Abstract:The engineering scale of tailrace system at Xiangjiaba right-bank underground powerhouse is very huge. Restricted by the terrain and geological conditions,the design and construction face lots of difficult technological problems. According to this actual situation and by means of numerical calculation and physical model test,some advanced design plans such as tailrace tunnel with the ceiling height change and 2 adits merged to 1 tunnel,are adopted;and some special construction plans such as top arch lining first,then excavation down,and small holes in large holes,are adopted. Safety monitoring guides construction to ensure the safety of engineering. Deformation of surrounding rock gradually inclines to be stable after excavation. The maximum measured deformation at top arch is 13.25 mm,close to the theory value of 15.72 mm. The comparative result shows that the design parameters of excavation and support are reasonable;and the sequence and method of construction are successful.
[1] 中南勘测设计研究院,金沙江向家坝水电站右岸地下引水发电系统土建及金属结构安装施工招标文件[R]. 长沙:中南勘测设计研究院,2005.(HydroChina Zhongnan Engineering Corporation. Bidding documents of civil engineering construction of underground water division power generation system and metal material installment at right bank of Xiangjiaba hydropower station,Jinsha river[R]. Changsha:HydroChina Zhongnan Engineering Corporation,2005.(in Chinese))
[2] 中南勘测设计研究院. 金沙江向家坝水电站可行性研究报告[R]. 长沙:中南勘测设计研究院,2003.(HydroChina Zhongnan Engineering Corporation. Feasibility study report of Xiangjiaba hydropower station,Jinsha river[R]. Changsha:HydroChina Zhongnan Engineering Corporation,2003.(in Chinese))
[3] 杨建东,陈鉴治,陈文斌,等. 水电站变顶高尾水洞体型研究[J]. 水利学报,1998,(3):9.(YANG Jiandong,CHEN Jianzhi,CHEN Wenbin,et al. Study on the configuration of hydropower station tailrace tunnel with sloping ceiling[J]. Journal of Hydraulic Engineering,1998,(3):9.(in Chinese))
[4] 辜晓原,李佛炎,禹芝文. 向家坝水电站地下厂房变顶高尾水系统研究[J]. 水力发电,2004,30(6):23–26.(GU Xiaoyuan,LI Foyan,YU Zhiwen. Study on the tailrace system with the ceiling height changes of underground powerhouse of Xiangjiaba hydropower station[J]. Water Power,2004,30(6):23–26.(in Chinese))
[5] 易 志,钟光德,向家坝工程右岸地下电站无盖重固结灌浆可行性研究[C]// 中国三峡2010年增刊论文集. 宜昌:[s. n.],2010:71–73.(YI Zhi,ZHONG Guangde. Feasibility research on consolidation grouting without cap weight at right-bank of Xiangjiaba underground powerhouse[C]// Proceedings of China Three Gorges Supplement. Yichang:[s. n.],2010:71–73.(in Chinese))
[6] 尹 强,杨建军. 向家坝电站地下厂房系统洞室开挖方法[J]. 四川水力发电,2009,28(4):1–6.(YIN Qiang,YANG Jianjun. Cavern excavation method for underground powerhouse system at Xiangjiaba hydropower station[J]. Sichuan Water Power,2009,28(4):1–6.(in Chinese))
[7] 黄秋香,邓建辉,苏鹏云,等. 瀑布沟水电站地下厂房洞室群施工期围岩位移特征分析[J]. 岩石力学与工程学报,2011,30(增1): 3 032–3 042.(HUANG Qiuxiang,DENG Jianhui,SU Pengyun,et al. Displacement characteristics analysis of surrounding rock in underground powerhouse chambers at Pubugou hydropower station during construction[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1):3 032–3 042.(in Chinese))
[8] 董志宏,丁秀丽,卢 波,等. 大型地下洞室考虑开挖卸荷效应的位移反分析[J]. 岩土力学,2008,29(6):1 562–1 568.(DONG Zhihong,DING Xiuli,LU Bo,et al. Displacement back analysis of large-scale underground powerhouse considering excavation effect[J]. Rock and Soil Mechanics,2008,29(6):1 562–1 568.(in Chinese))
[9] 樊启祥,刘益勇,王 毅. 向家坝水电站大型地下厂房洞室群施工和监测[J]. 岩石力学与工程学报,2011,30(4):666–676.(FAN Qixiang,LIU Yiyong,WANG Yi. Construction and monitoring study of large underground powerhouse caverns of Xiangjiaba hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(4):666–676.(in Chinese))
[10] 刘 文. 变顶高尾水隧洞施工技术研究及应用[J]. 云南水力发电,2011,27(2):51–54.(LIU Wen. Research and application of construction technology of tailrace tunnel with ceiling height changes[J]. Yunnan Water Power,2011,27(2):51–54.(in Chinese))
[11] 李洪涛,舒大强. 爆破震动衰减规律的影响因素[J]. 武汉大学学报:工学版,2005,38(1):79–82.(LI Hongtao,SHU Daqiang. Influential factors analysis of blasting vibration attenuation law[J]. Engineering Journal of Wuhan University,2005,38(1):79–82.(in Chinese))
[12] 易 志,唐春满. 向家坝工程右岸地下电站尾水管扩散段开挖方案[J]. 水力发电,2010,36(4):50–53(YI Zhi,TANG Chunman. Draft tube diffuser excavation at right bank of Xiangjiaba underground power station[J]. Water Power,2010,36(4):50–53.(in Chinese))