EVALUATION OF ROCK MASS QUALITY AND STABILITY ANALYSIS OF XILUODU ARCH DAM UNDER CONSTRUCTION PHASE
LIN Peng1,KANG Shengzu1,LI Qingbin1,WANG Renkun2,WANG Zhilin3
(1. State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China;2. HydroChina Chengdu Engineering Corporation,Chengdu,Sichuan 610072,China;3. China Three Gorges Corporation,Beijing 100038,China)
Abstract:By employing wave velocity test and deformation monitoring method,the use of checking different standards according to different zones,sections,layers and classification of rock masses,a re-evaluation of rock mass quality is carried out during construction period. Based on the nonlinear finite element method,the overall stability of the typical stage of the construction period of dam is simulated. The real mechanical parameters of rock mass are obtained by feedback analysis based on the geophysical results and monitoring data of field deformation and stress. The numerical results reflect the working condition of the dam in construction and operation periods,and also guide the construction process. The conclusions from this study have been applied to the design of Xiluodu project and are also beneficial to the design and construction of the similar projects.
林 鹏1,康绳祖1,李庆斌1,王仁坤2,汪志林3. 溪洛渡拱坝施工期岩体质量评价与大坝稳定分析[J]. 岩石力学与工程学报, 2012, 31(10): 2042-2052.
LIN Peng1,KANG Shengzu1,LI Qingbin1,WANG Renkun2,WANG Zhilin3. EVALUATION OF ROCK MASS QUALITY AND STABILITY ANALYSIS OF XILUODU ARCH DAM UNDER CONSTRUCTION PHASE. , 2012, 31(10): 2042-2052.
李 瓒,陈 飞,郑建波,等. 特高拱坝枢纽分析与重点问题研究[M]. 北京:中国电力出版社,2004:1-10.(LI Zan,CHEN Fei,ZHENG Jianbo,et al. Study on key problems of super high arch dam[M]. Beijing:China Electric Power Press,2004:1-10.(in Chinese))
Your browse does not support frame!