[1] 花加凤,束一鸣,张贵科,等. 土石坝坝面防渗膜中的夹具效应[J].水利水电科技进展,2007,27(2):66–68.(HUA Jiafeng,SHU Yiming,ZHANG Guike,et al. Clamping effect in geomembranes used for seepage control of upstream surface of earth rock dam[J]. Advances in Science and Technology of water Resources,2007,27(2):66–68.(in Chinese))
[2] 曹克明,汪易森,徐建军,等. 混凝土面板堆石坝[M]. 北京:中国水利水电出版社,2008:312–313.(CAO Keming,WANG Yisen,XU Jiangjun,et al. Concrete face rockfill dam[M]. Beijing:China Water and Power,2008:312–313.(in Chinese))
[3] GIROUD J P,TISSEAU B,SODERMAN K L,et al. Analysis of strain concentration next to geomembrane seams[J]. Geosynthetics International,1995,2(6):255–276.
[4] GIROUD J P,SODERMAN K L. Design of structure connected to geomembranes[J]. Geosynthetics International,1995,2(2):379–428.
[5] GIROUD J P,SODERMAN K L. Comparison of geomembranes subjected to differential settlement[J]. Geosynthetics International,1995,2(6):953–968.
[6] KODIKARA J. Analysis of tension development in geomembrane placed on landfill slopes[J]. Geotextiles and Geomembranes,2000,18:47–61.
[7] TOGNON R,MOORE I D. Geomembrane strain observed in large-scale testing of protection layers[J]. Journal of Geotechnical and Geo-enviromental Engineering,ASCE,2000,126(12):1 194–1 208.
[8] ZHU B,GAO D,CHEN Y M. Geomembrane tensions and strains resulting from differential settlement around rigid circular structures[J]. Geotexts and Geomembranes,2009,27:53–62.
[9] 沈长松,顾淦臣. 复合土工膜厚度计算方法研究[J]. 河海大学学报. 2004,32(4):395–398.(SHEN Changsong,GU Gancheng. Calculation method for thickness of composite geomembrane[J]..Journal of Hohai University,2004,32(4):395–398.(in Chinese))
[10] 岑威钧,沈长松,李 星,等. 堤坝中防渗(复合)土工膜的布置型式及计算理论研究[J]. 红水河,2004,23(3):70–74.(CEN Weijun,SHEN Changsong,LI Xing,et al. Study on layout pattern and computation theory of impervious(composite) geomembrane in dike and dam[J]. Hongshui River,2004,23(3):70–74.(in Chinese))
[11] 中国水电顾问集团华东勘测设计研究院. 金沙江白鹤水电站施工导流专题研究报告[R]. 杭州:中国水电顾问集团华东勘测设计研究院,2011.(HydroChina Huadong Engineering Corporation. A special report on construction diversion of Jinsha river Baihetan hydropower[R]. Hanzhou:HydroChina Huadong Engineering Corporation,2011.(in Chinese))
[12] 顾淦臣,束一鸣,沈长松. 土石坝工程经验与创新[M]. 北京:中国电力出版社,2004:247–248.(GU Gancheng,SHU Yiming,SHEN Changsong. Experience and innovation of Earth rock-fill dam Engineering[M]. Beijing:China Electric Power Press,2004:247–248.(in Chinese))
[13] 岑威钧,沈长松,童建文. 深厚覆盖层上复合土工膜防渗堆石坝筑坝特性研究[J]. 岩土力学,2009,30(1):175–180.(CEN Weijun,SHEN Changsong,TONG Jianwen. Study of construction behavior of composite geomembrane rockfill dam on thick alluvium deposit[J]. Rock and Soil Mechanics,2009,30(1):175–180.(in Chinese))
[14] 王永明,任金明,陈永红,等. 基于混凝土多轴强度的高土石围堰防渗墙安全性研究[J]. 岩石力学与工程学报,2014,33(增1):2 662–2 669.(WANG Yongming,REN Jinming,CHEN Yonghong,et al. Research on high earth rock cofferdam impervious wall security based on multi-axial strength of concrete[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):2 662–2 669.(in Chinese))
[15] DUNCAN J M,CHANG G Y. Non-linear analysis of stresses and strain in soils[J]. Journal of the Soil Mechanics and Foundations Division,1970,96(5):1 629–1 652.
[16] 李青云,程展林. 三峡工程二期围堰运行后性状分析[J]. 岩土工程学报,2005,27(4):410–413.(LI Qingyun,CHENG Zhanlin. Analysis of the behavior of stage II of cofferdam of TGP[J]. Chinese Journal of Geotechnical Engineering,2005,27(4):410–413.(in Chinese))
[17] 刘斯宏,徐永福. 粒状体直剪试验的数值模拟与微观考察[J]. 岩石力学与工程学报,2001,20(3):288–292.(LIU Sihong,XU Yongfu. Numerical simulation for a direct box shear test on granular material and microscopic and microscopic consideration[J]. Chinese Journal of Rock Mechanics and Engineering,2001,20(3):288–292.(in Chinese))