Three-dimensional transient stability of slopes during pile driving using upper-bound limit analysis
RAO Pingping1,ZHAO Linxue1,LI Lin2,LIU Ying3
(1. Department of Civil Engineering,University of Shanghai for Science and Technology,Shanghai 200093,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3. College of Civil Engineering and Architecture,Nanchang Institute Technology,Nanchang,Jiangxi 330099,China)
[1] 杨克己. 实用桩基工程[M]. 北京:人民交通出版社,2004:163–166.(YANG Keji. Practical pile foundation engineering[M]. Beijing:China Communications Press,2004:163–166.(in Chinese))
[2] 潘振社.高桩码头打桩稳定验算的探讨[J]. 港工技术,1986,(2):30–34.(PAN Zhenshe. The exploration of checking computations of the high pile wharf piling stability[J]. Port Engineering Technology,1986,(2):30–34.(in Chinese))
[3] CHEN W F. Limit analysis and soil plasticity[M]. [S. l.]:Elsevier,1975:399–446.
[4] MICHALOWSKI R L. Slope stability analysis:a kinematical approach[J]. Geotechnique,1995,45(2):283–293.
[5] DONALD I,CHEN Z Y. Slope stability analysis by the upper bound approach:fundamentals and methods[J]. Canadian Geotechnical Journal,1997,34(6):853–862.
[6] LI X P,HE S M,WANG C H. Stability analysis of slopes reinforced with piles using limit analysis method[C]// Advances in Earth Structures:Research to Practice. Shanghai:Geo-Institute,2006:105–112.
[7] ZHAO L H,LI L,YANG F,et al. Upper bound analysis of slope stability with nonlinear failure criterion based on strength reduction technique[J]. Journal of Central South University,2010,17(4):836–844.
[8] 张晓曦,何思明,尹平保. 沉入式抗滑桩优化设计研究[J]. 土木工程学报,2012,45(12):143–149.(ZHANG Xiaoxi,HE Siming,YIN Pingbao. Optimum design of deeply embedded anti-slide pile[J]. China Civil Engineering Journal,2012,45(12):143–149.(in Chinese))
[9] 唐高朋,赵炼恒,李 亮. 基于MATLAB的边坡稳定性极限上限分析程序开发[J]. 岩土力学,2013,34(7):2 091–2 098.(TANG Gaopeng,ZHAO Lianheng,LI Liang. Program development for slope stability using MATLAB software and upper bound limit analysis[J]. Rock and Soil Mechanics,2013,34(7):2 091–2 098.(in Chinese))
[10] 孙志彬. 边坡稳定性上限分析方法及参数反演研究[博士学位论文][D]. 长沙:中南大学,2013.(SUN Zhibin. Upper bound analysis of slope stability and approaches to parameter back analysis[Ph. D. Thesis][D]. Changsha:Central South University,2013.(in Chinese))
[11] 饶平平,李镜培,刘 颖. 斜边非轴对称位移边界下球孔扩张挤土分析[J]. 岩土力学,2011,32(9):2 681–2 687.(RAO Pingping,LI Jingpei,LIU Ying. Analysis of soil squeezing effect for spherical cavity expansion with inclined nonaxisymmetric displacement boundary[J]. Rock and Soil Mechanics,2011,32(9):2 681–2 687. (in Chinese))
[12] 饶平平,李镜培,崔纪飞. 邻近斜坡静压沉桩挤土效应试验[J]. 中国公路学报,2014,27(3):25–31.(RAO Pingping,LI Jingpei,CUI Jifei. Model test research on squeezing effect during pile-sinking adjacent to slope[J]. China Journal of Highway and Transport,2014,27(3):25–31.(in Chinese))
[13] FARZANEH O,ASKARI F,GANJIAN N. Three-dimensional stability analysis of convex slopes in plan view[J]. Journal of Geotechnical and Geoenvironmental Engineering,2008,134(8):1 192–1 200.
[14] MICHALOWSKI R L,DRESCHER A. Three-dimensional stability of slopes and excavations[J]. Geotechnique,2009,59(10):839–850.
[15] HAN C Y,CHEN J J,WANG J H,et al. Three-dimensional stability analysis of excavation using limit analysis[J]. Journal of Shanghai Jiaotong University,2013,18(6):646–649.
[16] HAN C Y,CHEN J J,XIA X H,et al. Three-dimensional stability analysis of anisotropic and non-homogeneous slopes using limit analysis[J]. Journal of Central South University,2014,21(3):1 142–1 147.
[17] GAO Y F,ZHANG F,LEI G H,et al. An extended limit analysis of three-dimensional slope stability[J]. Geotechnique,2013,63(6):518–524.
[18] GAO Y F,YE M,ZHANG F. Three-dimensional analysis of slopes reinforced with piles[J]. Journal of Central South University,2015,22:2 322–2 327.
[19] 樊向阳. 静压桩施工沉桩阻力及沉桩挤土效应研究[博士学位论文][D]. 上海:同济大学,2007.(FAN Xiangyang. Study of sinking-resistance and compaction effect of static-press pile[Ph. D. Thesis][D]. Shanghai:Tongji University,2007.(in Chinese))
[20] ITO T,MATSUI T. Methods to estimate lateral force acting on stability piles[J]. Soils and Foundations,1975,15(4):43–59.