(1. State Key Laboratory of Hydraulics and Mountain River Engineering,College of Water Resource and Hydropower,Sichuan University,Chengdu,Sichuan 610065,China;2. State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering,Nanjing Hydraulic Research Institute,Nanjing,Jiangsu 210029;3. College of Civil Engineering, Shandong Univeristy,Ji?nan,Shandong 250061,China;4. PowerChina,Chengdu Engineering Corporation Ltd.,Chengdu,Sichuan 610072,China;
5. School of Civil Engineering,Dalian University of Technology,Dalian,Liaoning 116024,China)
Abstract:The stability of high rock slope is one of the important issues during the construction of hydropower station. The stability of the left bank slope at Jinping I hydropower station was the key issue due to its high geo-stress,developed faults and fissures,large-scale excavation,deep unloading and complicated geological conditions. The characteristics of the microseismic activity of the left bank slope were introduced firstly. Analyses of the temporal and spatial distributions of the microseismic activity in the processes of excavation-induced unloading and under the excavation conditions during the different periods and in the different regions were conducted. The correlation among the initiation,propagation,extension and coalescence of micro-fractures of rock and the rock mass damage were discussed. The correlation between the microseismic activity and the construction response at the left bank slope was also obtained. The results showed that the microseismic activity induced by the unloading relaxation of the deep rock mass as results of the excavation of the foundation pit of dam,the X shafts for lamprophyre vein replacement and the drainage tunnels at the elevation of 1670 m and the consolidation grouting of weak layers inside the rock slope reflected in real time the construction conditions on site very well.
徐奴文1,2,3,李术才3,戴 峰1,周 钟4,沙 椿4,唐春安5. 岩质边坡微震活动特征及其施工响应分析[J]. 岩石力学与工程学报, 2015, 34(05): 968-978.
XU Nuwen1,2,3,LI Shucai3,DAI Feng1,ZHOU Zhong4,SHA Chun4,TANG Chun?an5. ANALYSIS ON CHARACTERISTICS OF MICROSEISMIC ACTIVITY AND ITS RESPONSE TO CONSTRUCTION AT ROCK SLOPE. , 2015, 34(05): 968-978.
宋胜武,向柏宇,杨静熙,等. 锦屏一级水电站复杂地质条件下坝肩高陡边坡稳定性分析及其加固设计[J]. 岩石力学与工程学报,2010,29(3):442-458.(SONG Shengwu,XIANG Baiyu,YANG Jingxi et al. Stability analysis and reinforcement design of high and steep slopes with complex geology in abutment of Jingping I Hydropower Station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(3):442-458.(in Chinese))
[2]
周 钟,巩满福,雷承第. 锦屏一级水电站左坝肩边坡稳定性研究[J]. 岩石力学与工程学报,2006,25(11):2 298-2 304. (ZHOU Zhong,GONG Manfu,LEI Chengdi. Research on slope stability at left abutment of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2 298-2 304.(in Chinese))
[3]
中国水电工程顾问集团成都勘测设计研究院. 雅砻江锦屏一级水电站可行性研究报告(3):工程地质[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2004.(HydroChina Chengdu Engineering Corporation. Feasibility study report of Jinping I hydropower station located on Yalong river,part III:Engineering geology[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2004.(in Chinese))