(1. School of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan 610031,China; 2. China Construction Underground Space Co.,Ltd.,Chengdu,Sichuan 610081,China)
Abstract:The stress of the tunnel across landslide deformation zone is very unfavorable. In order to study the stress and deformation laws of the tunnel under sliding force,firstly,the model of elastic rock-the tunnel structure is built on the basis of the interaction between tunnel and soil landslide. The matrix transfer method is adopted to establish the calculation formulas of internal force and displacement of the tunnel. Secondly,the distribution characteristics of the tunnel internal force and displacement and the influence of some important parameters are analyzed by MATLAB programming. Finally,the physical model test is carried out to verify the theoretical results. The studies indicate that,when the across segment of tunnel is long,the internal force is almost zero in a certain range of middle tunnel,and the degree of tunnel bending deformation is small,mainly presented global displacement,which is mainly controlled by the vertical foundation coefficient,the value and distribution of sliding force. The stable rock mass outside the landslide has an anchor effect on the tunnel. The force and deformation state of tunnel is the worst near the boundary of the tunnel and sliding surface,where the tunnel is most prone to failure. The results of physical model test are in good agreement with the theoretical calculation results,which verify the correctness of the theoretical calculation method and results.
JIAO Y,WANG Z,WANG X,et al. Stability assessment of an ancient landslide crossed by two coal mine tunnels[J]. Engineering Geology. 2013,159:36-44.
[2]
URCIOLIG,PICARELLI L. Interaction between landslides and man-made works[C]//Proc. of 10th Int.Symp.on Landslides,Xi¢an:[s. n.],2008:1301-1307.
[3]
ZHANG Y,YANG J,YANG F. Field investigation and numerical analysis of landslide induced by tunneling[J]. Engineering Failure Analysis,2015,47(Part A):25-33.
[4]
BANDINI A,BERRY P,BOLDINI D. Tunnelling-induced landslides:the Val di Sambro tunnel case study[J]. Engineering Geology,2015,196:71-87.
[5]
马惠民.坡体病害与隧道变形问题[J]. 岩石力学与工程学报,2003,22(增2):2719-2724.(Ma Huimin. discussion on problems of slope disaster and tunnel deformation[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(Supp.2):2719-2724.(in Chinese))
[6]
陶志平. 滑坡地段隧道变形机制及灾害预测和治理研究[博士学位论文][D]. 成都:西南交通大学,2003.(TAO Zhiping. Study on tunnel deformation mechanism at landslide site and disaster predicting and controlling[Ph. D. Thesis][D]. Chengdu:Southwest Jiaotong University,2003.(in Chinese))
[7]
毛坚强,周德培. 滑坡-隧道相互作用受力变形规律的研究[J]. 西南交通大学学报,2002,37(4):371-376.(MAO Jianqiang,ZHOU Depei. Deformation analysis for landslide-tunnel interaction[J]. Journal of Southwest Jiaotong University,2002,37(4):371-375.(in Chinese))
[8]
毛坚强,张鲁新. 滑坡隧道受力及变形规律的研究[J]. 广东公路交通,1998,54 (增1):68-71.(MAO Jianqiang,ZHANG Luxin. Research on the laws of the stress and deformation of landslide tunnel[J]. Guangdong Highway Communications,1998,54(Supp.1):68-71.(in Chinese))
[9]
牛天武. 翅膀沟隧道滑坡整治施工技术[J]. 西部探矿工程,2005, (2):189-190.(NIU Tianwu. The renovation construction technology of Chibanggou tunnel landslide[J]. West-China Exploration Engineering,2005,(2):189-190.(in Chinese))
[10]
许志樟. 漳龙高速公路某隧道右线进口滑坡加固治理[J]. 探矿工程:岩土钻掘工程,2000,(增):69-70.(XU Zhizhang. Landslide reinforcement treatment for the right entrance of a tunnel of Zhanglong highway[J]. Exploration Engineering:Rock and Soil Prilling and Tunneling,2000,(Supp.):69-70.(in Chinese))
[11]
浦玉炳,杨昌道,熊根林. 试刀山隧道洞口山体滑坡分析与治理[J]. 合肥工业大学学报:自然科学版,2002,25(4):549-553.(PU Yubing,YANG Changdao,XIONG Genlin. Analysis and control of the landslide at the mouth of Shidaoshan Tunnel[J]. Journal of Hefei University of Technology:Natural Science,2002,25(4):549-553.(in Chinese))
陶志平,周德培. 用抗滑桩整治滑坡地段隧道变形的模型试验研究[J]. 岩石力学与工程学报,2004,23(3):457-460.(TAO Zhiping,ZHOU Depei. Model testing research on controlling tunnel deformation in landslide field with anti-slide piles[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(3):457-460.(in Chinese))
[14]
邓荣贵,尹静,钟志彬,等.滑坡区隧道自锚式新型加固结构理论研究[J].岩石力学与工程学报,2015,34(7):1315-1324.(DENG Ronggui,YIN Jing,ZHONG Zhibin,etal. Theory research of the self-anchored new type reinforcement structure for the landslide tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(7):1315-1324.(in Chinese))
[15]
姜启元,管攀峰,叶 蓉. 软土盾构隧道的纵向变形分析[J].地下工程与隧道,1999,(4):2-6.(JIANG Qiyuan,GUAN Panfeng,YE Rong. Longitudinal deformation analysis of shield tunnel in soft soil[J]. Underground Engineering and Tunnels,1999,(4):2-6.(in Chinese))
[16]
吴红刚. 隧道-滑坡体系的变形机制及控制技术研究[博士学位论文][D]. 北京:中国铁道科学研究院,2012.(WU Honggang. Research on deformation mechanism and control technology of tunnel-landslide system[Ph. D. Thesis][D]. Beijing:China Academy of Railway Sciences,2012.(in Chinese))
[17]
黄宏伟,臧小龙.盾构隧道纵向变形性态研究分析[J].地下空间,2002,22(3):244-251.(HANG Hongwei,ZANG Xiaolong. Research and analysis on longitudinal deformation characteristics of shield tunnel[J]. Underground Space,2002,22(3):244-251.(in Chinese))
[18]
刘庆潭,倪国荣.弹性地基梁的传递矩阵法求解[J].长沙铁道学院学报,1992,10(2):92-102.(LIU Qingtan,NI Guorong. The solution to transfer matrix of beam on elastic foundation[J].Journal of Changsha Railway University,1992,10(2):92-102.(in Chinese))
[19]
LEE J W,LEE J Y. Free vibration analysis using the transfer-matrix method on a tapered beam[J]. Computers andStructures,2016,164:75-82.
[20]
LEE J W,LEE J Y. Development of a transfer matrix method to obtain exact solutions for the dynamic characteristics of a twisted uniform beam[J]. International Journal of Mechanical Sciences,2016,105:215-226.