[1] |
钱七虎,李朝甫. 隧道掘进机在中国地下工程中应用现状及前景展望[J]. 地下空间,2002,22(1):1-11.(QIAN Qihu,LI Chaopu. The present and prospect of application of tunneler in China¢s underground engineering[J]. Underground Space,2002,22(1):1-11.(in Chinese))
|
[2] |
王梦恕,李典璜,张镜剑,等. 岩石隧道掘进机(TBM)施工及工程实例[M].北京:中国铁道出版社,2004:16-23.(WANG Mengshu,LI Dianhuang,ZHANG Jingjian,et al. The hard rock tunnel boring machine and tunnels excavated by TBM[M]. Beijing:China Railway Press,2004:16-23.(in Chinese))
|
[3] |
BRULANDA. Hard rock tunnel boring[Ph.D. Thesis][D]. Trondheim:Norwegian University of Science and Technology,1998.
|
[4] |
龚秋明. 掘进机隧道掘进概论[M]. 北京:科学出版社,2014:41.(GONG Qiuming. Introduction to tunnel boring machine[M]. Beijing:Science Press,2014:41.(in Chinese))
|
[5] |
张镜剑,傅冰骏. 隧道掘进机在我国应用的进展[J]. 岩石力学与工程学报,2007,26(2):226-238.(ZHANG Jingjian,FU Bingjun. Advances in tunnel boring machine application in China[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):226-238.(in Chinese))
|
[6] |
ROBBINSRJ. Present trends and future directions in tunnelling[C]//The Yugoslav Symp. on Rock Mechanics and Underground Actions. [S. l.]:[s. n.],1980:11.
|
[7] |
NELSON P P. TBM performance analysis with reference to rock properties[J]. Comprehensive Rock Engineering,1993,4(10):261-291.
|
[8] |
谷志孟,吕福庆. 使用掘进机条件下岩石可钻性的试验研究[J]. 岩土力学,1983,4(1):47-58.(GU Zhimeng,LUFuqing. The excavatability of rock under use of excavators[J]. Rock and Soil Mechanics,1983,4(1):47-58.(in Chinese))
|
[9] |
王石春. 隧道掘进机与地质因素关系综述[J]. 世界隧道,1998,(2):39-43.(WANG Shichun. Relationship between TBM Tunneling and geological conditions[J]. World Tunnel,1998,(2):39-43.(in Chinese))
|
[10] |
何发亮,谷明成. TBM施工隧道围岩分级方法研究[J]. 岩石力学与工程学报,2002,21(9):1350-1354.(HE Faliang,GU Mingcheng. Study on surrounding rock classification of tunnel cut by TBMs[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(9):1350-1354.(in Chinese))
|
[11] |
刘明月,杜彦良,麻士琦. 地质因素对TBM掘进效率的影响[J]. 石家庄铁道学院学报,2002,15(4):40-43.(LIU Mingyue,DU Yanliang,MA Shiqi. Analysis of relationship between geologic condition and the efficiency of TBM boring[J]. Journal of ShijiazhuangRailway Institute,2002,15(4):40-43.(in Chinese))
|
[12] |
李春明,彭耀荣.TBM施工隧洞围岩分类方法的探讨[J]. 中外公路,2006,26(3):235-237.(LI Chunming,PENG Yaorong.Discussion about surrounding rock classification of tunnel excavate by TBMs[J]. Journal of China andForeign Highway,2006,26(3):235-237.(in Chinese))
|
[13] |
王学潮.南水北调西线工程TBM施工围岩分级研究[M]. 郑州:黄河水利出版社,2011:3-25.(WANG Xuechao. Study on surrounding rock classification of tunnel excavate by TBMsof the west route of South to North water transferproject[M]. Zhengzhou:Yellow River Water Conservancy Press,2011:3-25.(in Chinese))
|
[14] |
宋克志,孙谋. 复杂岩石地层盾构掘进效能影响因素分析[J]. 岩石力学与工程学报,2007,26(10):2092-2096.(SONG Kezhi,SUN Mou. Analysis of influencing factors of shield tunneling performance in complex rock strata[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(10):2092-2096.(in Chinese))
|
[15] |
宋克志,孙树贤,袁大军,等.基于盾构掘进参数的岩石可切割性模糊识别[J].岩石力学与工程学报,2008,27(增1):3196-3202.(SONG Kezhi,SUN Shuxian,YUAN Dajun,et al. Fuzzy recognition for rock cuttability based on shield driving parameters[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.1):3196-3202.(in Chinese))
|
[16] |
温森,赵延喜,杨圣奇.基于Monte Carlo-BP神经网络TBM掘进速度预测[J]. 岩土力学,2009,30(10):3127-3132.(WEN Sen,ZHAO Yanxi,YANG Shengqi. Prediction on penetration rate of TBM based on Monte Carlo-BPneural network[J]. Rock and Soil Mechanics,2009,30(10):3127-3132.(in Chinese))
|
[17] |
龚秋明,佘祺锐,王继敏,等. 不同层厚层状岩体对TBM开挖的影响[J].岩石力学与工程学报,2010,29(7):1442-1449.(GONG Qiuming,SHE Qirui,WANG Jimin,et al. Influence of different thicknesses of marble layers on TBM excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(7):1442-1449.(in Chinese))
|
[18] |
龚秋明,佘祺锐,侯哲生,等. 高地应力作用下大理岩岩体的TBM掘进试验研究[J]. 岩石力学与工程学报,2010,29(12):2522-2532.(GONG Qiuming,SHE Qirui,HOU Zhesheng,et al. Experimental study of TBM penetration in marble rock mass under high geostress[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(12):2522-2532.(in Chinese))
|
[19] |
吴世勇,龚秋明,王鸽,等.锦屏II级水电站深部大理岩板裂化破坏试验研究及其对TBM开挖的影响[J]. 岩石力学与工程学报,2010,29(6):1089-1095.(WU Shiyong,GONG Qiuming,WANG Ge,et al. Experimental study of slabbing failure for deepburied marble at Jinging II hydropower station and its influences on TBM excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1089-1095.(in Chinese))
|
[20] |
苏利军,孙金山,卢文波. 基于颗粒流模型的TBM滚刀破岩过程数值模拟研究[J]. 岩土力学,2009,30(9):2823-2829.(SU Lijun,SUN Jinshan,LU Wenbo. Research on numerical simulation of rock fragmentation by TBM cutters using particle flow method[J]. Rock and Soil Mechanics,2009,30(9):2823-2829.(in Chinese))
|
[21] |
孙金山,陈明,陈保国,等. TBM滚刀破岩过程影响因素数值模拟研究[J]. 岩土力学,2011,32(6):1891-1897.(SUN Jinshan,CHEN Ming,CHEN Baoguo,et al. Numerical simulaiton of influence factors for rock fragmentation by TBM cutters[J]. Rock and Soil Mechanics,2011,32(6):1891-1897.(in Chinese))
|
[22] |
莫振泽,李海波,周青春,等. 基于UDEC的隧道掘进机滚刀破岩数值模拟研究[J].岩土力学,2012,33(4):1196-1202.(MO Zhenze,LI Haibo,ZHOU Qingchun,et al. Research on numerical simulation of rock breaking using TBM disc cutters based on UDEC method[J]. Rock and Soil Mechanics,2012,33(4):1196-1202.(in Chinese))
|
[23] |
张魁,夏毅敏,谭青,等. 不同围压条件下TBM刀具破岩模式的数值研究[J]. 岩土工程学报,2010,32(11):1780-1787.(ZHANG Kui,XI Yiming,TAN Qing,et al. Numerical study on modes of breaking rock by TBM cutter under different confining pressures[J]. Chinese Journal of Geotechnical Engineering,2010,32(11):1780- 1787.(in Chinese))
|
[24] |
谭青,李建芳,夏毅敏,等. 盘形滚刀破岩过程的数值研究[J]. 岩土力学,2013,34(9):2707-2714.(TAN Qing,LI Jianfang,XI Yiming,et al. Numerical research on rock fragmentation process by disc cutter[J]. Rock and Soil Mechanics,2013,34(9):2707-2714.(in Chinese))
|
[25] |
谭青,朱逸,夏毅敏,等.节理特征对TBM盘形滚刀破岩特性的影响[J]. 中南大学学报:自然科学版,2013,44(10):4 040-4 046.(TAN Qing,ZHU Yi,XI Yimin,et al. Influence of joint characteristics on rock fragmentation induced by TBM disc cutter[J]. Journal of Central South University:Science and Technology,2013,44(10):4 040-4 046.(in Chinese))
|
[26] |
马洪素,纪洪广. 节理倾向对TBM滚刀破岩模式及掘进速率影响的试验研究[J]. 岩石力学与工程学报,2011,30(1):155-163.(MA Hongsu,JI Hongguang. Experimental study of the effect of joint oriention on fragmentation modes and penetration rate under TBM disc cutters[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(1):155-163.(in Chinese))
|
[27] |
邹飞,李海波,周青春,等. 岩石节理倾角和间距对隧道掘进机破岩特性影响的试验研究[J]. 岩土力学,2012,33(6):1640-1646.(ZOU Fei,LI Haibo,ZHOU Qingchun,et al. Experimental study of influence of joint space and joint angle on rock fragmentation by TBM disc cutter[J]. Rock and Soil Mechanics,2012,33(6):1640-1646.(in Chinese))
|
[28] |
祁生文,伍法权,王大国,等. 岩石隧道掘进机(TBM)的施工速度(AR)与围岩分类[C]//隧道、地下工程及岩石破碎学术研讨会论文集,2007:67-76.(QI Shengwen,WU Faquan,WANG Daguo,et al. Advance rate of rock tunnel boring machine and surrounding rock classification[C]//Symposium on Tunneling,Underground Engineering and Rock Fragmentation. [S. l.]:[s. n.],2007:67-76.(in Chinese))
|
[29] |
王旭,李晓,苏鹏程. 预测TBM掘进速率的难点及对策研究[J]. 现代隧道技术,2009,46(4):71-76.(WANG Xu,LI Xiao,SU Pengcheng. Difficulties for predicting TBM advance rate and countermeasures[J]. Modern Tunneling Technology,2009,46(4):71-76.(in Chinese))
|
[30] |
王旭,李晓,李守定. 关于用岩体分类预测TBM掘进速率AR的讨论[J]. 工程地质学报,2008,16(4):470-475.(WANG Xu,LI Xiao,LI Souding. Problems in the prediction of the TBM advance rate with rock mass classification and their possible solutions[J]. Journal of Engineering Geology,2008,16(4):470-475.(in Chinese))
|
[31] |
王旭,李晓,廖秋林. 岩石可掘进性研究的试验方法述评[J]. 地下空间与工程学报,2009,5(1):67-73.(WANG Xu,LI Xiao,LIAO Qiulin. A review of rock boreability testing for TBM tunnelling[J]. Chinese Journal of Underground Space and Engineering,2009,5(1):67-73.(in Chinese))
|
[32] |
ROSTAMI J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure[Ph.D. Thesis][D]. Golden:Colorado School of Mines,1997.
|
[33] |
ROSTAMI J,OZDEMIR L. A new model for performance prediction of hard rock TBMs[C]//Proceedings of the Rapid Excavation and Tunneling Conference. [S. l.]:[s. n.],1993:793-809.
|
[34] |
BARTON N R. TBM tunnelling in jointed and faulted rock[M]. Boca Raton:CRC Press,2000:170-175.
|
[35] |
BIENIAWSKI Z T,CELADA B,GALERA J M. TBM Excavability: prediction and machine-rock interaction[C]//Proceedings of RETC,Toronto:[s. n.],2007:1118-1130.
|
[36] |
BIENIAWSKI Z T,CELADA B,GALERA J M.Predicting TBM excavability[J]. Tunnels andTunnelling International,2007(9):25-28.
|
[37] |
BIENIAWSKI Z T,GRANDORI R. Predicting TBM Excavability-Part II[J]. Tunnels andTunnelling International,2007(11):15-18.
|
[38] |
BIENIAWSKI Z T,CELADA B,GALERA J M,et al. New applications of the excavability index for selection of TBM types and predicting their performance[C]//ITA-AITES World Tunnel Congress and34th ITA General Assembly. Agra:[s. n.],2008:1618-1629.
|
[39] |
SANIO H P. Prediction of the performance of disc cutters in anisotropic rock[J].International Journal of Rock Mechanics and Mining Sciences andGeomechanics Abstracts,1985,22(3):153-161.
|
[40] |
BOYD R J. Hard rock continuous mining machine:Mobile Miner MM-120[C]//Rock Excavation Engineering Seminar. Queensland:University of Queensland,1986:618-626.
|
[41] |
OZDEMIR L. Development of theoretical equations for predicting tunnel borability[Ph.D. Thesis][D]. Golden:Colorado School of Mines,1977.
|
[42] |
ROSTAMI J. Design optimization,performance prediction,and the economic analysis of TBM application for the construction of proposed Yucca Mountain nuclear waste repository[Ph.D. Thesis][D]. Golden:Colorado School of Mines,1991.
|
[43] |
YAGIZ S. Development of rock fracture and brittleness indices to quantify the effects of rock mass features and toughness in the CSM model basic penetration for hard rock tunneling machines[Ph.D. Thesis][D]. Golden:Colorado School of Mines,2002.
|
[44] |
RAMEZANZADEH A.Performance analysis and development of new models for performance prediction of hard rock TBMs in rock mass[Ph.D. Thesis][D]. Lyon:Institut National des Sciences Appliquées,2005.
|
[45] |
TARKOY P J. Predicting TBM penetration rates in selected rock types[C]//Proceedings of the Ninth Canadian Rock Mechanics Symposium. Montreal:[s. n.],1973.
|
[46] |
GRAHAM P C. Rock exploration for machine manufacturers[J]. Exploration for Rock Engineering,1976:173-180.
|
[47] |
FARMER I W,GLOSSOP N H. Mechanics of disc cutter penetration[J]. Tunnels and Tunnelling,1980,12(6):22-25.
|
[48] |
CASSINELLI F,CINA S,INNAURATO N. Power consumption and metal wear in tunnel-boring machines:analysis of tunnel-boringoperation in hard rock[C]//Proceedings of the 3rd International Symposium. Brighton:[s. n.],1982:73-81.
|
[49] |
SNOWDON R A,RYLEY M D,TEMPORAL J. A study of disc cutting in selected British rocks[J]. International Journal of Rock Mechanics and Mining Sciences andGeomechanics Abstracts,1982,19(3):107-121.
|
[50] |
NELSON P,O¢ROURKE T D,KULHAWY F H. Factors affecting TBM penetration rates in sedimentary rocks[C]//Proceedings of 24th US Symposium on Rock Mechanics. [S. l.]:[s. n.],1983:227-237.
|
[51] |
BAMFORD W E. Rock test indices are being successfully correlated with tunnel boring machine performance[C]//the Fifth Australian Tunnelling Conference:State of the Art in Underground Development and Construction. [S. l.]:Institution of Engineers,Australia,1984:9-22.
|
[52] |
BÜCHI E. Einflussgeologischer parameter auf die vortriebsleistung einer tunnelbohrmaschine[Ph.D. Thesis][D]. [S. l.]:Diss. Universität Bern,1984.
|
[53] |
HUGHES H M. The relative cuttability of coal-measures stone[J]. Mining Science and Technology,1986,3(2):95-109.
|
[54] |
INNAURATO N,MANCINI A,RONDENA E,et al. Forecasting and effective TBM performances in a rapid excavation of a tunnel in Italy[C]//The 7th ISRM Congress. International Society for Rock Mechanics,1991:1009-1014.
|
[55] |
SUNDIN N O,WÄNSTEDT S. A boreability model for TBM's[C]// Proceedings of the 1st North American Rock Mechanics Symposium. Rotterdam:A.A.Balkema,1994:311-318.
|
[56] |
O¢ROURKE J E,SPRING J E,COUDRAY S V. Geotechnicl parameters and tunnel boring machine performance at Goodwill Tunnel,California[C]//Proceedings ofthe 1st North American Rock Mechanics Symposium. Rotterdam:A.A.Balkema,1994:467-473.
|
[57] |
NELSON P P,AL-JALIL Y A,LAUGHTON C. Tunnel boring machine project data bases and construction simulation[R]. Austin,Texas:The University of Texas at Austin,1994,708-712.
|
[58] |
龚秋明,赵 坚,张喜虎. 岩石隧道掘进机的施工预测模型[J]. 岩石力学与工程学报,2004,23(增2):4709-4714.(GONG Qiuming,ZHAO Jian,ZHANG Xihu. Performance prediction of hard rock TBM tunneling[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(Supp.2):4709-4714.(in Chinese))
|
[59] |
YAGIZ S,ROSTAMI J,OZDEMIR L. Recommended rock testing methods for predicting TBM performance:focus on the CSM and NTNU Models[C]//Proceedings of the ISRM International Symposium. [S. l.]:[s. n.],2008:1523-1530.
|
[60] |
SAPIGNI M,BERTI M,BETHAZ E,et al. TBM performance estimation using rock mass classifications[J]. International Journal of Rock Mechanics and Mining Sciences,2002,39(6):771-788.
|
[61] |
BLINDHEIM O T. A critique of QTBM[J]. Tunnels andTunnelling International,2005,37(6):32-35.
|
[62] |
PALMSTROM A,BROCH E. Use and misuse of rock mass classification systems with particular reference to theQ-system[J]. Tunnelling and Underground Space Technology,2006,21(6):575-593.
|
[63] |
ALBER M. Advance rates of hard rock TBMs and their effects on project economics[J]. Tunnelling and Underground Space Technology,2000,15(1):55-64.
|
[64] |
ALBER M. Design of high speed TBM-drives[C]//Proceedings of 8th Int. IAEG Congr. Rotterdam:[s. n.],1998:3537-3543.
|
[65] |
ALVAREZ G M,BRUINES P A,VERHOEF P N W. Modeling tunnel boring machine performance by neuro-fuzzy methods[J]. Tunnelling and Underground Space Technology,2000,15(3):259-269.
|
[66] |
TAKAGI T,SUGENO M. Fuzzy identification of systems and its applications to modeling and control[J]. Systems,Man and Cybernetics,IEEE Transactions on,1985,(1):116-132.
|
[67] |
FARROKH E,ROSTAMI J,LAUGHTON C. Study of various models for estimation of penetration rate of hard rock TBMs[J]. Tunnelling and Underground Space Technology,2012,30(1):110-123.
|
[68] |
RIBACCHI R,FAZIO A L. Influence of rock mass parameters on the performance of a TBM in a gneissic formation(Varzo Tunnel)[J]. Rock Mechanics and Rock Engineering,2005,38(2):105-127.
|
[69] |
YAGIZ S. Utilizing rock mass properties for predicting TBM performance in hard rock condition[J]. Tunnelling and Underground Space Technology,2008,23(3):326-339.
|
[70] |
GONG Q M,ZHAO J. Development of a rock mass characteristics model for TBM penetration rate prediction[J]. International Journal of Rock Mechanics and Mining Sciences,2009,46(1):8-18.
|
[71] |
HASSANPOUR J,ROSTAMI J,KHAMEHCHIYAN M,et al. Developing new equations for TBM performance prediction in carbonate-argillaceous rocks:a case history of Nowsood water conveyance tunnel[J]. Geomechanics and Geoengineering:An International Journal,2009,4(4):287-297.
|
[72] |
HASSANPOUR J,ROSTAMI J,KHAMEHCHIYAN M,et al. TBM performance analysis in pyroclastic rocks:a case history of Karaj water conveyance tunnel[J]. Rock Mechanics and Rock Engineering,2010,43(4):427-445.
|
[73] |
HASSANPOUR J,ROSTAMI J,ZHAO J. A new hard rock TBM performance prediction model for project planning[J]. Tunnelling and Underground Space Technology,2011,26(5):595-603.
|
[74] |
KHADEMI H J,SHAHRIAR K,REZAI B,et al. Performance prediction of hard rock TBM using rock mass rating(RMR) system[J]. Tunnelling and Underground Space Technology,2010,25(4):333-345.
|
[75] |
DELISIO A,ZHAO J,EINSTEIN H H. Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg base tunnel[J]. Tunnelling and Underground Space Technology,2013,33(1):131-142.
|
[76] |
DELISIO A,ZHAO J. A new model for TBM performance prediction in blocky rock conditions[J]. Tunnelling and Underground Space Technology,2014,43(1):440-452.
|
[77] |
GONG Q M,ZHAO J. Influence of rock brittleness on TBM penetration rate in Singapore granite[J]. Tunnelling and Underground Space Technology,2007,22(3):317-324.
|
[78] |
尚彦军,杨志法,曾庆利,等. TBM施工遇险工程地质问题分析和失误的反思[J]. 岩石力学与工程学报,2007,26(12):2404-2411.(SHANG Yanjun,YANG Zhifa,ZENG Qingli,et al. Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2404-2411.(in Chinese))
|
[79] |
万治昌,沙明元,周雁领. 盘形滚刀的使用与研究(1):TB880E型掘进机的秦岭隧道施工中的应用[J]. 现代隧道技术,2002,39(5):1-11.(WAN Zhichang,SHA Mingyuan,ZHOU Yanling. Study on disk cutters for hard rocks—Application of TB880E TBM in Qinling Tunnel[J]. Modern Tunnelling Technology,2002,39(5):1-11.(in Chinese))
|
|
[80]
|