FEASIBILITY ANALYSIS OF STEAM FLOODING WITH HORIZONTAL WELLS FOR EXTRA HEAVY OIL RESERVOIR
JI Youjun1,2,LIU Jianjun1,3,CHENG Linsong2
(1. School of Civil Engineering and Architecture,Southwest Petroleum University,Chengdu,Sichuan 610500,China;2. Key Laboratory of Petroleum Engineering of the Ministry of Education,China University of Petroleum,Beijing 102249,China; 3. Porous Medium Mechanical Institute,Wuhan Polytechnic University,Wuhan,Hubei 430023,China)
Abstract:On the basis of literature investigation about steamflooding,the numerical simulation method is used to optimize the injection-production parameters of steamflooding with vertical injector and horizontal producer,subsequently,the development performance of steamflooding with horizontal wells of the entire block is forecasted. The results indicate,the best production conditions are:the horizontal producer should be located closely to the bottom of the reservoir,the vertical injector should be perforated with a distance of 20%–25% thickness to the bottom,each horizontal producer should allocated with 4 injectors,the length of the horizontal well should be 300 m,the distance between horizontal wells should be 140 m. The recovery factor will be enhanced by above 12% by using steam driving with horizontal wells. The results can be employed to guide the spot execution of steamflooding with horizontal wells.
纪佑军1,2,刘建军1,3,程林松2. 超稠油油藏水平井蒸汽驱可行性分析[J]. 岩石力学与工程学报, 2013, 32(s2): 3804-3811.
JI Youjun1,2,LIU Jianjun1,3,CHENG Linsong2. FEASIBILITY ANALYSIS OF STEAM FLOODING WITH HORIZONTAL WELLS FOR EXTRA HEAVY OIL RESERVOIR. , 2013, 32(s2): 3804-3811.
张义堂,李秀峦,张 霞.稠油蒸汽驱方案设计及跟踪调整四项基本准则[J]. 石油勘探与开发,2008,35(6):715-719.(ZHANG Yitang,LI Xiuluan,ZHANG Xia. Four fundamental principles for design and follow-up of steam flooding in heavy oil reservoirs[J].Petroleum Exploration and Development,2008,35(6):715-719.(in Chinese))
[2]
苏玉亮,高海涛.稠油蒸汽驱热效率影响因素研究[J]. 断块油气田,2009,16(2):73-75.(SU Yuliang,GAO Haitao. Influencing factors of thermal efficiency during heavy oil steam drive[J].Fault-block Oil andGas Field,2009,16(2):73-75.(in Chinese))
[3]
刘学利,杜志敏,韩忠艳,等.单井蒸汽辅助重力驱启动过程动态预测模型[J]. 西南石油学院学报,2004,26(4):34-37.(LIU Xueli,DU Zhimin,HAN Zhongyan,et al. The dynamic prediction model of starting process of sw-sagd[J].Journal of Southwest Petroleum Institute,2004,26(4):34-37.(in Chinese))
[4]
刘慧卿,侯志杰,高本成,等.高3断块烟道气蒸汽混注驱替实验研究[J]. 石油勘探与开发,2001,28(5):79-81.(LIU Huiqing,HOU Zhijie,GAO Bencheng,et al. Research on mixed flooding of flue gas with steam in cores forblock Gao-3oil field[J]. Petroleum Exploration and Development,2001,28(5):79-81.(in Chinese))
[5]
于立君,岳清山. 克拉玛依油田水驱后期转蒸汽驱开发效果分析[J]. 石油大学学报:自然科学版,1999,23(1):45-48.(YU Lijun,YUE Qingshan. Conditions for steamflooding recovery of water flooding reservoir in karamay oilfield[J]. Journal of the University of PetroleumChina:Nature Science,1999,23(1):45-48.(in Chinese))
陈 杰,钱 昱,李士平. 葡南葡浅12区块蒸汽驱矿场试验研究[J]. 大庆石油地质与开发,2007,26(5):68-71.(CHEN Jie,QIAN Yu,LI Shiping. Field test research on steam flooding in Block PuQ12in south Putaohua area[J]. Daqing Petroleum Geology and Development,2007,26(5):68-71.(in Chinese))
[8]
李凤华,王 静,祁 凯,等. 气水交替驱技术在稠油油藏中的应用[J]. 石油勘探与开发,2001,28(6):80-81.(LI Fenghua,WANG Jing,QI Kai,et al. Application of WAG technology in heavy oil reservoir[J]. Petroleum Exploration and Development,2001,28(6):80-81.(in Chinese))
[9]
张义堂,计秉玉,廖广志,等. 稀油油藏注蒸汽热采提高开采效果[J]. 石油勘探与开发,2004,31(2):112-114.(ZHANGYitang,JI Bingyu,LIAO Guangzhi,et al. Enhancing development efficiency of conventional reservoir by cyclical steam stimulation[J]. Petroleum Exploration and Development,2004,31(2):112-114.(in Chinese))
沈德煌,于立君,聂凌云,等. 注水后期油藏转注蒸汽开采可行性研究[J]. 石油勘探与开发,1999,26(3):80-83.(SHEN Dehuang,YU Lijun,NIE Linyun,et al. A feasibility study of steamflooding reservoirs afterwaterflood[J]. Petroleum Exploration and Development,1999,26(3):80-83.(in Chinese))
[12]
邵先杰,汤达祯,樊中海,等. 河南油田浅薄层稠油开发技术试验研究[J]. 石油学报,2004,25(2):74-79.(SHAO Xianjie,TANG Dazhen,FAN Zhonghai,et al. Development technologies for shallow and thin heavy_oilreservoir in Henan oilfield[J]. Acta Petrolei Sinica,2004,25(2):74-79.(in Chinese))
[13]
邢景奎. 高3-4-066试验区蒸汽驱数值模拟研究[J]. 特种油气藏,2004,11(4):43-45.(XING Jingkui. Numerical simulation of steam drive in Gao3-4-066pilot area[J]. Special Oil and Gas Reservoirs,2004,11(4):43-45.(in Chinese))