[1] 郑 治,吴正新,陈思聪,等.导流洞工程事故分析与防治[J].贵州水力发电,2011,25(4):6–12.(ZHENG Zhi,WU Zhengxin,CHEN Sicong,et al. Analysis and prevention of the diversion tunnel engineering accident[J]. Guizhou Water Power,2011,25(4):6–12.(in Chinese))
[2] 陈玉奇. 索风营水电站导流洞S63岩溶管道封堵处理[J]. 贵州水力发电,2003,17(2):42–45.(CHEN Yuqi. Blocking treatment of karst tube S63 of Suofengying Hydropower Station[J]. Guizhou Water Power,2003,17(2):42–45.(in Chinese))
[3] 叶三元,刘永红. 特殊条件下透水通道堵漏抢险施工技术[J].人民长江,2010,41(22):52–55.(YE Sanyuan,LIU Yonghong. Leakage treatment technology of pervious tunnel under special conditions[J]. Yangtze River,2010,41(22):52–55.(in Chinese))
[4] 张海超,吴元东. 沙沱水电站大坝基础矩阵式喀斯特渗漏通道堵漏实践[J]. 贵州水力发电,2009,23(4):24–27.(ZHANG Haichao,WU Yuandong. Caulking practice of matrix karst seepage channels of dam foundation of Shatuo Hydropower Station[J]. Guizhou Water Power,2009,23(4):24–27.(in Chinese))
[5] LI X P,LI Y N. Research on risk assessment system for water inrush in the karst tunnel construction based on GIS:Case study on the diversion tunnel groups of the Jinping II Hydropower Station[J]. Tunnelling and Underground Space Technology,2014,40(2):182–191.
[6] WANG Y,DU W,XU B,et al. Numerical simulation of hydrodynam- ic characteristics during the diversion closure in a horizontal tunnel[J]. International Journal of Mining Science and Technology,2013,23(3):363–367.
[7] 李术才,张 霄,张庆松,等. 地下工程涌突水注浆止水浆液扩散机制和封堵方法研究[J]. 岩石力学与工程学报,2011,30(12):2 377–2 396.(LI Shucai,ZHANG Xiao,ZHANG Qingsong. Research on mechanism of grout diffusion of dynamic grouting and plugging method in water inrush of underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(12):2 377–2 396.(in Chinese))
[8] 张 霄,李术才,张庆松,等. 关键孔注浆方法在高压裂隙水封堵中的应用研究[J].岩石力学与工程学报,2011,30(7):1 414–1 421. (ZHANG Xiao,LI Shucai,ZHANG Qingsong,et al. Study of key-hole grouting method to harness high pressure water gushing in fractured rock mass[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(7):1 414–1 421.(in Chinese))
[9] 张 正,王 涛,郑 江,等. 某隧道工作井深基坑渗漏及堵漏处理技术[J]. 岩土工程学报,2010,32(增1):353–357.(ZHANG Zheng,WANG Tao,ZHENG Jiang,et al. Leakage and treatment technology for a foundation pit of tunnel working well[J]. Chinese Journal of Geotechnical Engineering,2010,32(Supp.1):353–357.(in Chinese))
[10] 唐爱松,韩 军,夏熙伦. 不良地质隧洞开挖的止水加固技术[J].岩石力学与工程学报,2002,21(7):1 064–1 067.(TANG Aisong, HAN Jun,XIA Xilun. Water stop and reinforcing technique for tunneling through bad geological region[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(7):1 064–1 067.(in Chinese))
[11] 汤德刚. 灌浆技术在涌水溶洞处理中的应用[J]. 岩石力学与工程学报,2006,25(增2):3 583–3 586.(TANG Degang. Application of grouting technique to treatment of limestone cave surge[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2): 3 583–3 586.(in Chinese))
[12] 周喜德. 大流量高流速溶洞堵漏技术的研究[J]. 地球与环境,2005,33(3):54–62.(ZHOU Xide. Research on the technique of blocking water loss in large-discharge and high flow-rate karst caves[J]. Earth and Environment,2005,33(3):54–62.(in Chinese))
[13] 程永辉,饶锡保,周小文. 散粒料水下抛填堰体密度的离心模型试验研究[J]. 长江科学院院报,2013,30(10):42–47.(CHENG Yonghui, RAO Xibao,ZHOU Xiaowen,et al. Centrifugal model tests on the density of cofferdam formed by underwater granular material packing[J]. Journal of Yangtze River Scientific Research Institute,2013,30(10):42–47.(in Chinese))
[14] 黄晚清,陆 阳. 散粒体重力堆积的三维离散元模拟[J].岩土工程学报,2006,28(12):2 139–2 143.(HUANG Wanqing,LU Yang. 3D DEM simulation of random packing of particulates under gravity[J]. Chinese Journal of Geotechnical Engineering,2006,28(12):2 139–2 143.(in Chinese))
[15] 李思慎,徐隆庆,伍碧秀. 深水抛填土的抗渗强度研究[J]. 水利学报,1984,(3):54–60.(LI Sishen,XU Longqing,WU Bixiu. The research on the anti-permeability strength of fill in deep water[J]. Journal of Hydraulic Engineering,1984,(3):54–60.(in Chinese))