Abstract:The reservoir bank collapse is a common geological problem in the reservoir impounding process. There often exists significant difference between the prediction and the actual collapse ranges. A new method,named as balanced alluvial accumulation approach,is proposed for the prediction of reservoir bank collapse on the basis of the surveying of bank collapse cases of more than 10 large reservoirs in China,the measurement on all kinds of stable angle of collapse phenomenon,and the analysis of the applicable conditions,the collapse mechanism and the collapse factors of the current prediction method of bank collapse. The new method has the reasonable initial points and prediction parameters and overcomes the deficiency of the traditional prediction method of bank collapse. It is also verified by a case study.
彭仕雄. 水库塌岸预测的现状及冲堆平衡法[J]. 岩石力学与工程学报, 2014, 33(11): 2332-2340.
PENG Shixiong. STATE-OF-ART ART OF BANK COLLAPSE PREDICTING OF RESERVOIR AND A BALANCED ALLUVIAL ACCUMULATION APPROACH. , 2014, 33(11): 2332-2340.
洛姆塔季泽 В Д. 工程动力地质学[M]. 李生林,刘蕙兰,译. 北京:地质出版社,1985:3.(ЛОМТАДЗЕ В Д. Engineering geodynamics[M]. Translated by LI Shenglin,LIU Huilan. Beijing:Geological Publishing House,1985:3.(in Chinese))
Your browse does not support frame!