Abstract:Considering landslides,distortion of steel arch and frequent arch changing occur easily for large cross section tunnels of carbide argillite in the course of construction,Selected multiple monitor sections near the entrances and exits of Xiaopanling tunnels for the field test. Conducted the convergence deformation test,vault subsidence test,bolt axle force test,sprayed concrete strain test,steel camber bearing stress test,secondary lining concrete strain test,secondary lining back surrounding rocks stress test respectively. The results show that the tunnel deformation stabilizes at 48 d and the deformation accumulation is large,the vault subsidence reached 334 mm,convergence value reached 318 mm. The study also shows that taking the excavation step of 0.5 m,adopting I20 steel bracing,and taking the radial grouting behind the tunnel lining,can effectively reduce the stress of surrounding rock deformation and lining structure. This study points out the effects of the network on veracity and advantages of deformation prediction of surrounding rock. This method has great guidance for the excavation of tunnel construction site.
苏道振,骆建军. 大断面软弱地层隧道施工围岩变形试验及预测[J]. 岩石力学与工程学报, 2016, 35(S2): 4029-4039.
SU Daozhen,LUO Jianjun. Experimental study and prediction on large section tunnel construction deformation of surrounding rock in soft ground. , 2016, 35(S2): 4029-4039.
史克臣. 特大断面隧道高地应力条件下变形控制技术研究[J]. 现代隧道技术,2013,50(5):146-151.(SHI Kechen. On deformation control for extra-large section tunnels under high ground stress[J]. Modern TunnelingTechnology,2013,50(5):146-151.(in Chinese))
[2]
赵清伯. 胡麻岭隧道斜井富水粉细砂地层松动圈测试与围岩压力计算[J]. 现代隧道技术,2012,49(4):17-21.(ZHAO Qingbo. Loose rock zone measurements and rock mass pressure calculations for a saturated fine silt stratum[J]. ModernTunnelingTechnology,2012,49(4):17-21.(in Chinese))
[3]
方 正,吴 平,刘丹珠. 软土隧道岩体参数正交反演分析[J]. 现代隧道技术,2013,50(2):66-71.(FANG Zheng,WU Ping,LIU Danzhu. Orthogonal back-analysis of geotechnical parameters for a soft-soil tunnel[J]. Modern Tunneling Technology,2013,50(2):66-71.(in Chinese))
[4]
张文新,孙韶峰,刘 虹. 木寨岭隧道高地应力软岩大变形施工技术[J]. 现代隧道技术,2011,48(2):78-82.(ZHANG Wenxin,SUN Shaofeng,LIU Hong. Construction techniques of muzhailing tunnel with high ground stresses and large soft rock deformations[J]. Modern Tunneling Technology,2011,48(2):78-82.(in Chinese))
[5]
肖建清,冯夏庭,林大能. 爆破循环对围岩松动圈的影响[J]. 岩石力学与工程学报,2010,29(11):2 248-2 255.(XIAO Jianqing,FENG Xiating,LIN Daneng. Influence of blasting round on excavation damaged zone of surrounding rock[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(11):2 248-2 255.(in Chinese))
[6]
傅洪贤,赵 勇,谢晋水. 铁路双线隧道围岩爆破松动范围测试分析[J]. 中国铁道科学,2010,31(5):54-58.(FU Hongxian,ZHAO Yong,XIE Jinshui. Testanalysis on the broken rock zone of the surrounding rock blasting for railway double-line tunnel[J]. China Railway Science,2010,31(5):54-58.(in Chinese))
[7]
仇文革,章慧健. 考虑峰后效应的围岩特征曲线[J]. 中国铁道科学,2011,32(3):63-67.(QIU Wenge,ZHANG Huijian. The characteristic curve of surrounding rock regarding post-failure behavior[J]. China Railway Science,2011,32(3):63-67.(in Chinese))
[8]
王建晨,张顶立,张成平,等. 北京地区浅埋暗挖法下穿施工既有隧道变形特点及预测[J]. 岩石力学与工程学报,2014,33(5):947-956.(WANG Jianchen,ZHANG Dingli,ZHANG Chengping,et al. Deformation characteristics of existing tunnels induced by excavation of new shallow tunnel in Beijing[J] Chinese Journal of Rock Mechanics and Engineering,2014,33(5):947-956.(in Chinese))
[9]
李利平,李术才,赵 勇,等. 超大断面隧道软弱破碎围岩空间变形机制与荷载释放演化规律[J]. 岩石力学与工程学报,2012,31(10):2 109-2 118.(LI Liping,LI Shucai,ZHAO Yong,et al. Spatial deformation mechanism and load release evolutionlaw of surrounding rock during construction of super-large section tunnel with soft broken surrounding rock masses[J] Chinese Journal of Rock Mechanics and Engineering,2012,31(10):2 109-2 118.(in Chinese))
[10]
李 宁,段小强,陈方方,等. 围岩松动圈的弹塑性位移反分析方法探索[J]. 岩石力学与工程学报,2006,25(7):1 304-1 308.(LI Ning,DUAN Xiaoqiang,CHEN Fangfang,et al. A back analysis method for elastoplastic displacement of broken rock zone around tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(7):1 304-1 308.(in Chinese))
[11]
武建广,刘晓翔,王新文. 碳质板岩地层大断面隧道变形控制施工技术[J]. 现代隧道技术,2011,48(2):68-72.(WU Jianguang,LIU Xiaoxiang,WANG Xinwen. Deformation control for large profile tunnel in carbonaceous slate stratum[J]. ModernTunnelingTechnology,2011,48(2):68-72.(in Chinese))
[12]
张顶立,王梦恕,高 军,等. 复杂围岩条件下大跨隧道修建技术研究[J]. 岩石力学与工程学报,2003,22(2):290-296(ZHANG Dingli,WANG Mengshu,GAO Jun,et al.Construction technique of large-span tunnel under condition of complicated surrounding rocks[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(2):290-296.(in Chinese))
[13]
刘旭东.特大断面隧道开挖中拱顶沉降的BP神经网络预测[J].城市道桥与防洪,2015,(1):145-150.(LIU Xudong. BP neural network prediction of vault settlement during excavation of large crosssection tunnel[J].Urban Roads Bridges and Flood Control,2015,(1):145-150.(in Chinese))
[14]
张前进.BP网络在隧道施工中预测位移沉降的应用[J].建筑工程技术与设计,2014,(4):567-569.(ZHANG Qianjin.Application of BP network in predicting displacement settlement in tunnelconstruction[J].Architectural Engineering Technology and Besign,2014,(4):567-569.(in Chinese))
[15]
张向东,于少春.改进BP神经网络算法在基坑沉降预测中的应用[J].山西建筑,2007,33(1):5-6.(ZHANG Xiangdong,YU Shaochun.BP neural network algorithms to improve the surrounding surface subsidence in deep foundation pit forecast applications[J]. Shanxi Architecture,2007,33(1):5-6.(in Chinese))