Experimental study on seepage failure mechanism in an upper-fine-lower-coarse composite sandy strata and its preliminary engineering application#br#
PAN Hong1,2,CAI Lei1,2,LUO Junxing1,3,CAO Hong1,2,LUO Guanyong1,2
(1. School of Civil Engineering and Transportation,South China University of Technology,Guangzhou,Guangdong 510640,China;2. The State Key Laboratory of Subtropical Building Science,South China University of Technology,Guangzhou,Guangdong 510640,China;3. CCCC Fourth Harbor Engineering Institute Co.,Ltd.,Guangzhou,Guangdong 510230,China)
Abstract:Highly water-rich sand strata is prone to causing seepage failure and is the main risk source for underground construction. At present,the mechanism of seepage failure in the composite strata of“upper fine and lower coarse”is not clear. By analyzing and comparing 14 groups of sand erosion model test data,it is found that the seepage damage characteristics of the composite strata composed of the lower coarse sand and the upper fine sand are significantly different from that of the single strata. The lower layer has small energy consumption and mainly plays the role of water supply,while the upper layer of fine sand has small permeability and bears most of the seepage force,thus causing rapid loss of fine sand particles and leading to sand boiling/static liquefaction. Under the same boundary conditions,groundwater disturbs the soil of the composite strata more extensively,and the soil loss is more significant and the loss rate is faster. The sand boiling phenomenon is most significant when the seepage outlet is close to the interface of coarse sand and fine sand and on the side of fine sand. Based on the observations obtained from the test,the causes of the large area collapse in the “2.7” subway accident in Foshan in 2018 were discussed. It is considered that the composite sand layer of “fine top and coarse bottom" and the unique location of the leakage outlet - "the interface of fine sand and medium coarse sand” are the main causes of the large area collapse of the accident. In similar projects,it is necessary to pay attention to the identification of the composite sand layer and make good sealing measures to prevent the emergence of the seepage outlet.
[1] 方江华,张志红,张景钰. 人工冻结法在上海轨道交通四号线修复工程中的应用[J]. 土木工程学报,2009,42(8):124–128.(FANG Jianghua,ZHANG Zhihong,ZHANG Jingyu. Application of artificial freezing to recovering a collapsed tunnel in Shanghai metro No.4 line[J]. China Civil Engineering Journal,2009,42(8):124–128.(in Chinese))
[2] 李新宇. 城市盾构隧道施工水致灾害机制与安全风险控制[博士学位论文][D]. 北京:北京交通大学,2020.(LI Xinyu. Water-induced disaster mechanism and safety risk control of urban shield tunnel construction[Ph. D. Thesis][D]. Beijing:Beijing Jiaotong University,2020.(in Chinese))
[3] 车灿辉,张智博,刘 实. 南京长江漫滩地区某深基坑突水原因分析及治理[J]. 岩土工程技术,2014,28(4):183–187.(Che Canhui,ZHANG Zhibo,LIU Shi. Analysis and management of confined water inrush of a deep foundation pit in the floodplain area of Nanjing Yangze River[J]. Geotechnical Engineering Technique,2014,28(4):183–187.(in Chinese))
[4] XU X B,HU Q,HUANG T M,et al. Seepage failure of a foundation pit with confined aquifer layers and its reconstruction[J]. Engineering Failure Analysis,2022,138(8):1–13.
[5] 广东省应急管理厅. 2018年广东省佛山市轨道交通2号线一期工程“2.7”透水坍塌重大事故调查报告[R]. 广州:广东省应急管理厅,2018.(Department of Emergency Management of Guangdong Province. In 2018,Foshan Rail Transit Line 2 Phase I Project “2.7” major accident investigation report of permeable collapse[R]. Guangzhou:Emergency Management Department of Guangdong Province,2018.(in Chinese))
[6] 广东省应急管理厅. 广州市天河区中铁五局四公司在建轨道交通十一号线沙河站横通道“12•1”坍塌事故调查报告[R]. 广州:广东省应急管理厅,2020.(Department of Emergency Management of Guangdong Province. Investigation report of the “12•1” collapse accident in the horizontal passage of Shahe Station of Rail Transit Line 11 under construction by China Railway Fifth Bureau and Fourth Company in Tianhe District[R]. Guangzhou:Emergency Management Department of Guangdong Province,2020.(in Chinese))
[7] 刘映晶,杨 杰,尹振宇. 内部侵蚀对地下结构影响的数值分析:在隧道渗漏问题上的应用[J]. 岩土力学,2022,43(5):1 383–1 390. (LIU Yingjing,YANG Jie,YIN Zhenyu. Numerical analysis of the impact of internal erosion on underground structures:application to tunnel leakage[J]. Rock and Soil Mechanics,2022,43(5):1 383–1 390.(in Chinese))
[8] QIAN J G,LI W Y,YIN Z Y,YANG Y. Influences of buried depth and grain size distribution on seepage erosion in granular soils around tunnel by coupled CFD-DEM approach[J]. Transportation Geotechnics,2021,29(7):1–23.
[9] ZHANG D M,GAO C P,YIN Z Y. CFD-DEM modeling of seepage erosion around shield tunnels[J]. Tunnelling and Underground Space Technology,2019,83:60–72.
[10] 张冬梅,高程鹏,尹振宇,等. 隧道渗流侵蚀的颗粒流模拟[J]. 岩土力学,2017,38(增1):429–438.(ZHANG Dongmei,GAO Chengpeng,YIN Zhenyu,et al. Particle flow simulation of seepage erosion around shield tunnel[J]. Rock and Soil Mechanics,2017,38(Supp.1):429–438.(in Chinese))
[11] 路 平,陈 灿,廖陈畅,等. 水下盾构隧道接缝渗漏规律的模型试验研究[J]. 岩石力学与工程学报,2019,38(5):993–1 004.(LU Ping,CHEN Can,LIAO Chenchang,et al. Model test on joint leakage in underwater shield tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(5):993–1 004.(in Chinese))
[12] 刘成禹,陈博文,林 炜,等. 地下管道破损诱发沉降的预测模型及试验验证[J]. 岩土工程学报,2021,43(3):416–424.(LIU Chengyu,CHEN Bowen,LIN Wei,et al. Prediction model for settlement caused by damage of underground pipelines and its experimental verification[J]. Chinese Journal of Geotechnical Engineering,2021,43(3):416–424.(in Chinese))
[13] 郑 刚,戴 轩,张晓双. 地下工程漏水漏砂灾害发展过程的试验研究及数值模拟[J]. 岩石力学与工程学报,2014,33(12):2 458–2 471.(ZHENG Gang,DAI Xuan,ZHANG Xiaoshuang. Experimental study and numerical simulation of leaking process of sand and water in underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(12):2 458–2 471.(in Chinese))
[14] 戴 轩,郑 刚,程雪松,等. 基于DEM-CFD方法的基坑工程漏水漏砂引发地层运移规律的数值模拟[J]. 岩石力学与工程学报,2019,38(2):396–408.(DAI Xuan,ZHENG Gang,CHENG Xuesong,et al. Numerical simulation of ground movement induced by leakage of groundwater and sand in excavations based on the DEM-CFD method[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(2):396–408.(in Chinese))
[15] 郑 刚,程雪松,周海祚,等. 岩土与地下工程结构韧性评价与控制[J]. 土木工程学报,2022,55(7):1–38.(ZHENG Gang,CHENG Xuesong,ZHOU Haizuo,et al. Resilient evaluation and control in geotechnical and underground engineering[J]. China Civil Engineering Journal,2022,55(7):1–38.(in Chinese))
[16] ZHENG G,DAI X,DIAO Y. Parameter analysis of water flow during EPBS tunnelling and an evaluation method of spewing failure based on a simplified model[J]. Engineering Failure Analysis,2015,58:96–112.
[17] ZHENG G,DAI X,DIAO Y,et al.Experimental and simplified model study of the development of ground settlement under hazards induced by loss of groundwater and sand[J]. Natural Hazards,2016,82(3):1 869–1 893.
[18] 丁留谦,姚秋玲,孙东亚,等. 三层堤基管涌砂槽模型试验研究[J].水利水电技术,2007,(2):19–22.(DING Liuqian,YAO Qiuling,SUN Dongya,et al. Experimental studies on piping development in three-stratum dike foundation[J]. Water Resources and Hydraulic Engineering,2007,(2):19–22.(in Chinese))
[19] 王 霜,陈建生,周 鹏. 三层堤基中细砂层厚度对管涌影响的试验研究[J]. 岩土力学,2015,36(10):2 847–2 854.(WANG Suang,CHEN Jiansheng,ZHOU Peng. Effect of thickness of fine sand layer on piping development in three-stratum dike foundation[J]. Rock and Soil Mechanics,2015,36(10):2 847–2 854.(in Chinese))
[20] 陈建生,袁克龙,王 霜,等. 细砂层埋深对堤基管涌影响的试验研究[J]. 岩土力学,2015,36(3):653–659.(CHEN Jiansheng,YUAN Kelong,WANG Shuang,et al. Experimental research on piping development considering buried depth of fine sand[J]. Rock and Soil Mechanics,2015,36(3):653–659.(in Chinese))
[21] 罗俊兴. 高富水砂层中地下工程涌水涌砂引起的土体渗流侵蚀试验研究[硕士学位论文][D]. 广州:华南理工大学,2020.(LUO Junxing. Experimental study on internal erosion caused by water gushing and sand gushing of underground engineering in high water-rich sand layer[M. S. Thesis][D]. Guangzhou:South China University of Technology,2020.(in Chinese))
[22] XIAO Y,CAO H,LUO G. Experimental investigation of the backward erosion mechanism near the pipe tip[J]. Acta Geotechnica,2019,14(3):767–781.
[23] 骆冠勇,潘 泓. 结合Bathe算法及Signorini条件求解饱和–非饱和无压渗流问题[J]. 岩石力学与工程学报,2013,32(11):2 275–2 282.(LUO Guanyong,PAN Hong. Using Bathe algorithm and Signorini condition to solve unconfined saturated-unsaturated seepage problems[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(11):2 275–2 282.(in Chinese))