engineering,University of Science and Technology Beijing,Beijing 100083,China;4. Institute of Geology and Geophysics,Chinese Academy of Sciences,
Beijing 100029,China)
Abstract:The building/structure settlement curve fits to the normal distribution. The Peck formula in tunnel engineering ground surface settlement prediction is derived,and its parameter meaning is changed to establish the building/structure settlement prediction formula. The single and two layer buildings load effect on the deformation are studied by the engineering cases summary and theoretical analysis. The building/structure settlements in different locations of tunnel engineering are studied by numerical simulation. With the existing parameter value of volume loss(Vl) and building/structure settlement prediction formula,the reference value of building/structure settlement trough width parameter(Ks) in different countries are calculated. The engineering practices show that the building/structure settlement prediction formula calculation result,numerical simulation result and monitoring result are in good agreement. The formula has very good practicality,and it could be applied to similar building/structure foundation settlement prediction.
张印涛,彭建宇. 地下开挖导致邻近建筑物的损害评价方法综述[J]. 城市建设,2010,(2):110-111.(ZHANG Yintao,PENG Jianyu. The evaluation method overview of buildings damage caused by underground excavation[J]. Urban Construction,2010,(2):110-111.(in Chinese))
Your browse does not support frame!