[1] |
韩煊,刘赪炜,STANDING JR. 隧道下穿既有线的案例分析与沉降分析方法[J]. 土木工程学报,2012,45(1):134-141.(HAN Xuan,LIU Chengwei,STANDING JR. Structural settlement of existing tunnel caused by new tunnel excavated underneath[J]. China Civil Engineering Journal,2012,45(1):134-141.(in Chinese))
|
[2] |
张成平,张顶立,王梦恕. 大断面隧道施工引起的上覆地铁隧道结构变形分析[J].岩土工程学报,2009,35(5):805-810.(ZHANG Chengping,ZHANG Dingli,WANG Mengshu.Structural deformation of overlying subway tunnels induced by tunneling[J]. Chinese Journal of Geotechnical Engineering,2009,35(5):805-810.(in Chinese))
|
[3] |
陈孟乔,杨广武. 新建地铁车站近距离穿越既有地铁隧道的变形控制[J]. 中国铁道科学,2011,32(4):53-59.(CHEN Mengqiao,YANG Guangwu. Deformation control of a newly-built subway station crossing the adjacent existing subway tunnel[J]. China Railway Science,2011,32(4):53-59.(in Chinese))
|
[4] |
沈良帅,贺少辉.复杂环境条件上跨下穿同一既有地铁隧道的变形控制分析及施工方案优化[J].岩石力学与工程学报,2008,27(增1):2893-2900.(SHEN Liangshuai,HE Shaohui. Subsidence controlling and construction scheme optimization of cutting across and underpassing an existing metro tunnel under complex environmental conditions[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.1):2893-2900.(in Chinese))
|
[5] |
房倩,张顶立.浅埋暗挖地铁车站下穿既有线结构施工方法研究[J]. 中国铁道科学,2007,28(5):71-77.(FANG Qian,ZHANG Dingli. Study on the shallow tunnel construction methods for a new built subway station passing through the bottom of the existing subway[J]. China Railway Science,2007,28(5):71-77.(in Chinese))
|
[6] |
王占生,张顶立.浅埋暗挖隧道近距下穿既有地铁的关键技术[J]. 岩石力学与工程学报,2007,26(增2):4208-4214.(WANG Zhansheng,ZHANG Dingli. Key techniques on shallow embedded tunnel constructed beneath existing subway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):4208-4214.(in Chinese))
|
[7] |
王良. 盾构法施工在北京地铁5号线的应用[J]. 都市快轨交通,2004,17(5):33-37.(WANG Liang. Application of shield tunneling method in Beijing metro line 5[J]. Urban Rapid Rail Transit,2004,17(5):33-37.(in Chinese))
|
[8] |
BURLAND J B,STANDING J R,JARDINE F M. Building response to tunnelling,case studies from construction of the Jubilee Line extension[C]// Project and Methods. London:Thomas Telford Publishing,2001:509-545.
|
[9] |
李东海,刘军,萧岩,等.盾构隧道斜交下穿地铁车站的影响与监测研究[J].岩石力学与工程学报,2009,28(增1):3186-3192.(LI Donghai,LIU Jun,XIAO Yan,et al. Research on influence and monitoring of shield tunnel obliquely crossing beneath existing subwaystation[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):3186-3192.(in Chinese))
|
[10] |
汪 洋,何 川,曾东洋,等.盾构隧道正交下穿施工对既有隧道影响的模型试验与数值模拟[J].铁道学报,2010,32(2):79-85.(WANG Yang,HE Chuan,ZENG Dongyang,et al.Model test and numerical simulation of influence of perpendicular undercross shield tunnel construction on existing tunnel[J].Journal of the China RailwaySociety,2010,32(2):79-85.(in Chinese))
|
[11] |
胡军,杨小平,刘庭金.盾构下穿施工对既有隧道影响的数值模拟分析[J].铁道建筑,2012,(10):50-54.(HU Jun,YANG Xiaoping,LIUTingjin. Numerical simulation on influence of undercross shield tunnel construction on existing tunnel[J].Railway Engineering,2012,(10):50-54.(in Chinese))
|
[12] |
房 明,周翠英,刘 镇. 交叉隧道盾构施工参数与交叉角度对既有隧道的沉降影响研究[J].工程力学,2011,28(12):133-138.(FANG Ming,ZHOU Cuiying,LIU Zhen. Influence of construction parameters and cross angle on existing tunnel settlement during undercrossing shield tunneling construction[J]. Engineering Mechanics,2011,28(12):133-138.(in Chinese))
|
[13] |
刘波,陶龙光,丁城刚,等.地铁双隧道施工诱发地表沉降预测研究与应用[J].中国矿业大学学报,2006,35(3):356-361.(LIU Bo,TAO Longguang,DING Chenggang,et al. Prediction for ground subsidence induced by subway double tube tunneling[J].Journal of China University of Mining andTechnology,2006,35(3):356-361.(in Chinese))
|
[14] |
PECK R B. Deep Excavation and tunneling in soft ground[C]//State of the Art Report,7thInternational Conference on Soil Mechanics and Foundation Engineering. Mexico:[s.n.],1969:225-290.
|
[15] |
ATTEWELL P B. Engineering contract,site investigation and surface movements in tunneling works[C]//Balkema A Aed. Soft Ground Tunneling-Failures and Displacement.Rotterdam:[s.n.],1981:5-12.
|
[16] |
MAIR R J. Ground movement around shallow tunnels in soft clay[J]. Tunnels and Tunneling,1982,(6):33-38.
|
[17] |
YOSHIKOSHI W,WATANABE O,TAKAGI N. Prediction of ground settlements associated with shield tunneling[J]. Soils and Foundations,1978,18(4):47-59.
|
[18] |
NEW B M,O¢REILLY M P. Tunneling induced ground moments:predicting their magnitude and effects[C]//Proceedings of the International Conference on Ground Movements and Structures. Cardiff:Wales,1991:671-697.
|
[19] |
李倩倩,张顶立,张成平.不同埋深下暗挖隧道施工的地层响应[J].北京交通大学学报,2013,37(1):27-33.(LI Qianqian,ZHANG Dingli,ZHANG Chengping. Study on ground response caused by undercutting subway tunnel under different overburden depths[J].Journalof Beijing Jiaotong University,2013,37(1):27-33.(in Chinese))
|
[20] |
韩煊,李宁,STANDING J R. Peck公式在我国隧道施工地面变形预测中的适用性分析[J].岩土力学,2007,28(1):23-35.(HAN Xuan,LI Ning,STANDING J R. An adaptability study of Gaussian equation applied to predicting ground settlements induced by tunneling in China[J]. Rock and Soil Mechanics,2007,28(1):23-35.(in Chinese))
|
[21] |
姜忻良,赵志民,李 圆. 隧道开挖引起土层沉降槽曲线形态的分析与计算[J]. 岩土力学,2004,25(10):1 542-1 544.(JIANG Xinliang,ZHAO Zhimin,LI Yuan. Analysis and calculation of surface and subsurfacesettlement trough profiles due to tunneling[J].Rock and Soil Mechanics,2004,25(10):1 542-1 544.(in Chinese))
|