[1] LEMY F,YONG S,SCHULZ T. A case study of monitoring tunnel wall displacement using laser scanning technology[C]// Proceeding of the International Association for Engineering Geology (IAEG 2006). [S.l.]:[s.n.],2006,482–493.
[2] SEO D J,LEE J C,LEE Y D,et al. Development of cross section management system in tunnel using terrestrial laser scanning technique[C]// The International Archives of the Photogrammetry,Remote Sensing and Spatial Information Sciences. Beijing:[s.n.],2008:573–582.
[3] FEKETE S,DIEDERICHS M,LATO M. Geotechnical and operational applications for three-dimensional laser scanning in drill and blast tunnels[J]. Tunneling and Underground Space Technology,2010,25(5):614–628.
[4] 托 雷. 基于三维激光扫描数据的地铁隧道变形监测[硕士学位论文][D]. 北京:中国地质大学,2012.(TUO Lei. Subway tunnel deformation monitoring based on 3D laser scanning data[M. S. Thesis][D]. Beijing:China University of Geosciences,2012.(in Chinese))
[5] 刘宝乐. 三维激光扫描技术在隧道工程测量中的应用研究[硕士学位论文][D]. 武汉:长江科学院,2015.(LIU Baole. The research for application about 3D laser scanning technology in the tunnel engineering survey[M. S. Thesis][D]. Wuhan:Yangtze River Scientific Research Institute,2015.(in Chinese))
[6] 刘燕萍,程效军,贾东峰. 基于三维激光扫描的隧道收敛分析[J]. 工程勘察,2013,(3):74–77.(LIU Yanping,CHENG Xiaojun,JIA Dongfeng. Tunnel safety monitoring based on terrestrial laser scanning technology[J]. Geotechnical Investigation and Surveying,2013,(3):74–77.(in Chinese))
[7] 谢雄耀,卢晓智,田海洋,等. 基于地面三维激光扫描技术的隧道全断面变形测量方法[J]. 岩石力学与工程学报,2013,32(11):2 214–2 224.(XIE Xionghui,LU Xiaozhi,TIAN Haiyang,et al. Development of a modeling for monitoring tunnel deformation based on terrestrial 3D laser scanning[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(11):2 214–2 224.(in Chinese))
[8] 刘绍堂,刘文锴,周跃寅. 一种隧道整体变形监测方法及其应用[J]. 武汉大学学报:信息科学版,2014,39(8):981–986.(LIU Shaotang,LIU Wenkai,ZHOU Yueyin. A tunnel overall deformation monitoring method and its application[J]. Geomatic and Information Science of Wuhan University,2014,39(8):981–986.(in Chinese))
[9] LICHTI D D. Error modelling. Calibration and analysis of an AM-CW terrestrial laser scanner system[J]. ISPRS Journal of Photogrammetry and Remote Sensing,2007,61(5):307–324.
[10] 史玉峰,张 俊,张迎亚. 基于地面三维激光扫描技术的隧道安全监测[J]. 东南大学学报:自然科学版,2013,43(增2):246–249.(SHI Yufeng,ZHANG Jun,ZHANG Yingya. Tunnel safety monitoring based on terrestrial laser scanning technology[J]. Journal of Southeast University:Natural Science,2013,43(Supp.2):246–249.(in Chinese))
[11] 潘建刚. 基于激光扫描数据的三维重建关键技术研究[硕士学位论文][D]. 北京:首都师范大学,2005.(PAN Jiangang. The research of the key problems of 3D reconstruction from laser scan date[M. S. Thesis][D]. Beijing:Capital Normal University,2005.(in Chinese))
[12] PIEGL L. On NURBS:a survey[J]. IEEE Computer Graphics and Applications,1991,11(1):55–71.
[13] 秦志光,张凤荔,刘锦德. NURBS曲面的算法分析及实现[J]. 电子科技大学学报,1994,23(4):15–18.(QIN Zhiguang,ZHANG Fengzhi,LIU Jinde. Algorithm analysis and implement of NURBS surface[J]. Journal of University of Electronic Science and Technology,1994,23(4):15–18.(in Chinese))
[14] PIEGL L,TILLER W. The NURBS book[M]. Berlin:Springer,1996:5–46.
[15] 孙少锐,吴继敏,魏继红. 隧洞围岩分类与洞径和超欠挖之间的关系研究[J]. 岩土力学,2005,26(8):1 278–1 282.(SUN Shaorui,WU Jimin,WEI Jihong. Research on relation among surrounding rock classification,tunnel radii and over break-under break of tunnels[J]. Rock and Soil Mechanics,2005,26(8):1 278–1 282.(in Chinese))