Abstract:Construction of crossing tunnels underground in urban area inevitably disturbs the surrounding ground,posing a series of problems on the environment,especially for the old Beijing city. In the construction of Subway Line 6 in Beijing,two tunnels cross each other one over the other in the section between Beihai north to Luoguxiang south,which is a first case of underground tunnel crossing in Beijing. Numerical simulation and field measurement were adopted to study the surface deformation characteristics of five typical sections under different excavation sequences,layouts and grouting methods. The maximum ground surface settlement and the width of settlement trough were smaller and the tunnels were more stable in the case of the lower tunnel excavated first than the ones the upper tunnel excavated first. The surface deformation was found to increase notably with the increase of the crossing angle of two tunnels. When the crossing angle was greater than 60 degrees,the maximum value of ground surface settlement exceeded 30 mm which was above the control standard. The stratum needed to be strengthened through grouting in this case. The maximum settlements at ground surface and tunnel crown decreased with the increase of the thickness of grouted layers. Having considered the economic costs and the unfavorable effects of grouting pressure,the thickness of grouted layers was suggested to be 1.5–2.0 m. The monitored field data showed that the ground surface settlements after grouting met the requirement of control standards and the grouting was an effective method to reduce the ground surface settlement and the width of settlement trough.
张顶立,黄 俊. 深圳地铁浅埋暗挖隧道地层变形分析[J]. 中国矿业大学学报,2004,33(5):88-93.(ZHANG Dingli,HUANG Jun. Analysis of ground deformation for shallow tunnel in Shenzhen City[J]. Journal of China University of Mining and Technology,2004,33(5):88-93.(in Chinese))
[2]
章慧健,仇文革,冯冀蒙. 小净距隧道夹岩力学特征分析[J]. 岩土工程学报,2010,32(3):434-439.(ZHANG Huijian,QIU Wenge,FENG Jimeng. Mechanical performance of shared rock of neighborhood tunnels[J]. Chinese Journal of Geotechnical Engineering,2010,32(3):434-439.(in Chinese))
[3]
王明年,张晓军,苟明中,等. 盾构隧道掘进全过程三维模拟方法及重叠段近接分区研究[J]. 岩土力学,2012,33(1):273-279. (WANG Mingnian,ZHANG Xiaojun,GOU Mingzhong,et al. Method of three-dimensional simulation for shield tunneling process and study of adjacent partition of overlapped segment[J]. Rock and Soil Mechanics,2012,33(1):273-279.(in Chinese))
[4]
孙 钧,刘洪洲. 交叠隧道盾构法施工土体变形的三维数值模拟[J]. 同济大学学报:自然科学版,2002,30(4):379-385.(SUN Jun,LIU Hongzhou. 3D numerical simulation of ground surface settlement under overlapped shield tunneling[J]. Journal of Tongji University:Natural Science,2002,30(4):379-385.(in Chinese))