EXPERIMENTAL STUDY OF DECREASING VIBRATION TECHNOLOGY OF TUNNEL BLASTING WITH DIGITAL DETONATOR
FU Hongxian1,SHEN Zhou2,ZHAO Yong3,WANG Shuqiang4,TANG Yong2, YAN Xiucheng2,CHENG Longxian2
(1. Tunnel and Underground Engineering Research Center of Ministry of Education,Beijing Jiaotong University,Beijing 100044,China;2. China Railway 10 th Co.,Ltd.,Jinan,Shandong 250101,China;3. Appraisal Center of Engineering Design,Ministry of Railways,Beijing 100844,China;4. Chengdu Railway Bureau,Ministry of Railways,Chengdu,Sichuan 610082,China)
Abstract:Digital detonator?s delay time is arbitrarily set up according to field requirement and its delay time is very accurate. Digital detonator is one of the most advanced detonators,and is leading the revolution of blasting technology. Several experiments of building tunnels with digital detonator blasting are tried out in Renhechang tunnel of Lanzhou—Chongqing railway,decreasing blasting vibration mechanism with digital detonator is studied. The optimal delay time of blast hole of tunnel is gained;technology of tunnel digital detonator blasting one by one hole is put forward,the blasting vibration is decreased at least 80% in the same blasting advance with detonator blasting with shock-conducting tube,and at least 50% at increasing 25% of blasting advance. Several mixed networks of digital detonator and detonator with shock-conducting tube are tried in order to reduce the blasting cost of tunnel. The optimal joint technology is put forward,the blasting vibration is decreased at least 40% at increasing 25% of blasting advance. The interval between blasting hole delay time greatly affect the result of tunnel blasting,the longer interval between blasting hole delay time result in shorter blasting advance of tunnel and bad fragment,the shorter interval result does not decrease blasting vibration,sometimes increases blasting vibration. The experimental results settle the problem of blasting building railway tunnel in complicated environment,and are also applied to city highway tunnels,the social and economic benefits are acquired. The study result can provide references for tunnel in complicated environment.
傅洪贤,赵 勇,谢晋水,等. 隧道爆破近区爆破振动测试研究[J]. 岩石力学与工程学报,2011,30(2):335-340.(FU Hongxian,ZHAO Yong,XIE Jinshui,et al. Study of blasting vibration test of area near tunnel blasting source[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(2):335-340.(in Chinese))
[3]
安波盛雄. 采用预切槽爆破施工法的防振措施——线性磁浮实验线•初狩隧道[J]. 朱明其译. 隧道译丛,1994,(10):11-19. (SHENGSONG A P. Decreasing vibration with pre-cutting method- experimental maglev•Chushou tunnel[J]. Translated by ZHU Mingqi. Transcribe Tunnel,1994,(10):11-19.(in Japanese))
Your browse does not support frame! " target="_blank">
[4]
周乔勇,尚艳亮,赵 玉. 爆破干扰降振法在隧道爆破施工中的应用[J]. 铁道建筑,2007,(4):52-54.(ZHOU Qiaoyong,SHANG Yanliang,ZHAO Yu. Apply of decreasing blasting vibration with interfering method in tunnel construction[J]. Railway Engineering,2007,(4):52-54.(in Chinese))
Your browse does not support frame! " target="_blank">
[7]
史雅语,刘 慧. 招宝山超小净距隧道开挖爆破技术[J]. 工程爆破,1997,3(4):31-36.(SHI Yayu,LIU Hui. Blasting technology of Zhaobaoshan tunnel with little space[J]. Engineering Blasting,1997,3(4):31-36.(in Chinese))
Your browse does not support frame! " target="_blank">
张继春,曹孝君,郑爽英,等. 浅埋隧道掘进爆破的地表震动效应试验研究[J]. 岩石力学与工程学报,2005,24(22):4 158-4 163. (ZHANG Jichun,CAO Xiaojun,ZHENG Shuangying,et al. Experimental study on vibration effects of ground due to shallow tunnel blasting[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(22):4 158-4 163.(in Chinese))
Your browse does not support frame! " target="_blank">
朱赞成,徐化祥. 广州地铁三号线连拱隧道微震爆破设计[J]. 爆破,2007,24(3):110-113.(ZHU Zancheng,XU Huaxiang. Design of slight vibration blasting for buried excavation for No 3 multiple-arch tunnel in Guangzhou[J]. Blasting,2007,24(3):110-113.(in Chinese))
Your browse does not support frame! " target="_blank">