[3] |
张厚美,过 迟,付德明. 圆形隧道装配式衬砌接头刚度模型研究[J]. 岩土工程学报,2000,22(3):309-313.(ZHANG Houmei,GUO Chi,Fu Deming. A study on the stiffness model of circular tunnel prefabricated lining[J]. Chinese Journal of Geotechnical Engineering,2000,22(3):309-313.(in Chinese))
|
[4] |
苏海东. 盾构法隧洞的平面非线性有限元分析[J]. 长江科学院院报,2000,17(4):22-26.(SU Haidong. Two-dimensional nonlinear FEM analysis for shield tunneling[J]. Journal of Yangtze River Scientific Research Institute,2000,17(4):22-26.(in Chinese))
|
[6] |
谢小玲,苏海东. 穿黄隧道双衬砌结构平面非线性有限元分析[J]. 长江科学院院报,2002,19(增1):61-63.(XIE Xiaoling,SU Haidong. Two-dimensional nonlinear FEM analysis for double lined tunnel of Yellow-River-crossing works[J]. Journal of Yangtze River Scientific Research Institute,2002,19(Supp.1):61-63.(in Chinese))
|
[7] |
何英杰,袁 江. 影响盾构隧道衬砌接头刚度的因素[J]. 长江科学院院报,2001,18(1):20-26.(HE Yingjie,YUAN Jiang. Factors affecting joint stiffness of shield tunnel lining[J]. Journal of Yangtze River Scientific Research Institute,2001,18(1):20-26.(in Chinese))
|
[11] |
石修松,程展林,王路君. 岩土本构模型的模糊系统辨识方法[J]. 水利水运工程学报,2010,(3):10-16.(SHI Xiusong,CHENG Zhanlin,WANG Lujun. Identification of geo-material constitutive model using fuzzy system[J].Hydro-science and Engineering,2010,(3):10-16.(in Chinese))
|
[1] |
过 迟,吕国梁. 穿黄工程盾构隧洞衬砌结构计算模型研究[J]. 岩土力学,1997,18(增):203-207.(GUO Chi,LU Guoliang. A study on the design and computational model of liner construction for the proposed shield-driven tunnel in the Yellow River—crossing project[J]. Rock and Soil Mechanics,1997,18(Supp.):203-207.(in Chinese))
|
[2] |
章 青,卓家寿. 盾构式输水隧洞的计算模型及其工程应用[J]. 水利学报,1999,(2):19-22.(ZHANG Qing,ZHUO Jiashou. A computational model of shield tunnel for water conveyance[J]. Journal of Hydraulic Engineering,1999,(2):19-22.(in Chinese))
|
[5] |
张厚美,过 迟,吕国梁. 盾构压力隧洞双层衬砌的力学模型研究[J]. 水利学报,2001,(4):28-33.(ZHANG Houmei,GUO Chi,LU Guoliang. Mechanical model for shield pressure tunnel with secondary linings[J]. Journal of Hydraulic Engineering,2001,(4):28-33.(in Chinese))
|
[8] |
何英杰,张述琴,吕国梁. 穿黄隧道内外衬联合受力结构模型试验研究[J]. 长江科学院院报,2002,19(增1):64-67.(HE Yingjie,ZHANG Shuqin,LU Guoliang. Experiment research on united action of inside and outside liner of Yellow River-crossing tunnel of Water Transfer Project from South to North[J]. Journal of Yangtze River Scientific Research Institute,2002,19(Supp.1):64-67.(in Chinese))
|
[9] |
黄钟晖. 盾构法隧道管片衬砌纵缝接头受力模型的研究[J]. 地下空间,2003,23(3):296-305.(HUANG Zhonghui. Study on loading model of joints at longitudinal seam of lining segments in shield tunnel[J]. Underground Space,2003,23(3):296-305.(in Chinese))
|
[10] |
谢小玲,苏海东,陈 琴. 穿黄隧洞预应力衬砌结构三维非线性有限元分析[J]. 人民长江,2008,39(24):6-13.(XIE Xiaoling,SU Haidong,CHEN Qing. 3D nonlinear limited element analysis for prestressed linear structure of the tunnel passing through the Yellow River[J]. Yangtze River,2008,39(24):6-13.(in Chinese))
|
[12] |
郭熙灵,饶锡保,何晓民,等. 穿黄工程地基土的工程特性研究[J]. 长江科学院院报,2002,19(增1):83-88.(GUO Xiling,RAO Xibao,HE Xiaomin,et al. Engineering properties of foundation soil of Yellow- River-crossing project[J]. Journal of Yangtze River Scientific Research Institute,2002,19(Supp.1):83-88.(in Chinese))
|
[13] |
冯国栋. 土力学[M]. 北京:水利水电出版社,1986:75.(FENG Guodong. Soil mechanics[M]. Beijing:China Water Power Press,1986:75.(in Chinese))
Your browse does not support frame! |