[1] |
王旭,李 晓,李守定. 关于用岩体分类预测TBM掘进速率AR的讨论[J]. 工程地质学报,2008,16(4):470-475.(WANG Xu,LI Xiao,LI Shouding. Problems in the prediction of the TBM advance rate with rock mass classification and their possible solutions[J]. Journal of Engineering Geology,2008,16(4):470-475.(in Chinese))
|
[2] |
CASSINELLI F,CINA S,INNAURATO N. Power consumption and metal wear in tunnel-boring machines:analysis of tunnel-boring operation in hard rock[C]// Proceedings of the 3rd International Symposium. Brighton:[s. n.],1982:73-81
|
[3] |
BARTON N R. TBM tunnelling in jointed and faulted rock[M]. Boca Raton:CRC Press,2000:170-175.
|
[4] |
BIENIAWSKI Z T,CELADA B,GALERA J M. TBM excavability:prediction and machine-rock interaction[C]// Proceedings of RETC,Toronto:[s. n.],2007:1 118-1 130.
|
[5] |
ALBER M. Advance rates of hard rock TBMs and their effects on project economics[J].Tunnelling and Underground Space Technology,2005, 15(1):55-64.
|
[6] |
LAUGHTON C. Evaluation and prediction of TBM performance in variable rock mass[Ph.D Thesis][D].Austi:The University of Texas,1998.
|
[1] |
王石春. 隧道掘进机与地质因素关系综述[J]. 世界隧道,1998,(2):39-43.(WANG Shichun. Relationship between TBM Tunneling andgeological conditions[J]. World Tunnel,1998,(2):39-43.(inChinese))
|
[2] |
何发亮,谷明成. TBM施工隧道围岩分级方法研究[J]. 岩石力学与工程学报,2002,21(9):1 350-1 354.(HE Faliang,GU Mingcheng.Study on surrounding rock classification of tunnel cut by TBMs[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(9):1 350-1 354. (in Chinese))
|
[7] |
李春明,彭耀荣. TBM施工隧洞围岩分类方法的探讨[J]. 中外公路,2006,26(3):235-237.(LI Chunming,PENG Yaorong.Discussionabout surrounding rock classification of tunnel excavate by TBMs[J]. Journal of China and Foreign Highway,2006,26(3):235-237.(in Chinese))
|
[1] |
张 宁,石豫川,童建刚. TBM施工深埋隧洞围岩分类方法初探[J].现代隧道技术,2010,47(5):11-14.(ZHANG Ning,SHIYuchuan,TONG Jiangang. Discussion on rock classification of TBM excavated deep tunnels[J]. Model Tunnelling Technology,2010,47(5):11-14.(in Chinese))
|
[2] |
王学潮. 南水北调西线工程 TBM 施工围岩分级研究[M]. 郑州:黄河水利出版社,2011:3-25.(WANG Xuechao. Study on surroundingrock classification of tunnel excavate by TBMs of the west route of South to North water transfer project[M]. Zhengzhou:Yellow River Water Conservancy Press,2011:3-25.(in Chinese))
|
[8] |
杨媛媛,黄宏伟. 围岩分类在TBM滚刀寿命预测中的应用[J]. 地下空间与工程学报,2005,1(5):721-724.(YANG Yuanyuan,HUANGHongwei. Application of rock mass classification in cutter life prediction of TBM[J]. Chinese Journal of Underground Space and Engineering,2005,1(5):721-724.(in Chinese))
|
[9] |
祁生文,伍法权,王大国,等. 岩石隧道掘进机(TBM)的施工速度(AR)与围岩分类[C]// 隧道、地下工程及岩石破碎学术研讨会论文集. [S. l.]:[s. n.],2007:67-76.(QI Shengwen,WU Faquan,WANG Daguo,et al. Advance rate of rock tunnel boring machine and surrounding rock classification[C]// Symposium on Tunneling,Underground Engineeringand Rock Fragmentation. [S. l.]:[s. n.],2007:67-76.(in Chinese))
|
[10] |
祁生文,伍法权.基于模糊数学的TBM施工岩体质量分级研究[J]. 岩石力学与工程学报,2011,30(6):1225-1229.(QI Shengwen,WUFaquan. Surrounding rockmass quality classification of tunnel cut by TBM with fuzzy mathematics method[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(6):1 225-1229.(in Chinese))
|
[11] |
闫长斌,路新景. 基于改进的距离判别分析法的南水北调西线工程TBM施工围岩分级[J]. 岩石力学与工程学报,2012,31(7):1446-1451.(YAN Changbin,LU Xinjing. Classification of surrounding rock mass by TBM tunneling based on improved distance discriminant analysis method in west route of South-to-North water transfer project[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(7):1446-1451.(in Chinese))
|
[12] |
王攀,郭 伟,朱殿华. 基于模糊聚类理论的 TBM 施工围岩可掘进性分级预测模型[J]. 现代隧道技术,2014,51(6):58-64. (WANG Pan,GUO Wei,ZHUDianhua. Fuzzy clustering theory based rock mass cuttability classification prediction model for TBM tunneling[J]. Model Tunnelling Technology,2014,51(6):58-64.(in Chinese))
|
[13] |
中华人民共和国国家标准编写组.GB/T 50218—2014工程岩体分级标准[S]. 北京:中国计划出版社,2015.(The National Standards Compilation Group of People¢s Republic of China. GB/T 50218—2014 Standard for engineering classification of rock mass[S].Beijing: China Planning Press,2015.(in Chinese))
|
[14] |
刘泉声,刘建平,潘玉丛,等.硬岩隧道掘进机性能预测模型研究进展[J]. 岩石力学与工程学报,2016,35(增1):2767-2786.(LIU Quansheng,LIU Jianping,PAN Yucong,et al. Research advances of tunnel boring machine performance prediction models for hard rock[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(Supp.1):2767-2786.(in Chinese))
|
[15] |
KLEINS,SCHMOLL M,AVERYT. TBM performance at four hard rock tunnels in California[C]// Rapid Excavation and Tunnelling Conference,[S. l.]:Soc for Mining,Metallurgy andExploration Inc.,1995:61-75.
|
[16] |
BRULAND A. Hard rock tunnel boring[Ph.D Thesis][D]. Trondheim:Norwegian University of Science and Technology,1998.
|
[17] |
ROSTAMI J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure[Ph.D Thesis][D]. Golden:Colorado School of Mines,1997.
|
[18] |
FARROKH E,ROSTAMI J,LAUGHTON C. Study of various models for estimation of penetration rate of hard rock TBMs[J]. Tunnelling and Underground Space Technology,2012,30(1):110-123.
|
[19] |
YAGIZ S. Utilizing rock mass properties for predicting TBM performance in hard rock condition[J]. Tunnelling and Underground Space Technology,2008,23(3):326-339.
|
[20] |
GONG Q M,ZHAO J. Development of a rock mass characteristics model for TBM penetration rate prediction[J]. International Journal of Rock Mechanics and Mining Sciences,2009,46(1):8-18.
|
[21] |
HASSANPOUR J,ROSTAMI J,KHAMEHCHIYAN M,et al. Developing new equations for TBM performance prediction in carbonate-argillaceous rocks:a case history of Nowsood water conveyance tunnel[J]. Geomechanics and Geoengineering:An International Journal,2009,4(4):287-297.
|
[22] |
HASSANPOUR J,ROSTAMI J,KHAMEHCHIYAN M,et al. TBM performance analysis in pyroclastic rocks:a case history of Karaj water conveyance tunnel[J]. Rock Mechanics and Rock Engineering,2010,43(4):427-445.
|
[23] |
HASSANPOUR J,ROSTAMI J,ZHAO J. A new hard rock TBM performance prediction model for project planning[J]. Tunnelling and Underground Space Technology,2011,26(5):595-603.
|
[24] |
刁振兴,薛亚东,王建伟. 引汉济渭工程岭北隧洞TBM利用率分析[J].隧道建设,2015,35(增2):1 361-1368.(DIAO Zhenxing,XUE Yadong,WANG Jianwei. Analysis on TBM availability in construction of Lingbei tunnel of Hanjiang River—Weihe River waterconveyance project[J]. Tunnel Construction,2015,35(Supp.2):1 361-1368.(in Chinese))
|
|
[1]
|