SHTB experiment study of CRLD bolt under the monitoring by laser displacement sensor
GONG Weili1,2,ZHANG Zixiang1,2,GAO Xia1,2,HE Manchao1,2,SUN Yaxing1,2
(1. State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Beijing 100083,China;2 School of Mechanics,Architecture and Civil Engineering,China University of Mining and Technology,Beijing 100083,China)
The constant resistance and large deformation bolt(CRLD bolt) which working resistance is 130 kN and has widely been used as rock support in longwall mining based on gob-side entry retaining without coal pillar(110 mining method) was selected as the sample. In order to investigate it′s dynamic response characteristics,the SHTB tests were carried out on the modified SHTB system which modified by HE Manchao. In the test,quartz piezoelectric force sensor and laser displacement sensor were used to monitor the impact force and impact displacement response of the CRLD bolt at different impact speeds. The test results show that,under the impact load,the impact force and the elongation speed of the bolt both reach the peaks within 0.5 ms,and the CRLD bolt can respond rapidly to the impact. Under different impact velocities,the impact force and deformation velocity of CRLD bolt are both a fluctuation which going through a time developing process. The deformation of large deformation bolt with constant resistance is a process of elastic-slip-elastic recovery.
何满潮.滑坡地质灾害远程监测预报系统及其工程应用[J].岩石力学与工程学报,2009,28(6):1081-1090.(HE Manchao. Real-time remote monitoring and forecasting system for geological disasters of landslides and its engineering application[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(6):1081-1090.(in Chinese))
[2]
何满潮,郭志飚.恒阻大变形锚杆力学特性及其工程应用[J]. 岩石力学与工程学报,2014,33(7):1297-1308.(HE Manchao,GUO Zhibiao. Mechanical property and engineering application of anchor bolt with constant resistance and large deformation[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(7):1297-1308.(in Chinese))
[3]
何满潮,王炯,孙晓明,等.负泊松比效应锚索的力学特性及其在冲击地压防治中的应用研究[J].煤炭学报,2014,39(2):214-221.(HE Manchao,WANG Jiong,SUN Xiaoming,et al.Mechanics characteristics and applications of prevention and control rock bursts of the negative poisson′s ratio effect anchor[J].Journal of China Coal Society,2014,39(2):214-221.(in Chinese))
[4]
HE M,GONG W,WANG J,et al. Development of a novel energy-absorbing bolt with extraordinarily large elongation and constant resistance[J]. International Journal of Rock Mechanics and Mining Sciences,2014,67(1):29-42.
[5]
何满潮,李晨,宫伟力,等. 恒阻大变形锚杆/索支护原理及大变形控制技术[J]. 岩石力学与工程学报,2016,35(8):1513-1529.(HE Manchao,LI Chen,GONG Weili,et al. Support principles of CRLD bolts/cables and control techniques of large deformation[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(8):1513-1529.(in Chinese) )
[6]
张国锋,何满潮,俞学平,等.白皎矿保护层沿空切顶成巷无煤柱开采技术研究[J].采矿与安全工程学报,2011,28(4):511-516. (ZHANG Guofeng,HE Manchao,YU Xueping,et al. Research on the technique of No-Pillar mining with gob-side entry formed by advanced roof caving in the protective seam in Baijiao coal mine[J]. Journal of Mining andSafety Engineering,2011,28(4):511-516.(in Chinese))
[7]
陶志刚,张海江,彭岩岩,等.滑坡监测多源系统云服务平台架构及工程应用[J].岩石力学与工程学报,2017,36(7):1649-1658. (TAO Zhigang,ZHANG Haijiang,PENG Yanyan,et al. Frame structure and engineering applications of multi-source system cloud[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(7):1649- 1658.(in Chinese))
[8]
李晨,何满潮,宫伟力.不同冲击速率下恒阻大变形锚杆动力学特性分析[J]. 煤炭科学技术,2015,(9):53-58.(LI Chen,HE Manchao,GONG Weili.Analysis on kinetic features of constant resistance high deformed bolt under different impact velocity[J].Coal Science and Technology,2015,(9):53-58.(in Chinese))
[9]
李晨,何满潮,宫伟力.恒阻大变形锚杆负泊松比效应的冲击动力学分析[J].煤炭学报,2016,41(6):1393-1399.(LI Chen,HE Manchao,GONG Weili. Analysis on impact dynamics of negative Poisson¢s ratio effect of anchor bolt with constant resistance and large deformation[J]. Journal of China Coal Society,2016,41(6):1393- 1399.(in Chinese))
[10]
HE MC,LI C,GONG WL,et al. Dynamic tests for a Constant-Resistance-Large-Deformation bolt using a modified SHTB system[J].Tunneling and Underground Space Technology,2017,(64):103-116.
[11]
何满潮,李晨,宫伟力.恒阻大变形锚杆冲击拉伸实验及其有限元分析[J].岩石力学与工程学报,2015,34(11):2079-2187.(HE Manchao,LI Chen,GONG Weili,et al. Elongation and impacting experimental system for bolts with constant resistance and large deformation and finite element analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(11):2079-2187.(in Chinese))
[12]
王汉鹏,李术才,郑学芬,等.地质力学模型试验新技术研究进展及工程应用[J].岩石力学与工程学报,2009,28(增1):2765-2771. (WANG Hanpeng,LI Shucai,ZHENG Xuefen,et al.Precision displacement measurement of a laser triangulation sensor[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):2765-2771.(in Chinese))
[13]
戴立铭,江潼君.激光三角测量传感器的精密位移测量[J].仪器仪表学报,1994,(4):400-404.(DAI Liming,JIANG Tongjun. Research progress of geomechanical model test with new technology and its engineering application[J]. Chinese Journal of Scientific Instrument,1994,(4):400-404.(in Chinese))
[14]
付玉凯. 高冲击韧性锚杆吸能减冲原理及应用[博士学位论文][D].北京:煤炭科学研究总院,2015.(FU Yukai. Energy absorption and rockburst weakening theory for high impact toughness rock bolt and its applications[Ph. D. Thesis][D]. Beijing:China Coal Research Institute,2015.(in Chinese))
[15]
王礼立,余同希,李永池. 冲击动力学进展[M]. 合肥:中国科学技术大学,1992:380-382.(WANG Lili,YU Tongxi,LI Yongchi. Advance of impact dynamics[M].Hefei:University of Science and Technology of China,1992:380-382.(in Chinese))
[16]
李晨. 恒阻大变形锚杆冲击拉伸动力学特性研究[博士学位论文][D].北京:中国矿业大学(北京),2016.(LI Chen. Study on Impacting and Elongation Dynamic Mechanical Characteristics of CRLD bolt[Ph. D. Thesis][D].Beijing:China University of Mining and Technology(Beijing),2016.(in Chinese))