SEVERAL ISSUES ON SIMPLY-CONSTRUCTED WELL OF ELECTRIC TUNNEL WHEN TUNNELS FOLLOWED BY WELL EXCAVATION
MO Haihong1,2,YANG Chunshan1,2,CHEN Junsheng1,2,BAO Shufeng1,2
(1. School of Civil Engineering and Transportation,South China University of Technology,Guangzhou,Guangdong 510641,China; 2. State Key Laboratory of Subtropical Building Science,South China University of Technology,Guangzhou,Guangdong 510641,China)
Abstract:The simply-constructed well which is no inner supporting,efficient and circular was proposed. The comparison between simply-constructed well and conventional scheme was conducted and parameters sensitivity analysis of the well to segment deformation was conducted with finite element method as well as the key technology of structures design was explored. The results show that the construction technology,feasibility and influence on surrounding environment of simply-constructed well are superior to conventional one. The project cost of simply-well is only 7% of the conventional scheme,so it greatly saves the cost. It will form unstable structure when local segments were broken and segment deformations greatly increase. The influencing scope of the deformation is manifested on the snap rings and two segment rings on both sides,so it should add temporary supports for spilt ring and four segment rings which are obviously affected to ensure structures safety. The effect of well thickness and soft soil on segment deformation is significant,while the effect of the diameter and spilt rings is very small. It suggests that the size of working well should not be big on the premise of meeting the requirements of global stiffness and clearance.
莫海鸿1,2,杨春山1,2,陈俊生1,2,鲍树峰1,2. 电力隧道先隧后井施工中简易井应用的若干问题研究[J]. 岩石力学与工程学报, 2014, 33(S2): 3817-3824.
MO Haihong1,2,YANG Chunshan1,2,CHEN Junsheng1,2,BAO Shufeng1,2. SEVERAL ISSUES ON SIMPLY-CONSTRUCTED WELL OF ELECTRIC TUNNEL WHEN TUNNELS FOLLOWED BY WELL EXCAVATION. , 2014, 33(S2): 3817-3824.
YANG CS,MO HH,CHEN JS. Selection of reasonable scheme of entering into a working well in shield construction[J].Electronic Journal of Geotechnical Engineering,2013,18:3987-3998.
[2]
中华人民共和国行业标准编写组.GJB 02——98广州地区建筑基坑支护技术规定[S].广州:[s.n.],1998.(The Professional Standards Compilation Group of People¢s Republic of China.GJB 02——98Code for technique of building foundation pit engineering in Guangzhou[S]. Guangzhou:[s.n.],1998 (in Chinese))
[3]
赵辉. 城市电力电缆隧道的通风设计[J]. 华北电力技术,2009,(6):11-13.(ZHAO Hui. Ventilation design of urban power cable tunnel[J]. North China Electric Power,2009,(6):11-13.(in Chinese))
[4]
中华人民共和国国家标准编写组.GB 5027—2007 电力工程电缆设计规范[S].北京:人民出版社,2007.(The National Standards Compilation Group of People¢s Republic of China.GB 5027—2007Code for design of cables of electric engineering[S]. Beijing:People¢s Publishing House,2007(in Chinese))
[5]
杜金龙,杨 敏. 邻近基坑桩基侧向变形加固控制分析[J]. 结构工程师,2008,24(5):93-99.(DU Jinlong,YANG Min. Deflection control analysis of pile adjacent to deep excavation[J]. Structural Engineers,2008,24(5):93-94.(in Chinese))
[6]
CHEN JS,MO H H. Mechanical behavior of segment rebar of shield tunnel in construction stage[J]. Journal of Zhejiang University,2008,9(7):888-899.
[7]
陈俊生,莫海鸿. 盾构隧道管片施工阶段力学行为的三维有限元分析[J]. 岩石力学与工程学报,2006,25(增2):3482-3489.(CHEN Junsheng,MO Haihong. Three-dimensional finite analysis of mechanicalbehaviors of shield tunnel segment during construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3482-3489.(in Chinese))
[8]
张海波,殷宗泽,朱俊高,等. 盾构法隧道衬砌施工阶段受力特性的三维有限元模拟[J]. 岩土力学,2005,26(6):990-994.(ZHANG Haibo,YIN Zongze,ZHU Jungao,et al. Three-dimensional FEM simulation of shield-driven tunnel lining during construction stage[J]. Rock and Soil Mechanics,2005,26(6):990-994.(in Chinese))
[9]
杨春山,莫海鸿,陈俊生,等. 盾构隧道先隧后井施工法对管片张开量的影响研究[J]. 岩石力学与工程学报,2014,33(增1):2870-2877.(YANG Chunshan,MO Haihong,CHEN Junsheng,et al. Study the influence on segment opening of shield tunneling by tunnels followed by well excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(Supp.1):2870-2877.(in Chinese))
[10]
黄钟晖,廖少明,侯学渊. 错缝拼装衬砌纵向螺栓剪切模型的研究[J]. 岩石力学与工程学报,2004,23(6):952-958.(HUANG Zhonghui,LIAO Shaoming,HOU Xueyuan. Research on shear model of ring joint bolts in stagger-jointed segmental linings[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(6):952-958.(in Chinese))
[11]
张新金,刘维宁,路美丽,等. 盾构法与明挖法结合建造地铁车站的结构方案研究[J]. 铁道学报,2009,31(6):83-90.(ZHANG Xinjin,LIU Weining,LU Meili,et al. Research of metro station structure scheme by enlarging shield tunnel with open cut method[J]. Journal of the China Railway Society,2009,31(6):83-90.(in Chinese))