CONSTRUCTION SCHEME CHOICE OF LARGE-SPAN TUNNELS UNDER-PASSING HIGH VOLTAGE TRANSMISSION TOWER AND ITS APPLICATION
YANG Junsheng1,YANG Yuanhong1,2,YAN Li3,ZHANG Hualin1,3,HU Xin1,TANG Peng1
(1. School of Civil Engineering,Central South University,Changsha,Hunan 410075,China;2. China Forest Exploration and
Design Institute On Kunming,Kunming,Yunnan 650216,China;3. School of Civil Engineering and Architecture,Changsha University of Science and Technology,Changsha,Hunan 410076,China)
Abstract:Lijiachong large-span tunnel is excavated below the existing high-voltage transmission tower,and the risk of tunnel construction is very high. Several possible schemes for tunnel construction and foundation reinforcement of high-voltage transmission tower were presented based on risk analysis;and comparison among tunnel excavation using two-side wall drift heading method after mountain grunting consolidation,tunnel excavation using three bench method with the core of surrounding rock remained after tower foundation were reinforced with H-shaped framed girders,and tunnel excavation using three bench method with the core of surrounding rock remained after tower foundation were underpinned are introduced through a 3D numerical analysis of the interaction between tunnel construction and high-voltage transmission tower. The scheme of using H-shaped framed girders to connect the foundations as a whole is adopted. It is shown that after the pile foundations were connected with H-shaped framed girders,the foundations worked as a whole,tunneling using three bench method with the core of surrounding rock remained became safety. Cumulative settlement and uneven settlement were well controlled,and the forces and deformations of the tower were in the allowable ranges. By reinforcing the tower foundations using the H-shaped framed girders,Lijiachong tunnel safely passed beneath the transmission tower;and good economical and technical results are obtained. The results can provide a reference for similar projects.
阳军生1,杨元洪1,2,晏 莉3,张华林1,3,胡 鑫1,唐 鹏1. 大断面隧道下穿既有高压输电铁塔施工方案比选及其应用[J]. 岩石力学与工程学报, 2012, 31(6): 1184-1191.
YANG Junsheng1,YANG Yuanhong1,2,YAN Li3,ZHANG Hualin1,3,HU Xin1,TANG Peng1. CONSTRUCTION SCHEME CHOICE OF LARGE-SPAN TUNNELS UNDER-PASSING HIGH VOLTAGE TRANSMISSION TOWER AND ITS APPLICATION. , 2012, 31(6): 1184-1191.
张殿生. 电力工程高压送电线路设计手册[M]. 北京:中国电力出版社,2003:318-324.(ZHANG Diansheng. Design handbook of high voltage transmission line engineering[M]. Beijing:China Electric Power Press,2003:318-324.(in Chinese))