Abstract:Due to the complexity of shield tunnel construction,some segments will be damaged during construction and need to be repaired,and the repair quality will directly influence the safety and durability of shield tunnel. The damage characteristics of a shield tunnel were summarized after investigating the segment damage,the mechanical characteristics of repair part while occurring longitudinal deformation was analyzed,and the longitudinal equivalent stiffness model was adopted to analyze the relationship between the stress on the repair part and longitudinal deformation,so that the controlled repair strength was obtained. Furthermore,according to mechanical characteristics of repair part and damage features,laboratory test model was designed to get the reasonable repair material. The research provides guidance for repair of damaged shield tunnel segment.
MITSUTAKA S. Cause of segment damages during construction[C]//International Symposium on Underground Excavation and Tunneling.Bangkok,Thailand:[s.n.],2006:67-74.
[2]
殷波,童刚强.盾构管片破裂原因分析及改进措施[J].水利与建筑工程学报,2011,9(1):102-105.(YIN Bo,TONG Gangqiang. Analysis and improvement measures for segment cracks in shield interval[J].Journal of Water Resources and Architectural Engineering,2011,9(1):102-105.(in Chinese))
[3]
程学武,许维青,杨志永.大直径管片拼装及缺陷处理[J].中国工程科学,2010,12(12):89-93.(CHENG Xuewu,XU Weiqing,YANG Zhiyong. Assembling and defect treatment of large-diameter shield segment[J].Engineering Science,2010,12(12):89-93.(in Chinese))
[4]
廖少明,白廷辉,彭芳乐,等. 盾构隧道纵向沉降模式及其结构响应[J].地下空间与工程学报,2006,2(5):566-570.(LIAO Shaoming,BAI Tinghui,PENG Fangle,et al. Longitudinal settlement forms and structural response of shield tunnel[J].Chinese Journal of Underground Space and Engineering,2006,2(5):566-570.(in Chinese))
[5]
余占奎,黄宏伟,徐凌,等. 软土盾构隧道纵向设计综述[J].地下空间与工程学报,2005,1(2):315-318.(YU Zhankui,HUANG Hongwei,XU Ling,et al. A survey of the designing methods for shield tunnel in soft soil[J].Chinese Journal of Underground Space and Engineering,2005,1(2):315-318.(in Chinese))
[6]
郑永来,韩文星,童琪华,等. 软土地铁隧道纵向不均匀沉降导致的管片接头环缝开裂研究[J].岩石力学与工程学报,2005,24(24):4552-4558.(ZHENG Yonglai,HAN Wenxing,TONG Qihua,et al. Study on longitudinal crack of shield tunnel segment joint due to asymmetric settlement in soft soil[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(24):4552-4558.(in Chinese))
杨烨. 混凝土结构加固中界面的黏结方法及性能研究[硕士学位论文][D].西安:西安科技大学,2006.(YANG Ye. Research on performance and bonding methods of interface in strengthening concrete structures[M. S. Thesis][D].Xi¢an:Xi¢an University of Science and Technology,2006.(in Chinese))
[10]
BENNETTE W,MUIRS. Some fatigue tests on high-strength concrete in axial compression[J].Magazine of Concrete Research,1967,19(2):113-117.
[11]
MATSUSHITA H,TOKUMITSU Y.A study on compressive fatigue strength of concrete considered survival probability[J].Proceedings of JSCE(Japan Society of Civil Engineers),1972,198(2):127-138.