CONTROL AND MONITORING OF ROCK MASS ENGINEERING OF SUPER LARGE UNDERGROUND POWERHOUSE CAVERN GROUPS AT XILUODU HYDROPOWER STATION
LI Jinhe1,WU Wenfeng2,LI Jianchuan2
(1. Engineering Construction Department of Xiluodu Hydropower Station,China Three Gorges Corporation,Yichang,Hubei
443002,China;2. Yangtze River Spatial Information Technology Engineering Limited,Wuhan,Hubei 430010,China)
Abstract:The underground powerhouse cavern groups at Xiluodu hydropower station in Jinsha river has huge scale and complex structure. The discontinuity of rock mass induced by the disturbed belts between bedding and inner bedding is the main geologic problem. The elastoplastic damage theory is used to analyze the stability of surrounding rock;and the excavation sequence and supporting parameters for underground caverns are determined. Based on meticulous construction organization,the extent of damage to surrounding rock is strictly controlled to ensure good forming of caverns outline. Real-time analysis and inversion analysis of monitoring data are conducted;and the dynamic design for supporting workload is needed. In the process of excavation,the displacement and stress have a good change regularity. After excavation,the measured values of displacement and stress is relatively small;and the surrounding rock of underground powerhouse caverns has a good stability. The scale of underground powerhouse caverns at Xiluodu hydropower station tops the list in China. The summary from control measures for rock mass engineering such as design,excavation and support,monitoring data analysis and inversion analysis,can provide some references for the similar projects.
李金河1,伍文锋2,李建川2. 溪洛渡水电站超大型地下厂房洞室群岩体工程控制与监测[J]. 岩石力学与工程学报, 2013, 32(1): 8-14.
LI Jinhe1,WU Wenfeng2,LI Jianchuan2. CONTROL AND MONITORING OF ROCK MASS ENGINEERING OF SUPER LARGE UNDERGROUND POWERHOUSE CAVERN GROUPS AT XILUODU HYDROPOWER STATION. , 2013, 32(1): 8-14.
[1] 中国水电工程顾问集团成都勘测设计研究院. 金沙江溪洛渡水电站地下厂房洞室围岩稳定与支护设计专题报告[R]. 成都:中国水电顾问集团成都勘测设计研究院,2004.(HydroChina Chengdu Engineering Corporation. Special report of stability of surrounding rock of Xiluodu underground power plant cavern and supporting design[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2004.(in Chinese))
[2] 伍文锋,税思梅. 溪洛渡地下厂房三大洞室围岩稳定监控技术[J].人民长江,2011,42(增2):98–100.(WU Wenfeng,SHUI Simei. Monitoring technology for stability of surrounding rock mass of three caverns of underground powerhouse of Xiluodu hydropower station[J]. Yangtze River,2011,42(Supp.2):98–100.(in Chinese))
[3] 樊启祥,刘益勇,王 毅. 向家坝水电站大型地下厂房洞室群施工和监测[J]. 岩石力学与工程学报,2011,30(4):666–676.(FAN Qixiang,LIU Yiyong,WANG Yi. Construction and monitoring study of large underground powerhouse caverns of Xiangjiaba hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(4):666–676.(in Chinese) )
[4] 漆爱捺. 三峡电源电站地下厂房开挖施工技术[J]. 水利水电快报,2005,26(15):12–14.(QI Aina. Excavation of underground powerhouse for electrical source and power supply for the Three Gorges[J]. Express Water Resources and Hydropower Information,2005,26(15):12–14.(in Chinese))
[5] 刘燕波,陈敦科,尹俊宏. 三峡工程地下电站岩锚梁岩台开挖技术研究[J]. 水利水电快报,2006,27(20):16–18.(LIU Yanbo,CHEN Dunke,YIN Junhong. Excavation of rock bench for rock-anchorage beam of underground power station of Three Gorges Project[J]. Express Water Resources and Hydropower Information,2006,27(20):16–18.(in Chinese))
[6] 李友华,黄应军,李景元. 溪洛渡水电站左岸地下厂房大跨度高边墙开挖施工技术[J]. 水力发电,2008,34(9):9–11.(LI Youhua,HUANG Yingjun,LI Jingyuan. Excavation techniques of large span and high sidewall of left-bank underground powerhouse of Xiluodu hydropower station[J]. Water Power,2008,34(9):9–11.(in Chinese))
[7] 樊启祥,王义锋. 溪洛渡水电站地下厂房岩体工程实践[J]. 岩石力学与工程学报,2011,30(增1):2 986–2 993.(FAN Qixiang,WANG Yifeng. A case study of rock mass of underground powerhouse at Xiluodu hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1):2 986–2 993.(in Chinese))
[8] 孙开畅,孙志禹. 向家坝水电站地下厂房洞室群围岩稳定分析[J].长江科学院院报,2006,23(5):29–32.(SUN Kaichang,SUN Zhiyu. Stability analysis of surrounding rock of underground powerhouses of Xiangjiaba hydropower station[J]. Journal of Yangtze River Scientific Research Institute,2006,23(5):29–32.(in Chinese))