KEY PARAMETERS OF GOB-SIDE ENTRY RETAINING FORMED
BY ROOF CUT AND PRESSURE RELEASING IN
THIN COAL SEAMS
SUN Xiaoming1,2,LIU Xin1,2,LIANG Guangfeng3,WANG Dong1,2,JIANG Yulin1
(1. State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Beijing 100083,China;2. School of Mechanics and Civil Engineering,China University of Mining and Technology,Beijing 100083,China;3. Nantun Coal Mine,Yanzhou Coal Mining Group Company,Zoucheng,Shandong 273500,China)
Abstract:The key parameters in gob-side entry retaining formed by roof cutting and pressure releasing in thin coal seams at the working front 1610 in the Nantun coal mine were studied. The presplitting cutting height of roof,the presplitting cutting angle,the distance between presplitting blasting holes were determined as the key parameters based on the analysis of the stress state of roof in the process of mining. The results of numerical simulation show that,when the height of immediate roof is much higher than the height of gob and the presplitting cutting height meets the requirement of the tensile failure of immediate roof,the presplitting cutting face should deflect a certain angle towards gob in order to cut off effectively the stress transfer between the roof of gob and the roof of retaining roadway and achieve the collapsing of roof. Based on the results,the optimum distance between presplitting blasting holes was determined through field presplitting blasting test. The results have been successfully applied to an engineering project.
[1] 韩可琦,王玉浚. 中国能源消费的发展趋势与前景展望[J]. 中国矿业大学学报,2004,33(1):1–5.(HAN Keqi,WANG Yujun. Developing trend and expectation of energy consume in China[J]. Journal of China University of Mining and Technology,2004,33(1):1–5.(in Chinese))
[2] 宋振骐,崔增娣,夏洪春,等. 无煤柱矸石充填绿色安全高效开采模式及其工程理论基础研究[J]. 煤炭学报,2010,35(5):705–710.(SONG Zhenqi,CUI Zengdi,XIA Hongchun,et al. The fundamental theoretical and engineering research on the green safe no coal pillar mining model by mainly using coal gangue backfill[J]. Journal of China Coal Society,2010,35(5):705–710.(in Chinese))
[3] 孙恒虎,赵炳利. 沿空留巷的理论与实践[M]. 北京:煤炭工业出版社,1993:51–71.(SUN Henghu,ZHAO Bingli. Theory and practice of gob-side entry retaining[M]. Beijing: China Coal Industry Publishing House,1993:51–71.(in Chinese))
[4] 华心祝. 我国沿空留巷支护技术发展现状及改进建议[J]. 煤炭科学技术,2006,34(12):78–81.(HUA Xinzhu. Development status and improved proposals on gob-side entry retaining support technology in China[J]. Coal Science and Technology,2006,34(12):78–81.(in Chinese))
[5] 钱鸣高,缪协兴,许家林,等. 岩层控制的关键层理论[M]. 北京:中国矿业大学出版社,2000:87–91.(QIAN Minggao,MIAO Xiexing,XU Jialin,et al. Key strata theory in ground control[M]. Beijing:China University of Mining and Technology Press,2000:87–91.(in Chinese))
[6] 李化敏. 沿空留巷顶板岩层控制设计[J]. 岩石力学与工程学报,2000,19(5):651–654.(LI Huamin. Control design of roof rocks for gob-side entry[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(5):651–654.(in Chinese))
[7] 张东升,茅献彪,马文顶. 综放沿空留巷围岩变形特征的试验研究[J]. 岩石力学与工程学报,2002,21(3):331–334.(ZHANG Dongsheng,MAO Xianbiao,MA Wending. Testing study on deformation features of surrounding rocks of gob-side entry retaining in fully-mechanized coal face with top-coal caving[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(3):331–334.(in Chinese))
[8] 谢文兵. 综放沿空留巷围岩稳定性影响分析[J]. 岩石力学与工程学报,2004,23(18):3 059–3 065.(XIE Wenbing. Influence factors on stability of surrounding rocks of gob-side entry retaining in top-coal caving mining face[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(18):3 059–3 065.(in Chinese))
[9] 华心祝,马俊枫,许庭教. 锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机制研究及应用[J]. 岩石力学与工程学报,2005,24(12):2 107–2 112.(HUA Xinzhu,MA Junfeng,XU Tingjiao. Study on controlling mechanism of surrounding rocks of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2 107–2 112.(in Chinese))
[10] 柏建彪,周华强,侯朝炯,等. 沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报,2004,33(2):183–186.(BAI Jianbiao,ZHOU Huaqiang,HOU Chaojiong,et al. Development of support technology beside roadway in gob-side entry retaining for next sublevel[J]. Journal of China University of Mining and Technology,2004,33(2):183–186.(in Chinese))
[11] 王继承,茅献彪,朱庆华,等. 综放沿空留巷顶板锚杆剪切变形分析与控制[J]. 岩石力学与工程学报,2006,25(1):34–39.(WANG Jicheng,MAO Xianbiao,ZHU Qinghua,et al. Analysis of shearing deformation of roof support bolt and its control in gob-side entry retaining of fully-mechanized caving face[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(1):34–39.(in Chinese))
[12] 康红普,牛多龙,张 镇,等. 深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报,2010,29(10):1 977–1 986.(KANG Hongpu,NIU Duolong,ZHANG Zhen,et al. Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(10):1 977–1 986.(in Chinese))
[13] 闫玉彪,石建军,蒋正君. 沿空留巷锚带索耦合支护技术[J]. 采矿与安全工程学报,2010,27(2):273–276.(YAN Yubiao,SHI Jianjun,JIANG Zhengjun. Application of anchor cable with bolt and steel band coupling support technology in gob-side entry retaining[J]. Journal of Mining and Safety Engineering,2010,27(2):273–276.(in Chinese))
[14] 马立强,张东升,陈 涛,等. 综放巷内充填原位沿空留巷充填体支护阻力研究[J]. 岩石力学与工程学报,2007,26(3):544–550.(MA Liqiang,ZHANG Dongsheng,CHEN Tao,et al. Study on packing body supporting resistance of enter-in packing for in-situ gob-side entry retaining in fully-mechanized top-coal caving mining face[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(3):544–550.(in Chinese))
[15] 马立强,张东升,王红胜,等. 厚煤层巷内预置充填带无煤柱开采技术[J]. 岩石力学与工程学报,2010,29(4):674–680.(MA Liqiang,ZHANG Dongsheng,WANG Hongsheng,et al. Mining technique with preset packing body in roadway for thick coal seam without coal pillars[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(4):674–680.(in Chinese))
[16] 费旭敏. 我国沿空留巷支护技术现状及存在的问题探讨[J]. 中国科技信息,2008,21(7):48–49.(FEI Xumin. The status of support technology on gob-side entry retaining roadway and existing problem discussion[J]. China Science and Technology Information,2008,21(7):48–49.(in Chinese))
[17] 张国锋,何满潮,俞学平,等. 白皎矿保护层沿空切顶成巷无煤柱开采技术研究[J]. 采矿与安全工程学报,2011,28(4):511–516.(ZHANG Guofeng,HE Manchao,YU Xueping,et al. Research on the technique of no-pillar mining with gob-side entry formed by advanced roof caving in the protective seam in Baijiao coal mine[J]. Journal of Mining and Safety Engineering,2011,28(4):511–516.(in Chinese))
[18] 宋润权,谢家鹏. 切顶卸压技术在工作面及沿空巷道维护中的应用[J]. 煤炭科技,2012,(3):52–54.(SONG Runquan,XIE Jiapeng. The application of cut roof and released pressure technology in working face and gob-side entry maintenance[J]. Coal Science and Technology,2012,(3):52–54.(in Chinese))
[19] 王巨光,王 刚. 切顶卸压沿空留巷技术探讨[J]. 煤炭工程,2012,(1):24–26.(WANG Juguang,WANG Gang. Discussion on gateway retained along goal technology with roof breaking and pressure releasing[J]. Coal Engineering,2012,(1):24–26.(in Chinese))
[20] 何满潮,曹伍富,单仁亮,等. 双向聚能拉伸爆破新技术[J]. 岩石力学与工程学报,2003,22(12):2 047–2 051.(HE Manchao,CAO Wufu,SHAN Renliang. et al. New blasting technology——bilateral cumulative[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(12):2 047–2 051.(in Chinese))
[21] 宋振骐. 实用矿山压力与控制[M]. 北京:中国矿业大学出版社,1988:38–51.(SONG Zhenqi. Practical ground pressure and control[M]. Beijing:China University of Mining and Technology Press,1988:38–51.(in Chinese))
[22] 高 峰,钱鸣高,缪协兴. 老顶给定变形下直接顶受力变形分析[J]. 岩石力学与工程学报,2000,19(2):145–148.(GAO Feng,QIAN Minggao,MIAO Xiexing. Mechanical analysis of the immediate roof subjected to given deformation of the main roof[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(2):145–148.(in Chinese))
[23] 彭文斌. FLAC3D实用教程[M]. 北京:机械工业出版社,2007:19–26.(PENG Wenbin. Practical course of FLAC3D[M]. Beijing:China Machine Press,2007:19–26.(in Chinese))