Stress and deformation analysis of shield incline shafts segment due to dewater settlement of aquifer
SHI Xiaomeng1,LIU Baoguo1,LI Tao1,DU Xin2
(1. School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China; 2. Changping College of Non-commissioned Officer,The Academy of Equipment,Beijing 102200,China)
Abstract:This paper pointed out the influence of dewatering settlement on the structure of shield inclined shafts in the aquifer. The dewater settlement laws of aquifer were analyzed,and the compression ratio of aquifer was selected as the parameter to represent the dewater settlement performance. The load and deformation which the shield segment suffered during aquifer dewatering were studied,and the cantilever beam model under even load was built. The elastic-plastic analytical solutions of the stress and deformation of the shield incline shafts were given through the equivalent continuum model. At last,the mechanical model proposed in this paper was applied to the shield inclined shaft in Shenhua Xinjie coal mine,and the stress and deformation of the incline shafts due to dewater settlement of aquifer were worked out.
高润平,刘 文.隧道掘进机在塔山煤矿平硐施工中的应用[J]. 煤矿开采,2005,(5):44-46.(GAO Runping,LIU Wen. Application of the tunneling machine in the construction of chamber in Tashan coal mine[J]. Coal Mining Technology,2005,(5):44-46.(in Chinese))
刘泉声,时 凯,黄 兴.TBM应用于深部煤矿建设的可行性及关键科学问题[J]. 采矿与安全工程学报,2013,(5):633-641.(LIU Quansheng,SHI Kai,HUANG Xin. Feasibility of application of TBM in construction of deep coal mine and its key scientific problems[J]. Journal of Mining and Safety Engineering,2013,(5):633-641.(in Chinese))
[4]
何 川.盾构/TBM施工煤矿长距离斜井的技术挑战与展望[J]. 隧道建设,2014,(4):287-297.(HEChuan. Challenge and prospective of construction of Long-distance incline shafts of coal mines by shield/TBM[J]. Tunnel Construction,2014,(4):287-297.(in Chinese))
[5]
崔广心,程锡禄. 徐淮地区井壁破坏原因的初步研究[J]. 煤炭科学技术,1991,(8):46-50.(CUIGuangxin,CHEN Xilu. Primary research on the failure mechanism of borehole walls in Xu-Huai area[J]. Coal Science and Technology,1991,(8):46-50.(in Chinese))
[6]
楼根达,陈湘生.关于疏水沉降地层中井壁破坏问题的认识与建议[J]. 建井技术,1998,19(1):1-4.(LOUGenda,CHENXiangsheng. The understanding and proposalof the borehole walls failure considering dewater settlement[J]. Mine Construction Technology,1998,19(1):1-4.(in Chinese))
[7]
刘希亮. 深部土体失水变形及诱发井筒破裂的机制与研究[博士学位论文][D]. 徐州:中国矿业大学,2000.(LIUXiliang. Study on the law of dewater settlementof bottom aquifer in overburden[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2000.(in Chinese))
[8]
郑永来,韩文星,童琪华,等. 软土地铁隧道纵向不均匀沉降导致的管片接头环缝开裂研究[J]. 岩石力学与工程学报,2005,24(24):4552-4558.(ZHENG Yonglai,HAN Wenxing,TONGQihua,et al. Study on longitudinalcrack of shield tunnel segment joint due to asymmetric settlement in soft soil[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(24):4552-4558.(in Chinese))
[9]
BOREEK M,CHUDEKM. 矿山岩体力学[M]. 于振海译. 北京:煤炭工业出版社,1985:217-220.(BOREEK M,CHUDEK M. Mining rock mass mechanics[M]. Translated by YU Zhenhai. Beijing:China Coal Industry Publishing House,1985:217-220.(in Chinese))
[10]
CHRISTLE IF. A Re-appraisal of Merchant¢s contribution to the theory of consolidation[J]. Geotechnique,1964,14(4):426-537.
[11]
李文平. 徐淮矿区深厚表土底含失水压缩变形实验研究[J]. 煤炭学报,1999,24(3):231-235.(LI Wenping. Testing research of compressivedeformation due to water loss of the bottom aquifer buried by great overburden soils in Xuhuai mine area[J]. Journal of China Coal Society,1999,24(3):231-235.(in Chinese))
[12]
刘希亮. 深厚表土底部含水层疏排水沉降规律研究[博士学位论文][D]. 徐州:中国矿业大学,2000.(LIU Xiliang. Study on the law of dewater settlementof bottom aquifer in overburden[Ph. D. Thesis][D]. Xuzhou:China University of Mining and Technology,2000.(in Chinese))
[13]
钱鸣高,石平五,许家林. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社,2010:1-6.(QIANMinggao,SHI Pingwu,XU Jialin. Mining pressure and strata control[M]. Xuzhou:China University of Mining and Technology Press,2010:1-6.(in Chinese))
[14]
志波由纪夫,川島一彦. シ―ルドトソネルの耐震解析に用いる長手方向覆土剛性の評價法[C]//土木学会論文集. [S. l. ]:[s. n.],1988:319-327.
[15]
志波由纪夫,川島一彦. 応答変位法によるシ―ルドトソネルの地震时断面力の算定法[C]// 土木学会論文集. [s. l. ]:[s. n.],1988:385-394.
[16]
张厚美,过 迟,付德明. 圆形隧道装配式衬砌接头刚度模型研究[J].岩土工程学报,2000,22(3):309-313.(ZHANGHoumei,GUOChi,FU Deming. A study on the stiffness model of circular tunnel prefabricated lining[J]. Chinese Journal of Geotechnical Engineering,2000,22(3):309-313.(in Chinese))