[1] 冯夏庭,江 权,苏国韶. 高应力下硬岩地下工程的稳定性智能分析与动态优化[J]. 岩石力学与工程学报,2008,27(7):1 341–1 352. (FENG Xiating,JIANG Quan,SU Guoshao. Integrated intelligent stability analysis and dynamic optimization of underground engineering in hard rock with high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 341–1 352.(in Chinese))
[2] 张 勇,肖平西,程丽娟. 基于岩石强度应力比的大型地下洞室群布置设计方法[J]. 岩石力学与工程学报,2014,33(11):2 314–2 331. (ZHANG Yong,XIAO Pingxi,CHENG Lijuan. Method of layout design based on ratio of rock strength to in-situ stress for large underground caverns[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(11):2 314–2 331.(in Chinese))
[3] 董家兴,徐光黎,李志鹏,等. 高地应力条件下大型地下洞室群围岩失稳模式分类及调控对策[J]. 岩石力学与工程学报,2014,33(11):2 161–2 170.(DONG Jiaxing,XU Guangli,LI Zhipeng,et al. Classification of failure modes and controlling measures for surrounding rock of large-scale cavers with high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(11):2 161–2 170.(in Chinese))
[4] 李仲奎,卢达溶,中山元,等. 三维模型试验新技术及其在大型地下洞群研究中的应用[J]. 岩石力学与工程学报,2003,22(9):1 430–1 436.(LI Zhongkui,LU Darong,ZHONG Shanyuan,et al. Development and application of new technology for 3D geo- mechanics model test of large underground houses[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(9):1 430–1 436.(in Chinese))
[5] ZHU W S,LI Y,LI S C,et al. Quasi-three-dimensional physical model tests on a cavern complex under high in-situ stresses[J]. International Journal of Rock Mechanics and Mining Sciences,2011,48(2):199–209.
[6] BAUCH E,LEMPP C. Rock splitting in the surrounds of underground openings:an experimental approach using triaxial extension tests[C]// HACK R,AZZAM R,CHARLIER R,ed. Engineering Geology for Infrastructure Planning in Europe. Berlin:Springer-Verlag,2004:244–254.
[7] 黄润秋,黄 达,段绍辉,等. 锦屏I级水电站地下厂房施工期围岩变形开裂特征及地质力学机制研究[J]. 岩石力学与工程学报,2011,30(1):23–35.(HUANG Runqiu,HUANG Da,DUAN Shaohui,et al. Geomechanics mechanism and characteristics of surrounding rock mass deformation failure in construction phase for underground powerhouse of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(1):23–35.(in Chinese))
[8] 李 宁,孙宏超,姚显春,等. 地下厂房母线洞环向裂缝成因分析及处理措施[J]. 岩石力学与工程学报,2008,27(3):439–446.(LI Ning,SUN Hongchao,YAO Xianchun,et al. Cause analysis of circumferential splits in surrounding rock of busbar tunnels in underground powerhouse and reinforced measures[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(3):439–446.(in Chinese))
[9] 李仲奎,周 钟,汤雪峰,等. 锦屏一级水电站地下厂房洞室群稳定性分析与思考[J]. 岩石力学与工程学报,2009,28(11):2 167–2 175.(LI Zhongkui,ZHOU Zhong,TANG Xuefeng,et al. Stability analysis and considerations of underground powerhouse caverns group of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(11):2 167–2 175.(in Chinese))
[10] ZHU W S,LI X J,ZHANG Q B,et al. A study on sidewall displacement prediction and stability evaluations for large underground power station caverns[J]. International Journal of Rock Mechanics and Mining Sciences,2010,47(7):1 055–1 062.
[11] 樊启祥,王义锋. 溪洛渡水电站地下厂房岩体工程实践[J]. 岩石力学与工程学报,2011,30(增1):2 986–2 994.(FAN Qixiang,WANG Yifeng. A case study of rock mass engineering of underground powerhouse at Xiluodu hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1):2 986–2 994. (in Chinese))
[12] CAI M,KAISER PK,MORIOKA H,et al. FLAC/PFC coupled numerical simulation of AE in large-scale underground excavations [J]. International Journal of Rock Mechanics and Mining Sciences,2007,44(4):550–564.
[13] 朱泽奇,盛 谦,张勇慧,等. 大岗山水电站地下厂房洞室群围岩开挖损伤区研究[J]. 岩石力学与工程学报,2013,32(4):734–739. (ZHU Zeqi,SHENG Qian,ZHANG Yonghui,et al. Research on excavation damage zone of underground powerhouse of Dagangshan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(4):734–739.(in Chinese))
[14] 朱维申,杨为民,项 吕,等. 大型洞室边墙松弛劈裂区的室内和现场研究及反馈分析[J]. 岩石力学与工程学报,2011,30(7):1 310– 1 317.(ZHU Weishen,YANG Weiming,XIANG Lu,et al. Laboratory and field study of splitting failure on side wall of large-scale cavern and feedback analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(7):1 310–1 317.(in Chinese))
[15] 江 权,冯夏庭,苏国韶,等. 高地应力下拉西瓦水电站地下洞室群稳定性分析[J]. 水力发电学报,2010,29(5):132–140.(JIANG Quan,FENG Xiating,SU Guoshao,et al. Stability analysis of large underground caverns in Laxiwa hydropower plant under high crustal stress[J]. Journal of Hydroelectric Engineering,2010,29(5):132–140.(in Chinese))
[16] 张建海,胡著秀,杨永涛,等. 地下厂房围岩松动圈声波拟合及监测反馈分析[J]. 岩石力学与工程学报,2011,30(6):1 191–1 197. (ZHANG Jianhai,HU Zhuxiu,YANG Yongtao,et al. Acoustic velocity fitting and monitoring feedback analysis of surrounding rock loosing zone in underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(6):1 191–1 197.(in Chinese))
[17] 程丽娟,李治国,王金生,等. 四川省大渡河猴子岩水电站地下厂房主洞室围岩加强支护措施设计报告[R]. 成都:中国水电顾问集团成都勘测设计研究院有限公司,2014.(CHENG Lijuan,LI Zhiguo,WANG Jinsheng,et al. Design report on reinforcement measures for surrounding rock mass in underground group caverns of Houziyan hydropower station along Dadu River,Sichuan Province[R]. Chengdu:HydroChina Chengdu Engineering Corporation,2014.(in Chinese))
[18] 董家兴,徐光黎,李志鹏,等. 高地应力条件下大型地下洞室群围岩失稳模式分类及调控对策[J]. 岩石力学与工程学报,2014,33(11):2 161–2 170.(DONG Jiaxing,XU Guangli,LI Zhipeng,et al. Classification of failure modes and controlling measures for surrounding rock of large-scale cavers with high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(11):2 161–2 170.(in Chinese))
[19] 李志鹏,徐光黎,董家兴,等. 猴子岩水电站地下厂房洞室群施工期围岩变形与破坏特征[J]. 岩石力学与工程学报,2014,33(11): 2 191–2 200.(LI Zhipeng,XU Guangli,DONG Jiaxing,et al. Deformation and fracture of surrounding rock mass of underground caverns at Houziyan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(11):2 191–2 200.(in Chinese))
[20] 李 彪,戴 峰,徐奴文,等. 深埋地下厂房微震监测系统及其工程应用[J]. 岩石力学与工程学报,2014,33(增1):3 375–3 384.(LI Biao,DAI Feng,XU Nuwen,et al. Microseismic monitoring system and its engineering applications of deep-buried underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):3 375–3 384.(in Chinese))
[21] 戴 峰,李 彪,徐奴文,等. 猴子岩水电站深埋地下厂房开挖损伤区特征分析[J]. 岩石力学与工程学报,2015,34(4):735–746. (DAI Feng,LI Biao,XU Nuwen,et al. Excavation damaged zones characteristics analysis in deep-buried underground powerhouse of Houziyan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(4):735–746.(in Chinese))
[22] BLAKE W,HEDLEY D G F. Rockbursts:Case studies from North American hardrock mines[M]. [S. l.]:Littleton,Colorado:Society for Mining,Metallurgy and Exploration Inc.,2003:19–28.
[23] McKinnon S D. Triggering of seismicity remote from active mining excavations[J]. Rock Mechanics and Rock Engineering,2006,39(3):255–279.
[24] Hudyma M R. Analysis and interpretation of clusters of seismic events in mines[Ph. D. Thesis][D]. Perth,Australia:University of Western Australia,2008.
[25] Hudyma M R,POTVIN Y H. An engineering approach to seismic risk management in hardrock mines[J]. Rock Mechanics and Rock Engineering,2010,43(6):891–906.
[26] Reimnitz M. Shear-slip induced seismic activity in underground mines:a case study in Western Australia[M. S. Thesis][D]. Australia:Department of Civil and Resource Engineering,University of Western Australia,2004.
[27] 徐奴文. 高陡岩质边坡微震监测与稳定性分析研究[博士学位论文][D].大连:大连理工大学,2011.(XU Nuwen. Study on microseismic monitoring and stability analysis of high steep rock slope[Ph. D. Thesis][D]. Dalian:Dalian University of Technology,2011.(in Chinese))
[28] XU N W,TANG C A,LI H,et al. Excavation-induced micro seismicity:microseismic monitoring and numerical simulation[J]. Journal of Zhejiang University-SCIENCE A:Applied Physics and Engineering,2012,13(6):445–460.
[29] XU N W,DAI F,LIANG Z Z,et al. The dynamic evaluation of rock slope stability considering the effects of microseismic damage[J]. Rock Mechanics and Rock Engineering,2014,47(2):621–642.
[30] TANG C A. Numerical simulation on progressive failure leading to collapse and associated seismicity[J]. International Journal of Rock Mechanics and Mining Sciences,1997,34(2):249–261.
[31] 梁正召,唐春安,张永彬,等. 岩石三维破裂过程的数值模拟研究[J]. 岩石力学与工程学报,2006,25(5):931–936.(LIANG Zhengzhao,TANG Chun¢an,ZHANG Yongbin,et al. 3D numerical simulation of failure process of rock[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(5):931–936.(in Chinese))
[32] 李连崇,唐春安,梁正召. 考虑岩体碎胀效应的采场覆岩冒落规律分析[J]. 岩土力学,2010,31(11):3 537–3 542.(LI Lianchong,TANG Chun¢an,LIANG Zhengzhao. Investigation on overburden strata collapse around coal face considering effect of broken expansion of rock [J]. Rock and Soil Mechanics,2010,31(11):3 537–3 542.(in Chinese))
[33] 唐春安. 岩石声发射规律数值模拟初探[J]. 岩石力学与工程学报,1997,16(4):368–374.(TANG Chun¢an. Numerical simulation of AE in rock failure[J]. Chinese Journal of Rock Mechanics and Engineering,1997,16(4):368–374.(in Chinese))
[34] 徐奴文,唐春安,沙 椿,等. 锦屏I级水电站左岸边坡微震监测系统及其应用研究[J]. 岩石力学与工程学报,2010,29(5):915–925.(XU Nuwen,TANG Chun¢an,SHA Chun,et al. Microseismic monitoring system establishment and its engineering applications to left bank slope of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(5):915–925.(in Chinese))