[1] YANG C S,MO H H,CHEN J S. Selection of reasonable scheme of entering into a working well in shield construction[J]. Electronic Journal of Geotechnical Engineering,2013,18:3 987–3 998.
[2] 中华人民共和国行业标准编写组. GJB 02——98 广州地区建筑基坑支护技术规定[S]. 广州:[s.n.],1998.(The Professional Standards Compilation Group of
People¢s Republic of China. GJB 02——98 Code for technique of building foundation pit engineering in Guangzhou[S]. Guangzhou:[s.n.],1998 (in Chinese))
[3] 赵 辉. 城市电力电缆隧道的通风设计[J]. 华北电力技术,2009, (6):11–13.(ZHAO Hui. Ventilation design of urban power cable tunnel[J]. North China Electric Power,2009,(6):11–13.(in Chinese))
[4] 中华人民共和国国家标准编写组. GB 5027—2007 电力工程电缆设计规范[S]. 北京:人民出版社,2007.(The National Standards Compilation Group of People¢s Republic of China. GB 5027—2007 Code for design of cables of electric engineering[S]. Beijing:People¢s Publishing House,2007(in Chinese))
[5] 杜金龙,杨 敏. 邻近基坑桩基侧向变形加固控制分析[J]. 结构工程师,2008,24(5):93–99.(DU Jinlong,YANG Min. Deflection control analysis of pile adjacent to deep excavation[J]. Structural Engineers,2008,24(5):93–94.(in Chinese))
[6] CHEN J S,MO H H. Mechanical behavior of segment rebar of shield tunnel in construction stage[J]. Journal of Zhejiang University,2008,9(7):888–899.
[7] 陈俊生,莫海鸿. 盾构隧道管片施工阶段力学行为的三维有限元分析[J]. 岩石力学与工程学报,2006,25(增2):3 482–3 489.(CHEN Junsheng,MO Haihong. Three-dimensional finite analysis of mechanical behaviors of shield tunnel segment during construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 482–3 489.(in Chinese))

[8] 张海波,殷宗泽,朱俊高,等. 盾构法隧道衬砌施工阶段受力特性的三维有限元模拟[J]. 岩土力学,2005,26(6):990–994.(ZHANG Haibo,YIN Zongze,ZHU Jungao,et al. Three-dimensional FEM simulation of shield-driven tunnel lining during construction stage[J]. Rock and Soil Mechanics,2005,26(6):990–994.(in Chinese))
[9] 杨春山,莫海鸿,陈俊生,等. 盾构隧道先隧后井施工法对管片张开量的影响研究[J]. 岩石力学与工程学报,2014,33(增1):2 870–2 877.(YANG Chunshan,MO Haihong,CHEN Junsheng,et al. Study the influence on segment opening of shield tunneling by tunnels followed by well excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):2 870–2 877.(in Chinese))
[10] 黄钟晖,廖少明,侯学渊. 错缝拼装衬砌纵向螺栓剪切模型的研究[J]. 岩石力学与工程学报,2004,23(6):952–958.(HUANG Zhonghui,LIAO Shaoming,HOU Xueyuan. Research on shear model of ring joint bolts in stagger-jointed segmental linings[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(6):952–958.(in Chinese))
[11] 张新金,刘维宁,路美丽,等. 盾构法与明挖法结合建造地铁车站的结构方案研究[J]. 铁道学报,2009,31(6):83–90.(ZHANG Xinjin,LIU Weining,LU Meili,et al. Research of metro station structure scheme by enlarging shield tunnel with open cut method[J]. Journal of the China Railway Society,2009,31(6):83–90.(in Chinese))