[1] 张有天,张武功. 隧洞水荷载的静力计算[J]. 水利学报,1980,(3):52–62.(ZHANG Youtian,ZHANG Wugong. The static structure calculation of water loads on hydraulic tunnel[J]. Journal of Hydraulic Engineering,1980,(3):52–62.(in Chinese))
[2] 张有天,张武功,王 镭. 再论隧洞水荷载的静力计算[J]. 水利学报,1985,3(3):22–31.(ZHANG Youtian,ZHANG Wugong,WANG Lei. The second discussion of static structure calculation of water loads on hydraulic tunnel[J]. Journal of Hydraulic Engineering,1985,3(3):22–31.(in Chinese))
[3] FERNÁNDEZ G. Behavior of pressure tunnels and guidelines for liner design[J]. Journal of Geotechnical Engineering,1994,120(10):1 768– 1 791.
[4] SCHLEISS A J. Design of reinforced concrete linings of pressure tunnels and shafts[J]. Hydropower and Dams,1997,(3):88–94.
[5] 杨林德,丁文其. 渗水高压引水隧洞衬砌的设计研究[J]. 岩石力学与工程学报,1997,16(2):112–117.(YANG Linde,DING Wenqi. A study on the design of permeable lining in high pressure water carriage tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,1997,16(2):112–117.(in Chinese))
[6] 何 明,许晓亮,韩 晶. 基于FLAC3D多孔介质模型的隧洞透水衬砌数值计算分析[J]. 水电能源科学,2014,32(5):79–82.(HE Ming,XU Xiaoliang,HAN Jing. Numerical caculation analysis of hydraulic tunnel permeable lining based on porous media model in FLAC3D[J]. Water Resources and Power,2014,32(5):79–82.(in Chinese))
[7] BOBET A,NAM S W. Stresses around pressure tunnels with semi-permeable liners[J]. Rock Mechanics and Rock Engineering,2007,40(3):287–315.
[8] SIMANJUNTAK T,MARENCE M,MYNETT A E,et al. Mechanical-hydraulic interaction in the lining cracking process of pressure tunnels[J]. The International Journal on Hydropower and Dams,2013,20:112–119.
[9] OLUMIDE B A. Numerical coupling of stress and seepage in the design of pressure tunnel under to high internal water pressure[J]. International Journal of Engineering and Technology,2013,3(3):235–244.
[10] 苏 凯,伍鹤皋,周创兵. 内水压力下水工隧洞衬砌与围岩承载特性研究[J]. 岩土力学,2010,31(8):2 407–2 412.(SU Kai,WU Hegao,ZHOU Chuangbing. Study of combined bearing characteristics of lining and surrounding rock for hydraulic tunnel under internal water pressure[J]. Rock and Soil Mechanics,2010,31(8):2 407– 2 412.(in Chinese))
[11] 葛金花,任旭华,张海波,等. 深埋隧洞透水衬砌渗控研究[J]. 水力发电,2014,40(7):39–41.(GE Jinhua,REN Xuhua,ZHANG Haibo,et al. Research on seepage control of deep-buried tunnel permeable lining[J]. Hydroelectric Power,2014,40(7):39–41.(in Chinese))
[12] 李宗利,裴向辉,吕从聪,等. 隧道透水性衬砌环渗透系数合理取值与工程措施探讨[J]. 岩土工程学报,2014,36(6):1 167–1 172. (LI Zongli,PEI Xianghui,LU Congcong,et al. Reasonable permeability coefficient and engineering measures of concrete lining circle[J]. Chinese Journal of Geotechnical Engineering,2014,36(6):1 167–1 172.(in Chinese))
[13] 郑 波,王建宇. 圆形隧道围岩与衬砌渗透力解析解[J]. 武汉理工大学学报:交通科学与工程版,2011,35(1):19–23.(ZHENG Bo,WANG Jianyu. Analytical solutions for seepage forces of circular tunnel surrounding ground and lining[J]. Journal of Wuhan University of Technology:Transportation Science and Engineering,2011,35(1):19–23.(in Chinese))
[14] 曲 星,李 宁,张志强. 围岩力学参数对水工隧洞运行期衬砌受力影响分析及工程应用[J]. 西安理工大学学报,2012,28(4):404–410.(QU Xing,LI Ning,ZHANG Zhiqiang. Influence of mechanical parameter of surrounding rocks on lining of hydraulic tunnel and its application in engineering[J]. Journal of Xi¢an University of Technology,2012,28(4):404–410.(in Chinese))
[15] 中华人民共和国行业标准编写组. DL/T5195—2004水工隧洞设计规范[S]. 北京:中国电力出版社,2004.(The Professional Standards Compilation Group of People¢s Republic of China. DL/T5195—2004 Specification for design of hydraulic tunnel[S]. Beijing:China Electric Power Press,2004.(in Chinese))
[16] 王斌会,陈一非. 基于稳健马氏距离的多元异常值检测[J]. 统计与决策,2005,(6):4–6.(WANG Binhui,CHEN Yifei. Multivariate outlier detection based on stable Mahalanobis distance[J]. Statistics and Decision,2005,(6):4–6.(in Chinese))
[17] 杨绪兵,王一雄,陈 斌. 马氏度量学习中的几个关键问题研究及几何解释[J]. 南京大学学报:自然科学版,2013,49(2):133–141.(YANG Xubing,WANG Yixiong,CHEN Bin. Research on several key problems of Mahalanobis metric learning and corresponding geometrical interpretations[J]. Journal of Nanjing University:Natural Science,2013,49(2):133–141.(in Chinese))
[18] 陈永良,路来君,李学斌. 多元地球化学异常识别的核马氏距离方法[J]. 吉林大学学报:地球科学版,2014,44(1):396–408. (CHEN Yongliang,LU Laijun,LI Xuebin. Kernel Mahalanobis distance for multivariate geochemical anomaly recognition[J]. Journal of Jilin University:Earth and Science,2014,44(1):396–408.(in Chinese))
[19] 付 力,伍剑波,王锐军,等. 马氏距离综合异常评价方法在青海省门县西河坝地区1∶5万水系沉积物测量中的运用[J]. 甘肃地质,2014,23(4):69–75.(FU Li,WU Jianbo,WANG Ruijun,et al. Application of mahalanobis distance analysis for 1∶50 000 stream sediment survey in Xiheba area,Menyuan County of Qinghai[J]. Gansu Geology,2014,23(4):69–75.(in Chinese))
[20] 邰淑彩,孙韫玉,何娟娟. 应用数理统计[M]. 武汉:武汉大学出版社,2007:160–161.(TAI Shucai,SUN Wenyu,HE Juanjuan. Applied mathematical statistics[M]. Wuhan:Wuhan University Press,2007:160–161.(in Chinese))