[8] |
涂 劲,李德玉,陈厚群,等. 大岗山拱坝-地基体系整体抗震安全性研究[J]. 水利学报,2011,42(2):152-159.(TU Jin,LI Deyu,CHEN Houqun,et al. Study on integral seismic safety of Dagangshan arch dam-foundation system[J]. Journal of Hydraulic Engineering,2011,42(2):152-159.(in Chinese))
|
[15] |
易桂喜,龙 锋,梁明剑,等. 2022年9月5日四川泸定MS 6.8地震序列发震构造[J]. 地球物理学报,2023,66(4):1 363-1 384.(YI Guixi,LONG Feng,LIANG Mingjian,et al. Seismogenic structure of the 5 September 2022 Sichuan Luding Ms6.8 earthquake sequence[J]. Chinese Journal of Geophysics,2023,66(4):1 363-1 384.(in Chinese))
|
[17] |
黄会宝,陈 刚,江德军. 四川泸定MS 6.8级地震大岗山特高拱坝变形特征分析[J]. 水利学报,2023,54(5):599-609.(HUANG Huibao,CHEN Gang,JIANG Dejun. Deformation characteristics analysis of Dagangshan super high arch dam in Sichuan Luding MS 6.8 earthquake[J]. Journal of Hydraulic Engineering,2023,54(5):599-609.(in Chinese))
|
[18] |
郭永刚,涂 劲,陈厚群. 高拱坝伸缩横缝间布设阻尼器对坝体地震反应影响的研究[J]. 世界地震工程,2003,(3):44-49.(GUO Yonggang,TU Jin,CHEN Houqun. Study on effect of damper between contraction joints on seismic response of the high arch dam[J]. World Earthquake Engineering,2003,(3):44-49.(in Chinese))
|
[6] |
秦礼君,陈健云,徐 强,等. 高拱坝抗震安全评价指标研究——以白鹤滩拱坝为例[J]. 水利学报,2022,53(9):1 116-1 126.(QIN Lijun,CHEN Jianyun,XU Qiang,et al. Study on seismic safety evaluation index of the high arch dam:a case study of Baihetan arch dam[J]. Journal of Hydraulic Engineering,2022,53(9):1 116-1 126. (in Chinese))
|
[16] |
张 喆,房立华,许力生. 2022年四川泸定MS 6.8地震震源基本特征[J]. 地球物理学报,2023,66(4):1 397-1 408.(ZHANG Zhe,FANG Lihua,XU Lisheng. Primary source characteristics of the 2022 Sichuan Luding MS 6.8 Earthquake[J]. Chinese Journal of Geophysics,2023,66(4):1 397-1 408.(in Chinese))
|
[4] |
陈厚群,徐泽平,李 敏. 汶川大地震和大坝抗震安全[J]. 水利学报,2008,39(10):1 158-1 167.(CHEN Houqun,XU Zeping,LEE Min. Wenchuan Earthquake and seismic safety of large dams[J]. Journal of Hydraulic Engineering,2008,39(10):1 158-1 167.(in Chinese))
|
[14] |
李思嘉,徐敬武,吴灌洲,等. 大渡河大岗山水电站枢纽工程蓄水安全鉴定设计自检报告(第三分册 工程地质)[R]. 成都:中国电建集团成都勘测设计研究院有限公司,2022.(LI Sijia,XU Jingwu,WU Guanzhou,et al. Self-inspection report on water storage safety appraisal design of Dagangshan hydropower station hub project on Dadu River(engineering geology in book III)[R]. Chengdu :China Electric Power Construction Group Chengdu Survey and Design Institute Co.,Ltd.,2022.(in Chinese))
|
[1] |
程 立,吴亚军,魏志远. 特高拱坝建设管理与施工技术总结与展望[J]. 水力发电,2020,46(10):73-77.(CHENG Li,WU Yajun,WEI Zhiyuan. Summary and prospect of construction management and technology of super-high arch dams[J]. Water Power,2020,46(10):73-77.(in Chinese))
|
[3] |
涂 劲,李德玉,张翠然,等. 汶川地震中沙牌拱坝震情验证研究[J]. 水利学报,2016,47(5):656-662.(TU Jin,LI Deyu,ZHANG Cuiran,et al. Verification of the seismic performance of Shapai arch dam during Wenchuan earthquake[J]. Journal of Hydraulic Engineering,2016,47(5):656-662.(in Chinese))
|
[5] |
范书立,陈健云,王建涌,等. 高拱坝振动台地震破坏试验研究及数值仿真[J]. 岩石力学与工程学报,2009,28(3):467-474.(FAN Shuli,CHEN Jianyun,WANG Jianyong,et al. Experimental study and numerical simulation for seismic failure of high arch dam on shaking table[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(3):467-474.(in Chinese))
|
[7] |
林 鹏,王仁坤,李庆斌,等. 汶川8.0级地震对典型高坝结构安全的影响分析[J]. 岩石力学与工程学报,2009,28(6):1 261-1 269. (LIN Peng,WANG Renkun,LI Qingbin,et al. Effect analysis of structural safety of typical large dams in Wenchuan 8.0 earthquake[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(6):1 261-1 269.(in Chinese))
|
[10] |
马 克,金 峰,唐春安,等. 基于微震监测的大岗山高拱坝坝踵蓄水初期变形机制研究[J]. 岩石力学与工程学报,2017,36(5):1 111-1 121.(MA Ke,JIN Feng,TANG Chun?an,et al. Deformation mechanism of the dam heel of Dagangshan high arch dam based on microseismic monitoring during initial impoundment[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(5):1 111-1 121. (in Chinese))
|
[2] |
李 静,陈健云,徐 强,等. 高拱坝抗震性能评价指标研究[J]. 水利学报,2015,46(1):118-124.(LI Jing,CHEN Jianyun,XU Qiang,et al. Study on index of seismic performance evaluation of arch dam[J]. Journal of Hydraulic Engineering,2015,46(1):118-124.(in Chinese))
|
[12] |
钟菊芳,温世亿,胡 晓. 沙牌坝址基岩场地地震动输入参数研究[J]. 岩土力学,2011,32(2):387-392.(ZHONG Jufang,WEN Shiyi,HU Xiao. Study of ground motion input parameters of Shapai dam rock site[J]. Rock and Soil Mechanics,2011,32(2):387-392. (in Chinese))
|
[9] |
金爱云,王进廷,潘坚文. 基于主余震序列的高拱坝极限抗震能力损失研究[J]. 振动与冲击,2022,41(3):82-89. (JIN Aiyun,WANG Jinting,PAN Jianwen. Ultimate seismic capacity loss of high arch dam based on mainshock-aftershock sequences[J]. Journal of Vibration and Shock,2022,41(3):82-89.(in Chinese))
|
[11] |
郭胜山,李德玉,涂 劲,等. 汶川地震中沙牌拱坝坝体分缝开裂分析[J]. 水力发电学报,2014,33(6):174-180.(GUO Shengshan,LI Deyu,TU Jin,et al. Crack analysis of Shapai arch dam joints under the Wenchuan earthquake[J]. Journal of Hydroelectric Engineering,2014,33(6):174-180.(in Chinese))
|
[19] |
罗秉艳,徐艳杰,王光纶. 大岗山拱坝考虑阻尼器抗震措施的非线性动力反应分析[J]. 水力发电学报,2007,(1):67-70.(LUO Bingyan,XU Yanjie,WANG Guanglun. Nonlinear dynamic analysis of Dagangshan arch dam with considering damper reinforcement[J]. Journal of Hydroelectric Engineering,2007,(1):67-70.(in Chinese))
|
[13] |
邵敬东,黎满林,刘 翔,等. 高地震区大岗山水电站拱坝设计[J]. 水力发电,2015,41(7):34-38.(SHAO Jingdong,LI Manlin,LIU Xiang,et al. Design of Dagangshan arch dam located in high seismic intensity area[J]. Water Power,2015,41(7):34-38.(in Chinese))
|