KEY PARAMETERS OF GOB-SIDE ENTRY RETAINING FORMED
BY ROOF CUT AND PRESSURE RELEASING IN
THIN COAL SEAMS
SUN Xiaoming1,2,LIU Xin1,2,LIANG Guangfeng3,WANG Dong1,2,JIANG Yulin1
(1. State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Beijing 100083,China;2. School of Mechanics and Civil Engineering,China University of Mining and Technology,Beijing 100083,China;3. Nantun Coal Mine,Yanzhou Coal Mining Group Company,Zoucheng,Shandong 273500,China)
Abstract:The key parameters in gob-side entry retaining formed by roof cutting and pressure releasing in thin coal seams at the working front 1610 in the Nantun coal mine were studied. The presplitting cutting height of roof,the presplitting cutting angle,the distance between presplitting blasting holes were determined as the key parameters based on the analysis of the stress state of roof in the process of mining. The results of numerical simulation show that,when the height of immediate roof is much higher than the height of gob and the presplitting cutting height meets the requirement of the tensile failure of immediate roof,the presplitting cutting face should deflect a certain angle towards gob in order to cut off effectively the stress transfer between the roof of gob and the roof of retaining roadway and achieve the collapsing of roof. Based on the results,the optimum distance between presplitting blasting holes was determined through field presplitting blasting test. The results have been successfully applied to an engineering project.
韩可琦,王玉浚. 中国能源消费的发展趋势与前景展望[J]. 中国矿业大学学报,2004,33(1):1-5.(HAN Keqi,WANG Yujun. Developing trend and expectation of energy consume in China[J]. Journal of China University of Mining and Technology,2004,33(1):1-5.(in Chinese))
Your browse does not support frame!